Construction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadwork projects in Bahrain. The results are shown in terms of the sensitivity of changing one variable on the performance of all the 72 projects. These results can reflect on the methods currently used on contractors’ assessments in the tendering stage and support decision-makers in assessing contractors and selecting the best bidders.
When the number of confirmed coronavirus disease cases rose in Iraq in the middle of February 2021, the Iraqi government performed a closure approach to constrain mobility and factory operations and enforce social distancing. In this research, the concentrations of air components (PM2.5, PM10, nitrogen dioxide (NO2) and ozone (O3)), which represent herein the degree of air quality index, were recorded, drawn and evaluated over central (Baghdad, the capital), northern (Kirkuk Province) and southern (Basra Province) Iraq before and during the closure. The experimental duration of this research was 6 months (from 1 January 2021 to 30 June 2021), which
... Show MoreIn light of the rapid changes in the business environment and the entry of administrative leaders in the challenges of the atheist and twenty- increasing competition between sectors and the desire to acquire the skills, the traditional methods are no longer viable, which requires doing evaluates performance according to a more holistic, rather than limiting the performance evaluation on the financial hub that has not longer enough alone, as well as benchmarking method that has proven successful in developed countries as a way to develop and improve products and services.
I've touched your search to the development of indicators evaluating the performance and preparation of a mechanism for making comparisons of reference between o
... Show MoreThe determination of river pollution impact on the performance of water treatment plants is achieved by two main objectives. The first is to study raw and treated water qualities and comparing them with standards and the second is to evaluate the treatment plants efficiency. The analyzed data were those water quality parameters in relation to physical, chemical and bacteriological characteristics for river water and produced water by seven water treatment plants located on Tigris River passing through Baghdad City.
The results of this study indicated that all raw water characteristic are within the surface water standards established by Iraqi and USA criteria except Bacterial Counts.
Tigris River water is of good quality to be trea
Sloped solar chimney system is a solar chimney power plant with a sloped collector. Practically, the sloped collector can function as a chimney, then the chimney height can be reduced and the construction cost would be reduced.The continuity, Naver-stockes, energy and radiation transfer equations have been solved and carried out by Fluent software. The governing equations are solved for incompressible, 3-D, steady, turbulent standard model with Boussiuesq approximation to develop for the sloped solar chimney system in this study and evaluate the performance of solar chimney power plant in Baghdad city of Iraq numerically by Fluent (14) software with orking conditions such as solar radiation intensity (30
... Show More