Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadwork projects in Bahrain. The results are shown in terms of the sensitivity of changing one variable on the performance of all the 72 projects. These results can reflect on the methods currently used on contractors’ assessments in the tendering stage and support decision-makers in assessing contractors and selecting the best bidders.
Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show MoreAbstract:
Sought the search to find out what small businesses, the importance of funding, and the role of funders in supporting such projects, which have been addressed in the search through a sample of government banks (Rafidain and Rasheed) and private banks (the Middle East, the Gulf, North, Assyria) and a sample of Small projects borrowed from these banks, but in order to achieve that rely researchers on scientific methods discreet marked by the curriculum descriptive analytical method which is based on the compilation of facts and information then collated and analyzed to reach acceptable results, as well as data collection tool (checklist) was whereby examine questions of a sample of
... Show MoreAbstract
The study seeks to use one of the techniques (Data mining) a (Logic regression) on the inherited risk through the use of style financial ratios technical analysis and then apply for financial fraud indicators,Since higher scandals exposed companies and the failure of the audit process has shocked the community and affected the integrity of the auditor and the reason is financial fraud practiced by the companies and not to the discovery of the fraud by the auditor, and this fraud involves intentional act aimed to achieve personal and harm the interests of to others, and doing (administration, staff) we can say that all frauds carried out through the presence of the motives and factors that help th
... Show MoreThe current study aimed to identify the role of the theatrical technical supervisor in developing and enhancing the skills of middle school students in Baghdad. The sample consisted of 73% of the original community of theatrical technical supervisors, randomly selected from those working in the first, second, and third educational directorates in the Rassafa and Karkh areas. The sample size was 32 theatrical technical supervisors. The study used a questionnaire to collect data on three axes: the cognitive skills developed by the theatrical technical supervisor, the voice and speech skills developed by the supervisor, and the body movement skills developed by the supervisor. The results showed that the theatrical technical supervisor play
... Show MoreBackground: Postpartum hemorrhage is an important cause of maternal morbidity and mortality. Considerable difference of opinion exist regarding the optimal approach to the management of the 3rd stage of labour, practice varies between countries &between units.Objectives: To evaluate the effectiveness of intra umbilical vein injection of oxytocin and umbilical cord driange in shortening the duration of third stage of labour.Patient and Methods: In this randomized controlled study, 100 women were enrolled in this study they divided into three groups. (Group 1 ,N =30 )received 20 units of oxytocin diluted in 20 ml 0.9% saline solution injected in the umbilical vein after clamping.(Group 2, N = 34) placental cord drainage.(Group 3,
... Show MoreThe current research deals with the subject of spatial transformations and visual construction in contemporary theater. How the visual system works to create spatial diversity in the contemporary Iraqi theater performance and how visual construction contributes to a spatial development process capable of building a tourism system that creates an architectural architecture that leaves the topography of the scriptural architecture. And the production of various indications and patterns in the scene of theatrical presentation in order to produce the new foundational meaning by creating a new structure that leads to diversity and diversity in the visual system and the beginning of visual constructions and their applications. Knowledge and te
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a
... Show More