Brainstorming has been a common approach in many industries where the result is not always accurate, especially when procuring automobile spare parts. This approach was replaced with a scientific and optimized method that is highly reliable, hence the decision to optimize the inventory inflation budget based on spare parts and miscellaneous costs of the typical automobile industry. Some factors required to achieve this goal were investigated. Through this investigation, spare parts (consumables and non-consumables) were found to be mostly used in Innoson Vehicle Manufacturing (IVM), Nigeria but incorporated miscellaneous costs to augment the cost of spare parts. The inflation rate was considered first due to the market's price increase. Different types of vehicles were used to implement the Non-preemptive goal programming model and to predict the cost of procurement of the spare parts and miscellaneous and the profit for the current year. The result proved that the solution did not fully achieve the goals since the objective function is not equal to zero, but deviations for going below the profit goal and above the cost of procurement goal were significantly minimized.
This paper proposes a new strategy to enhance the performance and accuracy of the Spiral dynamic algorithm (SDA) for use in solving real-world problems by hybridizing the SDA with the Bacterial Foraging optimization algorithm (BFA). The dynamic step size of SDA makes it a useful exploitation approach. However, it has limited exploration throughout the diversification phase, which results in getting trapped at local optima. The optimal initialization position for the SDA algorithm has been determined with the help of the chemotactic strategy of the BFA optimization algorithm, which has been utilized to improve the exploration approach of the SDA. The proposed Hybrid Adaptive Spiral Dynamic Bacterial Foraging (HASDBF)
... Show MoreThe aim of the research is to present and discuss the subject of the budgeting estimates and how to activate the role of the Federal board of supreme audit in examining these estimates through reference to Articles 6 and 10 of the Federal board of supreme Law, which did not restrict Federal board of supreme in Preventive control on examination process for planning which is prepared from the government units, as the result of a large amount of government units Provisions and the weakness of estimates in most of its items, which rely on personal assessment and not based on scientific and logical basis of the estimate, which leads to the emergence of a deficit is not true in the general budget and this seems clear in most Iraq
... Show MoreThe aim of this study is to develop a novel framework for managing risks in smart supply chains by enhancing business continuity and resilience against potential disruptions. This research addresses the growing uncertainty in supply chain environments, driven by both natural phenomena-such as pandemics and earthquakes—and human-induced events, including wars, political upheavals, and societal transformations. Recognizing that traditional risk management approaches are insufficient in such dynamic contexts, the study proposes an adaptive framework that integrates proactive and remedial measures for effective risk mitigation. A fuzzy risk matrix is employed to assess and analyze uncertainties, facilitating the identification of disr
... Show MoreObjective: Evaluation the national standards for exposure to chemical materials and dusts in The State
Company for Drugs Industry in Samarra.
Methodology: A descriptive evaluation design is employed through the present study from 25th May 2011
to 30th November 2011 in order to evaluate the national standards for exposure chemical materials and dusts
in The State Company for Drugs Industry in Samarra. A purposive (non-probability) sample is selected for the
study which includes (110) workers from the State Company for Drugs Industry in Samarra. Data were
gathered through the workers` interviewed according to the nature of work that they perform. The evaluation
questionnaire comprised of three parts which include the w
Bacteria strain H8, which produces high amount of exopolysaccharide (EPS), was isolated from soil, and identified as strain of Azotobacter chrococcum by its biochemical /physiological characteristics, EPS was extracted, partially purified and used as bioflocculant. The biochemical analysis of the partially purified EPS revealed that it was an alginate. analysis of EPS by Fourier transform infrared spectrometry (FTIR) show that the -OH groups present in bioflocculant are clearly seen at 3433.06 cm-1, the peaks attributed to the -CH3 groups present at 2916.17 cm-1 , and some distinct peaks such as carboxyl group showed strong absorption bands at 1604.66 cm-1, 1411.80 cm-1 and 1303.79 cm-1 indicate the chemical structure of alginate. The effe
... Show MoreSummary The aim of this study is the evaluation the resistance of S. marcescence obtained from soil and water to metals chlorides (Zn+2, Hg+2, Fe+2, Al+3, and Pb+2). Four isolates, identified as Serratia marcescence and S. marcescena (S4) were selected for this study according to their resistance to five heavy metals. The ability of S. marcescena (S4) to grow in different concentrations of metals chloride (200-1200 µg/ml) was tested, the highest concentration that S. marcescence (S4) tolerate was 1000 µg/ml for Zn+2, Hg+2, Fe+2, AL+3, pb+2 and 300 µg/ml for Hg+2 through 24 hrs incubation at 37 Co. The effects of temperature and pH on bacteria growth during 72 hrs were also studied. S. marcescence (S4) was affected by ZnCl2, PbCl2, FeC12
... Show MoreThe subject of an valuation of quality of construction projects is one of the topics which it becomes necessary of the absence of the quantity standards in measuring the control works and the quality valuation standards in constructional projects. In the time being it depends on the experience of the workers which leads to an apparent differences in the valuation.
The idea of this research came to put the standards to evaluate the quality of the projects in a special system depending on quantity scale nor quality specifying in order to prepare an expert system “ Crystal “ to apply this special system to able the engineers to valuate the quality of their projects easily and in more accurate ways.