Iraq has witnessed development in many fields and the electricity production sector is one of the most important of these fields. This is attributed to the State’s philosophy in supporting this sector through the development of economic development projects to serve and raise the level of the Iraqi individual. Electricity production in Iraq is affected by many variables such as load growth, economic and financial conditions, planning, etc. All these led to a disparity in the production of electric power to cover the demand for energy. The paper deals with the electricity generation sector overview in Iraq, Analysis of the effects of variables on the implementation of power generation projects in Iraq, and Creating a mathematical model. The results enable decision-makers to prioritize the implementation of power generation projects in Iraq.
The main purpose of this work is the construction of an optical parametric amplifier (OPA) to generate a 629 nm pulsed laser. KTP nonlinear crystals were used for both parametric oscillation and amplification. A singly resonant parametric oscillator (OPO) is constructed to generate a signal of 1.54 μm and idler of 3.4 μm when the OPO system is pumped by 1.064 μm Q – switched Nd: YAG laser. The signal was then mixed with the pumping beam in OPA system to form the wanted wavelength. The obtained optical conversion efficiency was 60%.
Key generation for data cryptography is vital in wireless communications security. This key must be generated in a random way so that can not be regenerated by a third party other than the intended receiver. The random nature of the wireless channel is utilized to generate the encryption key. However, the randomness of wireless channels deteriorated over time due to channel aging which casing security threats, particularly for spatially correlated channels. In this paper, the effect of channel aging on the ciphering key generations is addressed. A proposed method to randomize the encryption key each coherence time is developed which decreases the correlation between keys generated at consecutive coherence times. When compared to the
... Show Moreأثبتت الشبكات المحددة بالبرمجيات (SDN) تفوقها في معالجة مشاكل الشبكة العادية مثل قابلية التوسع وخفة الحركة والأمن. تأتي هذه الميزة من SDN بسبب فصل مستوى التحكم عن مستوى البيانات. على الرغم من وجود العديد من الأوراق والدراسات التي تركز على إدارة SDN، والرصد، والتحكم، وتحسين QoS، إلا أن القليل منها يركز على تقديم ما يستخدمونه لتوليد حركة المرور وقياس أداء الشبكة. كما أن المؤلفات تفتقر إلى مقارنات بين الأدوات والأ
... Show MoreThis paper included derivative method for the even r power sums of even integer numbers formula to approach high even (r+2) power sums of even integer numbers formula so on we can approach from derivative odd r power sums of even integer numbers formula to high odd (r+2) power sums of even integer numbers formula this derivative excellence have ability to used by computer programming language or any application like Microsoft Office Excel. Also this research discovered the relationship between r power sums of even integer numbers formula and both formulas for same power sums of odd integer numbers formula and for r power sums of all integer numbers formula in another way.
The book gives details about the healing power of love
In this research, Fuzzy Analytic Hierarchy Process technique is applied (Fuzzy AHP) which is one of multi-criteria decision making techniques to evaluate the criteria for urban planning projects, the project of developing master plan of Al-Muqdadiyah city to 2035 has been chosen as a case study. The researcher prepared a list of criteria in addition to the authorized departments criteria and previous researches in order to choose optimized master plan according to these criteria. This research aims at employing the foundations of (Fuzzy AHP) technique in evaluating urban planning criteria precisely and flexible. The results of the data analysis to the individuals of the sample who are specialists, in this aspect. The la
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show MoreThe paper presents a highly accurate power flow solution, reducing the possibility of ending at local minima, by using Real-Coded Genetic Algorithm (RCGA) with system reduction and restoration. The proposed method (RCGA) is modified to reduce the total computing time by reducing the system in size to that of the generator buses, which, for any realistic system, will be smaller in number, and the load buses are eliminated. Then solving the power flow problem for the generator buses only by real-coded GA to calculate the voltage phase angles, whereas the voltage magnitudes are specified resulted in reduced computation time for the solution. Then the system is restored by calculating the voltages of the load buses in terms
... Show More