To translate sustainable concepts into sustainable structure, there is a require a collaborative work and technology to be innovated, such as BIM, to connect and organize different levels of industry e.g. decision-makers, contractors, economists, architects, urban planners, construction supplies and a series of urban planning and strategic infrastructure for operate, manage and maintain the facilities. This paper will investigate the BIM benefits as a project management tool, its effectiveness in sustainable decision making, also the benefit for the local industry key stakeholders by encouraging the BIM use as a project management tool to produce a sustainable building project. This paper presented a basic idea about the Building Information Model (BIM) technique and explain the levels of BIM and its dimension, the potential of BIM in sustainability design and the role of BIM in sustainability aspects had been discussed. The role of BIM in the planning and design stages explained the BIM role in sustainability rating system and grant credits in classification processes. Processing of creating 6D had been detailly explaining starting from the framework (ISO 1440) which adopted in the processing of establishing 6D complete system, phases of this system, and development steps from 3D to 4D, 4D to 5D and 5D to 6D. The 6D model features in the sustainability buildings had been explained in this research. As a result, many conclusions have been reached, the most important is there are still significant constraints in adopting of the integration approach between the (BIM) technology with sustainability in Iraqi buildings projects, both are facing great challenges in terms of economic, technical and the awareness level of government and society.
Breast cancer is the most diagnosed form of malignant tumour in Iraqi women. Tamoxifen and trastuzumab are highly effective adjuvant therapy for breast cancer. This study's objectives were to define the patient's belief in tamoxifen or trastuzumab when used as adjuvant therapy and to determine the variation in belief between the two medications in a sample of Iraqi breast cancer patients. The cross-section survey was conducted using the BMQ-Specific questionnaire. Ninety-seven participants (sixty-seven tamoxifen, thirty trastuzumab) participated in this study. The mean of specific-necessity scale for tamoxifen was (3.7) and for trastuzumab (4). The findings showed a high necessity for both medicines, and there were
... Show MoreBreast cancer is the most diagnosed form of malignant tumour in Iraqi women. Tamoxifen and trastuzumab are highly effective adjuvant therapy for breast cancer.
This study's objectives were to define the patient's belief in tamoxifen or trastuzumab when used as adjuvant therapy and to determine the variation in belief between the two medications in a sample of Iraqi breast cancer patients.
The cross-section survey was conducted using the BMQ-Specific questionnaire. Ninety-seven participants (sixty-seven tamoxifen, thirty trastuzumab) participated in this study.
The mean of specific-necessity scale for tamoxifen was (3.7) and for trastuzumab (4). The findings showed a high necessity for both medicines, and there wer
... Show MoreThe last decade has seen a variety of modifications of glass-ionomer cements (GICs), such as inclusion of bioactive glass particles and dispensing systems. Hence, the aim was to systematically evaluate effect of mixing modes and presence of reactive glass additives on the physical properties of several GICs.
The physical properties of eight commercial restorative GICs; Fuji IX GP Extra (C&H), KetacTM Fill Plus Applicap (C&H), Fuji II LC (C&H), Glass Carbomer Ce
Variation orders are an on-going phenomenon in construction and industry projects worldwide, particularly in the province of Sulaimani, where the project's damage from cost and schedule overrun because of variation orders. However, the effect on project costs and time overrun of variation order has yet to be identified. This study evaluates the impact of variation orders on the cost and time off in the Sulaimani governorate. Two hundred twenty-eight projects from various construction sectors built between 2007-2012 were adopted to calculate the contract cost and schedule overruns due to variation orders. Data analysis was applied in the study were descriptive statistics. One-way ANOVA was also applied to determine w
... Show MoreOften requires the investor to know the result of the company's activity contribute to the investor or by wanting to invest in them because profit or loss of the company affect positively or negatively in the price of shares of the company and with the end of the fiscal year delayed companies often to issue its financial statements after it is approved and audited by an observer External Auditor, From here came the idea of research that appears to stakeholders of financial statements proactive appear, including actual figures for earlier stages have been prepared lists about lists and planned by the administration reflect the results of its phase remainder of the year as if they are (half a year or season or month) to offer At the
... Show MoreThe university press is an essential pillar in building an academic community to achieve its objectives in the service of society. Since the university press is a means of university media, which is issued by the departments or units of media in Iraqi universities as academic governmental-institutions, so it highlights the activities of the university and link them to its internal society in the first place as the university press is a mirror of the university and its voice is sincerely expressed. This research comes to know the extent of interest of the university press in various student issues.
In order to identify the problem of the research, the method of content analysis was adopted within the survey method
... Show MoreContracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show MoreAbstract:
Current research has sought to apply the criteria of potential for altmizalaorbi model EFQM 2013 in assessing the performance of the Inspector General's Office/Ministry of health, so as to keep up with a modern and advanced management methods in the evaluation of performance, as well as to link performance to a citizen's life, and it takes him beyond the accepted service capabilities today, but of budget duties between dealers servicing responsibilities and future planning, financial control, competitiveness, human resources needs and maintaining quality and development, as well as the constant quest for continuous improvement, is the spirit of the principle underpinning the European Foundation Quality managemen
... Show More