Proposing a General Formula for Evaluating the Parametric Cost Using MLR Method
...Show More Authors

This research takes up address the practical side by taking case studies for construction projects that include the various Iraqi governorates, as it includes conducting a field survey to identify the impact of parametric costs on construction projects and compare them with what was reached during the analysis and the extent of their validity and accuracy, as well as adopting the approach of personal interviews to know the reality of the state of construction projects. The results showed, after comparing field data and its measurement in construction projects for the sectors (public and private), the correlation between the expected and actual cost change was (97.8%), and this means that the data can be adopted in the research study of the integration of parametric costs in a predictive model for future study. Changes in the parametric costs of construction projects substantially impact their time, cost, and quality and are a major barrier to their execution, necessitating research, analysis, and the development of the most effective solutions. The study aims to identify the parametric cost accurately through iterative tests and continuous improvements by presenting literature describing the history and characteristics of the parametric cost methodologies and identifying each methodology's limitations, strengths, and weaknesses to promote a better understanding of their best practices and use for managing project cost

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun Dec 01 2013
Journal Name
Journal Of Economics And Administrative Sciences
Evoluation of service system in the general eduction Baghdad hospital using Q GERT
...Show More Authors

That the essential contribution of this research is a description of how complex systems analysis service of the properties of the queue in Baghdad Teaching Hospital using a technique network is techniques method (Q - GERT) an acronym of the words:

Queuing theory _ Graphical Evaluation and Review Technique

Any method of assessment and review chart where you will be see the movement flow of patients within the system and after using this portal will be represented system in the form of planned network probabilistic analysis and knowledge of statistical distributions appropriate for times of arrival and departure were using the program ready (Win QSB) and simulatio

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 19 2019
Journal Name
Iraqi Journal Of Agricultural Sciences
ECONOMICAL BEHAVIOR ANALYSIS OF AGRICULTURAL COMPANIES IN IRAQ USING TRANSLOG COST FUNCTION
...Show More Authors

This research aims to identify the productive relationship nature among the elements used in the agricultural companies by estimating the translog cost function. It also aims to recognize the possibility of substituting these elements with each other, to identify the nature of revenues, and economies scale through elasticity of other cost. This research goes further to define the typical use of resources, identify the performance of the companies and their contribution in controlling their cost, and estimating elasticity of substitution (Allen-Uzawa), (Morishima).  The translog cost function was estimated so as the total cost of the agricultural companies is a function of the prices of production and production quantity output  el

... Show More
View Publication
Crossref
Publication Date
Sun Jul 09 2023
Journal Name
Journal Of Engineering
Solving Time-Cost Tradeoff Problem with Resource Constraint Using Fuzzy Mathematical Model
...Show More Authors

Scheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Thu Dec 15 2022
Journal Name
Al-academy
Evaluating the education quality in the College of Fine Arts "Design Department as a model"
...Show More Authors

Education quality evaluation is one of the objectives of education quality. The evaluation includes assessing the education standards and academic program outcomes to develop intellectual, scientific and practical concepts for the educational structure. It considers the determination of the rates of the number of accepted students and graduates. The research focuses on "what are the levels of education quality according to the evaluation mechanisms in the design department" to enhance the quality system and the objectives of theoretical and applied education.
It is identifying the levels of education quality and evaluating it according to the numbers and rates of graduate students of the design department branches for morning and ev

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Sep 08 2020
Journal Name
Baghdad Science Journal
A Proposed Analytical Method for Solving Fuzzy Linear Initial Value Problems
...Show More Authors

     In this article, we aim to define a universal set consisting of the subscripts of the fuzzy differential equation (5) except the two elements  and , subsets of that universal set are defined according to certain conditions. Then, we use the constructed universal set with its subsets for suggesting an analytical method which facilitates solving fuzzy initial value problems of any order by using the strongly generalized H-differentiability. Also, valid sets with graphs for solutions of fuzzy initial value problems of higher orders are found.

View Publication Preview PDF
Scopus (1)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Tue Jun 30 2020
Journal Name
Journal Of Economics And Administrative Sciences
Using the Critical Path Method (CPM) for scheduling the project (paving the Amil Sayid Al-Ayyam Street with a length of 1.25 km) In terms of Decresing the time
...Show More Authors

The implementation of the concept of project scheduling in the organizations generally requires a set of procedures and requirements, So, most important of all is the understanding and knowledge of the tools and techniques which are called the methods of scheduling projects. Consequently, the projects of the municipality administration in the holy governorate of Karbala suffer from the problem of delaying their projects and chaos in the ways of implementation. To provide assistance to this directorate and to demonstrate how to schedule projects using one of the advanced scientific methods that proved their ability to schedule any project and its potential to accelerate the time of completion, as well as ease of use and effectiven

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Aug 01 2020
Journal Name
Heat Transfer
A parametric study of a photovoltaic panel with cylindrical fins under still and moving air conditions in Iraq
...Show More Authors

Scopus (7)
Crossref (8)
Scopus Clarivate Crossref
Publication Date
Wed Dec 01 2021
Journal Name
Journal Of Economics And Administrative Sciences
Comparison Between Nelson-Olson Method and Two-Stage Limited Dependent Variables (2SLDV ) Method for the Estimation of a Simultaneous Equations System (Tobit Model)
...Show More Authors

This study relates to  the estimation of  a simultaneous equations system for the Tobit model where the dependent variables  ( )  are limited, and this will affect the method to choose the good estimator. So, we will use new estimations methods  different from the classical methods, which if used in such a case, will produce biased and inconsistent estimators which is (Nelson-Olson) method  and  Two- Stage limited dependent variables(2SLDV) method  to get of estimators that hold characteristics the good estimator .

That is , parameters will be estim

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Nov 11 2024
Journal Name
Jurnal Teknologi (sciences & Engineering)
THE EXTERNAL DRAFT TUBE GASLIFT BIOREACTOR: HYDRODYNAMIC CHARACTERISTICS AND PARAMETRIC OPTIMIZATION
...Show More Authors

Gaslift reactors are employed in several bioapplications due to their characteristics of cost-effectiveness and high efficiency. However, the nutrient and thermal gradient is one of the obstacles that stand in the way of its widespread use in biological applications. The diagnosis, analysis, and tracking of fluid paths in external draft tube gaslift bioreactor-type are the main topics of the current study. Several parameters were considered to assess the mixing efficiency such as downcomer-to-rizer diameter ratio (Ded/Dr), the position of the diffuser to the height of bioreactor ratio (Pd/Lr), and gas bubble size (Db). The multiple regression of liquid velocity indicates the optimal setting: Ded/Dr is (0.5), Pd/Lr is (0.02), and Db

... Show More
View Publication
Scopus Clarivate Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Evaluating health services in the private suites for governmental hospitals from the perspective of patients
...Show More Authors

ABSTRACT                                                                                            

The study aims to identify the level of health services provided in private suites to government hospitals from the perspective of the recipi

... Show More
View Publication Preview PDF
Crossref