Preferred Language
Articles
/
joe-1093
Examining sensitivity of financial performance at construction projects prequalification stage
...Show More Authors

Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial ‎requirements restrict the ‎contractors to meet minimum limits in financial criteria such as net worth, working capital and ‎annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadwork projects‎ in Bahrain. The results are shown in terms of the sensitivity of changing one variable on the performance of all the 72 projects. These results can reflect on the methods currently used on contractors’ assessments in the tendering stage and support decision-makers in assessing contractors and selecting the best bidders.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sun May 02 2021
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Application of banking institutions' governance variables and their impact on financial performance as measured by (ROA & ROE): an applied study on a sample of local Islamic banks listed on the Iraq Stock Exchange
...Show More Authors

The research seeks to achieve its goal of demonstrating the impact of applying banking governance variables on the financial performance of Islamic banks, and the independent research variables are represented by (X) by (the number of independent members in the board (X1), the number of directors in the board (X2), the number of committees emanating from the board ( X3), the percentage of shares owned by major shareholders in the board (X4), the number of members of the Sharia supervisory board (X5)), and the dependent variable (Y) is represented by (rate of return on assets (Y1), rate of return on equity (Y2)).

The research sample included (4) Islamic banks, namely (Iraqi Islamic Bank, National Islamic Bank, Jihan Islamic Bank,

... Show More
View Publication Preview PDF
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Performance evaluation of small and medium-sized enterprises according to the entrance of the scorecard applied study in company Al fadly for construction industries
...Show More Authors

The research Aim is to provide support to small enterprises by providing tools that enable measurement and test their performance and identifying weaknesses and work on them is determined by the problem of searching using traditional assessment methods for small projects with only financial performance measurement standards that do not provide a complete picture of the performance of these projects so use the balanced scorecard the four pillars (financial, customer, learning and growth, and internal processes) and identify deviations and work on them through the use of the outputs of the programme (probe), PROmoting Business Excellence-PROBE), which It is a model of performance evaluation, with which you can deve

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2017
Journal Name
Journal Of Telecommunication, Electronic And Computer Engineering
The critical success factors (CSFs) for IT projects
...Show More Authors

Huge yearly investments were made by organizations for the development and maintenance. However, it has been reported that most of the IT projects fails as it is delayed, over budget and discontinued quality. A systematic literature review (SLR) was conducted to identify the critical success factors (CSFs) for the IT projects. Nine (9) CSFs was identified from the SLR. An online survey was conducted among 103 respondents from developers and IT managers. The data was analyzed using the Statistical Package for Social Science (SPSS 22). The findings showed that the highest CSFs of IT projects is commitment and motivation. Project monitoring was found the lowest score ranked by respondents.

Scopus (19)
Scopus
Publication Date
Wed Jan 01 2020
Journal Name
International Journal Of Engineering Business Management
Using ANN in emergency reconstruction projects post disaster
...Show More Authors

The purpose of this study is to avoid delays and cost changes that occur in emergency reconstruction projects especially in post disaster circumstances. This study is aimed to identify the factors that affect the real construction period and the real cost of a project against the estimated period of construction and the estimated cost of the project. The case study is related to the construction projects in Iraq. Thirty projects in different areas of construction in Iraq were selected as a sample for this study. Project participants from the projects authorities provided data about the projects through a data collection distributed survey made by the authors. Mathematical data analysis was used to construct a model to predict change

... Show More
View Publication
Scopus (6)
Crossref (12)
Scopus Clarivate Crossref
Publication Date
Fri Apr 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
Financial investment strategies – Conceptual Framework
...Show More Authors

The investor needs to a clear strategy for the purpose of access to the financial market, that is, has a plan to increase The share of the profits thinking entrepreneur and new, and highlights the importance of this in that it sets for the investor when it goes to the market, and when it comes out of it, and at what price to buy or sell the stock, and what is the the amount of money it starts. Fortunately, he does not need to invent his own investment strategy, because over the years the development of effective methods of buying and selling, and once you understand how to work these methods investor can choose the most appropriate methods and adapted image that fit his style investment .

  &nb

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Nov 04 2012
Journal Name
Journal Of The College Of Basic Education
Double Stage Shrinkage Estimator in Pareto Distribution
...Show More Authors

View Publication Preview PDF
Publication Date
Thu Dec 30 2021
Journal Name
Al-kindy College Medical Journal
Palestinian Experience in Stage Four Pressure Ulcer
...Show More Authors

Pressure ulcer (now called Pressure injury) happens when the bony prominence like the sacrum exposes to pressure for a long period and also can cause soft tissue injury. In order to prevent and cure pressure-induced wounds, continuous and attentive repositioning is necessary. Wound management begins with the identification and aggressive management of the modifiable factors, such as positioning, incontinence, spasticity, diet, devices, and medical comorbidity, which contribute to pressure injury formation. Initial interventions include washing, cleaning, and maintaining the surfaces of the wound. In certain cases, it may be sufficient to debride the non-viable or contaminated tissue; however, operational care in more severe cases

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Mar 02 2008
Journal Name
Baghdad Science Journal
Design and construction of Video extractor
...Show More Authors

Design and construction of video extractor circuit require an understanding of several parameters, which include: Selector circuit, extracting circuit which contains sampling signal and multiplexing. At each radar pulse, the video signal is fed to one of the selector. The fast filter has a pass –band from 190 Hz to 1800 Hz. These frequencies correspond to targets having radial velocities laying between and 10 Kph and 200 Kph.Slow filter: 60 Hz to 230 Hz for radial velocities laying between 3.5 and 13 Kph.The video- extractor is organized in four PCB CG (A-B-C-D) each one having 16 selector. The sampling signal (ADS) (1-2-3-4) control the 4-line-to-16-line decoders. 8 multiplexers of 8 inputs each, are required for the multiplexing of the

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Feb 03 2019
Journal Name
Journal Of The College Of Education For Women
Place philosophy of dramatic show construction
...Show More Authors

0

View Publication Preview PDF
Publication Date
Sun Apr 30 2017
Journal Name
Journal Of Engineering
Evaluation of Urban Planning Projects Criteria Using Fuzzy AHP Technique
...Show More Authors

In this research,  Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP) which is one of  multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP) technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect.  The la

... Show More
View Publication Preview PDF