To translate sustainable concepts into sustainable structure, there is a require a collaborative work and technology to be innovated, such as BIM, to connect and organize different levels of industry e.g. decision-makers, contractors, economists, architects, urban planners, construction supplies and a series of urban planning and strategic infrastructure for operate, manage and maintain the facilities. This paper will investigate the BIM benefits as a project management tool, its effectiveness in sustainable decision making, also the benefit for the local industry key stakeholders by encouraging the BIM use as a project management tool to produce a sustainable building project. This paper presented a basic idea about the Building Information Model (BIM) technique and explain the levels of BIM and its dimension, the potential of BIM in sustainability design and the role of BIM in sustainability aspects had been discussed. The role of BIM in the planning and design stages explained the BIM role in sustainability rating system and grant credits in classification processes. Processing of creating 6D had been detailly explaining starting from the framework (ISO 1440) which adopted in the processing of establishing 6D complete system, phases of this system, and development steps from 3D to 4D, 4D to 5D and 5D to 6D. The 6D model features in the sustainability buildings had been explained in this research. As a result, many conclusions have been reached, the most important is there are still significant constraints in adopting of the integration approach between the (BIM) technology with sustainability in Iraqi buildings projects, both are facing great challenges in terms of economic, technical and the awareness level of government and society.
One of the most important features of the Amazon Web Services (AWS) cloud is that the program can be run and accessed from any location. You can access and monitor the result of the program from any location, saving many images and allowing for faster computation. This work proposes a face detection classification model based on AWS cloud aiming to classify the faces into two classes: a non-permission class, and a permission class, by training the real data set collected from our cameras. The proposed Convolutional Neural Network (CNN) cloud-based system was used to share computational resources for Artificial Neural Networks (ANN) to reduce redundant computation. The test system uses Internet of Things (IoT) services through our ca
... Show MoreIn this work, radius of shock wave of plasma plume (R) and speed of plasma (U) have been calculated theoretically using Matlab program.
There are many varied studies that dealt with the dramatic construction, especially books and studies that addressed drama in its construction and the method of writing it, that no textbook or a general cultural content is void of tackling the dramatic text in its construction and how the dramatic action develops in it. Therefore, a question occurs to the mind about the feasibility of dealing with the dramatic construction in this time, where many contemporary studies of dramatology and its relation and the contemporary critical directions are accumulating. This question many have two realistic aspects, yet the novelty and originality that this research shows lie in addressing a refined linguistic text in its style and connotations, such
... Show MoreThe study seeks to investigate the effect of Dunn Dunn learning style model on students’ achievement. Besides, the way of developing students’ deductive thinking by testing the null hypothesis: there is no significant difference between experimental group who takes Dunn Dunn model as style in studying geography and control group that follows a traditional method in studying geography at the level of (0,05). Additionally, there is no significant difference between experimental group who takes Dunn Dunn model as style in studying geography and control group that follows a traditional method in studying geography at the level of (0,05) on testing developing deductive thinking skills. The researcher adopted a quasi-experimental posttest
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreUtilizing the Turbo C programming language, the atmospheric earth model is created from sea level to 86 km. This model has been used to determine atmospheric Earth parameters in this study. Analytical derivations of these parameters are made using the balancing forces theory and the hydrostatic equation. The effects of altitude on density, pressure, temperature, gravitational acceleration, sound speed, scale height, and molecular weight are examined. The mass of the atmosphere is equal to about 50% between sea level and 5.5 km. g is equal to 9.65 m/s2 at 50 km altitude, which is 9% lower than 9.8 m/s2 at sea level. However, at 86 km altitude, g is close to 9.51 m/s2, which is close to 15% smaller than 9.8 m/s2. These resu
... Show More