Proposing a General Formula for Evaluating the Parametric Cost Using MLR Method
...Show More Authors

This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the research study of the integration of parametric costs in a predictive model for future study. Changes in the parametric costs of construction projects substantially impact their time, cost, and quality and are a major barrier to their execution, necessitating research, analysis, and the development of the most effective solutions. The study aims to identify the parametric cost accurately through iterative tests and continuous improvements by presenting literature describing the history and characteristics of the parametric cost methodologies and identifying each methodology's limitations, strengths, and weaknesses to promote a better understanding of their best practices and use for managing project cost

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Sep 08 2020
Journal Name
Baghdad Science Journal
A Proposed Analytical Method for Solving Fuzzy Linear Initial Value Problems
...Show More Authors

     In this article, we aim to define a universal set consisting of the subscripts of the fuzzy differential equation (5) except the two elements  and , subsets of that universal set are defined according to certain conditions. Then, we use the constructed universal set with its subsets for suggesting an analytical method which facilitates solving fuzzy initial value problems of any order by using the strongly generalized H-differentiability. Also, valid sets with graphs for solutions of fuzzy initial value problems of higher orders are found.

View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Evaluating health services in the private suites for governmental hospitals from the perspective of patients
...Show More Authors

ABSTRACT                                                                                            

The study aims to identify the level of health services provided in private suites to government hospitals from the perspective of the recipi

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Journal Of Economics And Administrative Sciences
Comparison Between Nelson-Olson Method and Two-Stage Limited Dependent Variables (2SLDV ) Method for the Estimation of a Simultaneous Equations System (Tobit Model)
...Show More Authors

This study relates to  the estimation of  a simultaneous equations system for the Tobit model where the dependent variables  ( )  are limited, and this will affect the method to choose the good estimator. So, we will use new estimations methods  different from the classical methods, which if used in such a case, will produce biased and inconsistent estimators which is (Nelson-Olson) method  and  Two- Stage limited dependent variables(2SLDV) method  to get of estimators that hold characteristics the good estimator .

That is , parameters will be estim

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Mar 01 2010
Journal Name
Journal Of Economics And Administrative Sciences
Planning the main production tables using the correct binary programming method
...Show More Authors

This research include building mathematical models for aggregating planning and shorting planning by using integer programming technique for planning master production scheduling in order to control on the operating production for manufacturing companies to achieve their objectives of increasing the efficiency of utilizing resources and reduce storage and  improving customers service  through  deliver in the actual dates and reducing delays.

View Publication Preview PDF
Crossref
Publication Date
Thu Nov 02 2023
Journal Name
Journal Of Engineering
Verification and Parametric Analysis of Shear Behavior of Reinforced Concrete Beams using Non-linear Finite Element Analysis
...Show More Authors

Many researchers have tackled the shear behavior of Reinforced Concrete (RC) beams by using different kinds of strengthening in the shear regions and steel fibers. In the current paper, the effect of multiple parameters, such as using one percentage of Steel Fibers (SF) with and without stirrups, without stirrups and steel fibers, on the shear behavior of RC beams, has been studied and compared by using Finite Element analysis (FE). Three-dimensional (3D) models of (RC) beams are developed and analyzed using ABAQUS commercial software. The models were validated by comparing their results with the experimental test. The total number of beams that were modeled for validation purposes was four. Extensive pa

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Jun 01 2022
Journal Name
Journal Of Engineering
Evaluating the Moisture Content Variation on Critical Strain of Geo-materials: A Case Study
...Show More Authors

The tunnel’s stability during construction is a very important matter. Some methods have been proposed for stability evaluation, but the hazard warning levels (HWLs) are more applicable among these methods. Despite monitoring and applying HWLs, several collapses in Shibli twin tunnels in Iran have cast doubts on the accuracy of this criterion in the presence of water. In this study, the critical strains under different water contents were measured through uniaxial compressive strength tests on 11 different shale and marl samples. A comparison of laboratory tests and numerical results shows that the influence of the moisture content on the critical strain is negligible. In addition, the results show that there is no dir

... Show More
View Publication Preview PDF
Crossref (1)
Crossref
Publication Date
Mon Dec 01 2014
Journal Name
Journal Of Economics And Administrative Sciences
Material Requirements Planning (MRP) for Electric Geyser Product by Using Goal Programming\ applicative research in the general company of electrical industrialization
...Show More Authors

Material Requirements Planning System (MRP) is considered as one of the planning and controlling of production and inventory systems which is used to prepare plan of the final production requirements and its parts of subcomponents raw materials and the time at which it was needed for the purpose of preparing orders of production and purchase.

The problem of the present work is represented in the general company of electrical industrialization adoption of traditional methods and personal experience of the process of the products and\or purchase quantity and inventory quantities and limiting the required time for acquiring the required quantities of the materials and parts used in the finish product of the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Mar 01 2014
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
The use of technology review and evaluate programs PERT to improve the cost method on the basis of activity: بحث تطبيقي في الشركة العامة للصناعات النسيجية /واسط
...Show More Authors

Suffer most of the industrial sector companies from high Kperfi magnitude of the costs of industrial indirect, lack of equitable distribution of these costs on the objectives of cost, increased competition, and the lack of proper planning in line and changes faced by the industrial sector (general) and sample (private), as well as the difficulty in re- directing efforts to improve profitability and in-depth analysis of activities, and to identify untapped resource activities, then link these activities to the final products  The research aims to apply the technology review and evaluate programs with the method (ABC) through the application stages of planning, scheduling and control and a comparison to get to the products of dev

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 01 2012
Journal Name
Journal Of Economics And Administrative Sciences
Comparison between the empirical bayes method with moments method to estimate the affiliation parameter in the clinical trials using simulation
...Show More Authors

In this research the Empirical Bayes method is used to Estimate the affiliation parameter in the clinical trials and then we compare this with the Moment Estimates for this parameter using Monte Carlo stimulation , we assumed that the distribution of the observation is binomial distribution while the distribution with the unknown random parameters is beta distribution ,finally we conclude that the Empirical bayes method for the random affiliation parameter is efficient using Mean Squares Error (MSE) and for different Sample size .

View Publication Preview PDF
Crossref
Publication Date
Mon Jun 19 2017
Journal Name
Arabian Journal For Science And Engineering
A New Method to Tune a Fractional-Order PID Controller for a Twin Rotor Aerodynamic System
...Show More Authors

View Publication
Scopus (37)
Crossref (34)
Scopus Clarivate Crossref