Preferred Language
Articles
/
ZBY0SYcBVTCNdQwCvEKB
Sustainability and recovery project management implementation on construction projects in Iraq
...Show More Authors

Scopus
Publication Date
Fri Jun 01 2018
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Employment cost management tools in the fast-track method Of the constructionindustries for the purpose of rationalizing costs: An applied research in the Shatt al-Diwaniya transference project General Authority for projects of irrigation and reclamation
...Show More Authors

The important factor in the success of construction projects is its ability to objective estimate of the cost of the project and adapt to the changes of the external environment, which is affected by a lot of elements and the requirements of the competitive environment. The faces of those projects are several problems in order to achieve particular goals. To overcome these difficulties has been the development of research in the last two decades and turn the focus on the role of the cost of project management, by providing information and assist management in planning and control of the budget among the main elements of the project, namely, (time-cost-quality),The research aims at the possibility of developing and implementing mechanisms

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Nov 01 2022
Journal Name
Journal Of Engineering
Artificial Neural Network Model for Wastewater Projects Maintenance Management Plan
...Show More Authors

Wastewater projects are one of the most important infrastructure projects, which require developing strategic plans to manage these projects. Most of the wastewater projects in Iraq don’t have a maintenance plan. This research aims to prepare the maintenance management plan (MMP) for wastewater projects. The objective of the research is to predict the cost and time of maintenance projects by building a model using ANN. The research sample included (15) completed projects in Wasit Governorate, where the researcher was able to obtain the data of these projects through the historical information of the Wasit Sewage Directorate. In this research artificial neural networks (ANN) technique was used to build two models (cost

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Thu Aug 01 2019
Journal Name
Journal Of Economics And Administrative Sciences
The role of Electronic human resources management practices in the sustainability of knowledge capital
...Show More Authors

Abstract:

The aim of the research is to highlight the role of electronic human resources management practices in the sustainability of knowledge capital as one of its success factors, as well as the diagnosis and interpretation of the relationship between research variables and their dimensions. The research problem is that the University of Babil implements some electronic human resources management practices not in a complete way, The level of its application and the problems it faces, as well as the extent to which these practices reflect the knowledge capital and sustainability in the university, and highlights the importance of research as it is concerned with the electronic aspects and achieve the competitive advant

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jul 22 2023
Journal Name
Journal Of Engineering
Use of Gis for Creating a Project Management Data Base in Baghdad Al-Rissfa
...Show More Authors

The main objective of resources management is to supply and support the site operation with necessary resources in a way to achieve the required timing in handing over the work as well as to achieve the cost-realism within the budget estimated. The research aims to know the advantage of using GIS in management of resources as one of the new tools that keep pace with the evolution in various countries around the world also collect the vast amount of spatial data resources in one environment easily to handled and accessed quickly and this help to make the right decision regarding management of resources in various construction projects. The process of using GIS in the management and identification of resources is of extreme importance in t

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Dec 01 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Cost technique based on ABCII specifications and its effect in the Implementation of contracting contracts: Applied research in Al-Mansour general company for construction contracting
...Show More Authors

The problem of research was to identify after the use of cost technology based on specifications in the validity of determining and measuring the costs of the implementation of contracting, by applying to al-Mansour General Construction Contracting Company as an appropriate alternative to the traditional costing system currently adopted, which is characterized by many shortcomings and weaknesses Which has been reflected in the validity and integrity of the calculations. To solve this problem, the research was based on the premise that: (The application of cost technology based on specifications will result in calculating the cost of the product according to the specification required by the customer, to meet his wishes properly and witho

... Show More
View Publication Preview PDF
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Engineering
Factors Affecting Labor Productivity on Construction in Kurdistan of Iraq: Web Survey
...Show More Authors

This study was set out to investigate factors affecting labor productivity on construction in the north of Iraq (Kurdistan) and to rank all the factors based on engineers, contractors, and designer’s opinions. 76 factors were analyzed based on previous literature and a pilot study. Next, by using online Google Form, a questionnaire form was created and sent to people who have experience in the construction industry. Afterward, the questionnaire form was sent to targeted people by email and social media apps. Factors were divided into nine groups “Management, Technical and Technology, Human and Workforce, Leadership, Motivation, Safety, Time, Material and Equipment, and External”. However, 202 respondents participated in this study,

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Mon Jun 01 2009
Journal Name
Journal Of Economics And Administrative Sciences
Use sensitivity analysis in evaluating projects Investment under the conditions of risk and uncertainty Case study of glass bottles project in Anbar province
...Show More Authors

This paper studies the investment project evaluation under the condition of uncertainty. Evaluation of investment project under risk and uncertainty is possible to be carried out through application of various methods and techniques. The best known methods are : Risk-adjusted discount rate , certainty equivalent method , Sensitivity analysis and Simulation method The objective of this study is using the sensitivity analysis in evaluation Glass Bottles project  in Anbar province under the condition of risk and uncertainty.

After applying sensitivity analysis we found that the glass bottles project  sensitive to the following factors (cash flow, the cost of investment, and the pro

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Jun 10 2021
Journal Name
Engineering, Technology & Applied Science Research
Corruption Risk Analysis at the Project Planning Stage in the Iraqi Construction Sector using the Bowtie Methodology
...Show More Authors

In this paper, the bowtie method was utilized by a multidisciplinary team in the Federal Board of Supreme Audit (FBSA)for the purpose of managing corruption risks threatening the Iraqi construction sector. Corruption in Iraq is a widespread phenomenon that threatens to degrade society and halt the wheel of economic development, so it must be reduced through appropriate strategies. A total of eleven corruption risks have been identified by the involved parties in corruption and were analyzed by using probability and impact matrix and their priority has been ranked. Bowtie analysis was conducted on four factors with high score risk in causing corruption in the planning stage. The number and effectiveness of the existing proactive meas

... Show More
View Publication
Scopus (6)
Crossref (5)
Scopus Clarivate Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tender phase of

... Show More
Preview PDF
Crossref (3)
Crossref
Publication Date
Fri Jul 01 2022
Journal Name
Journal Of Engineering
Use Risk Score Method to Identify the Qualitative Risk Analysis Criteria in Tendering Phase in Construction Projects
...Show More Authors

The purpose of this article was to identify and assess the importance of risk factors in the tendering phase of construction projects. The construction project cannot succeed without the identification and categorization of these risk elements. In this article, a questionnaire for likelihood and impact was designed and distributed to a panel of specialists to analyze risk factors. The risk matrix was also used to research, explore, and identify the risks that influence the tendering phase of construction projects. The probability and impact values assigned to risk are used to calculate the risk's score. A risk matrix is created by combining probability and impact criteria. To determine the main risk elements for the tend

... Show More
View Publication Preview PDF
Crossref (3)
Crossref