Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance pa
Serial tendering is better than other types of tendering when it comes to cost reduction, where civil infrastructure projects need a significant increase in the amount of tough planning, financial expenditures, engineering work, and resources of a different character than other types of construction projects. The effects of a lack of funding cause decrease in the completion speed of the project on time. The need to reduce the cost of bidding on recurrent civil infrastructure projects is critical. To achieve the desired goals of this research, this article will provide an overview of the type of bids used in the construction of schools implemented in the current financial perspective i
Green buildings are considered more efficient than traditional buildings due to the incorporated techniques and the multidisciplinary specializations required to comply with their specifications, in addition to the advanced commissioning, which undergoes before handing over the buildings to the owners to ensure requirements conformance. As a result, the appropriate selection of a project delivery system acts as the essential factor that affects the performance of the project. This research aims at building a system that helps to select the best method to implement green buildings. Through studying the recent research approaches in project delivery systems, the factors that affect the selection of the optimal implementation method fo
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MoreIraq has witnessed development in many fields and the electricity production sector is one of the most important of these fields. This is attributed to the State’s philosophy in supporting this sector through the development of economic development projects to serve and raise the level of the Iraqi individual. Electricity production in Iraq is affected by many variables such as load growth, economic and financial conditions, planning, etc. All these led to a disparity in the production of electric power to cover the demand for energy. The paper deals with the electricity generation sector overview in Iraq, Analysis of the effects of variables on the implementation of power generatio
This study aims to preparation a standards code for sustainability requirements to contribute in a better understanding to the concept of sustainability assessment systems in the dimensions of Iraqi projects in general and in the high-rise building. Iraq is one of the developing countries that faced significant challenges in sustainability aspects environmental, economic and social, it became necessary to develop an effective sustainability building assessment system in respect of the local context in Iraq. This study presented a proposal for a system of assessing the sustainability requirements of Iraqi high rise buildings (ISHTAR), which has been developed through several integrated
To translate sustainable concepts into sustainable structure, there is a require a collaborative work and technology to be innovated, such as BIM, to connect and organize different levels of industry e.g. decision-makers, contractors, economists, architects, urban planners, construction supplies and a series of urban planning and strategic infrastructure for operate, manage and maintain the facilities. This paper will investigate the BIM benefits as a project management tool, its effectiveness in sustainable decision making, also the benefit for the local industry key stakeholders by encouraging the BIM use as a project management tool to produce a sustainable building project. This p