Measurement of construction performance is essential to a clear image of the present situation. This monitoring by the management team is necessary to identify locations where performance is exceptionally excellent or poor and to identify the primary reasons so that the lessons gained may be exported to the firm and its progress strengthened. This research attempts to construct an integrated mathematical model utilizing one of the recent methodologies for dealing with the fuzzy representation of experts’ knowledge and judgment considering hesitancy called spherical fuzzy analytic hierarchy process (SFAHP) method to assess the contractor’s performance per the project performance parameters (cost, schedule, quality, leadership, and change management). At the same time, most project control systems are currently applied through software like Primavera P6 or MS Project. These look at a project’s cost and schedule status by following the earned value analysis for finding the performance. Based on decision makers’ preferences, the analytic hierarchy process (AHP) may be used to arrive at the optimum conclusion. AHP approaches are discussed, including AHP, grey-AHP, fuzzy-AHP, and SFAHP weights comparison. Calculation results showed that the spherical fuzzy approach differs significantly from the other approaches where it considers the decision maker’s hesitation when making linguistic multicriteria decisions and then, as a result, recommends applying periodically for performance measurement. This model can be viewed as a valuable way to help the decision-making stakeholders in the construction sector do the best job about critical issues at a suitable time.
In this paper, the human robotic leg which can be represented mathematically by single input-single output (SISO) nonlinear differential model with one degree of freedom, is analyzed and then a simple hybrid neural fuzzy controller is designed to improve the performance of this human robotic leg model. This controller consists from SISO fuzzy proportional derivative (FPD) controller with nine rules summing with single node neural integral derivative (NID) controller with nonlinear function. The Matlab simulation results for nonlinear robotic leg model with the suggested controller showed that the efficiency of this controller when compared with the results of the leg model that is controlled by PI+2D, PD+NID, and F
... Show MoreSliding Mode Controller (SMC) is a simple method and powerful technique to design a robust controller for nonlinear systems. It is an effective tool with acceptable performance. The major drawback is a classical Sliding Mode controller suffers from the chattering phenomenon which causes undesirable zigzag motion along the sliding surface. To overcome the snag of this classical approach, many methods were proposed and implemented. In this work, a Fuzzy controller was added to classical Sliding Mode controller in order to reduce the impact chattering problem. The new structure is called Sliding Mode Fuzzy controller (SMFC) which will also improve the properties and performance of the classical Sliding Mode control
... Show MoreIn this paper, we introduce the concept of fuzzy n-fold KUideal in KU-algebras, which is a generalization of fuzzy KU-ideal of KUalgebras and we obtain a few properties that is similar to the properties of fuzzy KU-ideal in KU-algebras, see [8]. Furthermore, we construct some algorithms for folding theory applied to KU-ideals in KU-algebras.
The main idea of this paper is to define other types of a fuzzy local function and study the advantages and differences between them in addition to discussing some definitions of finding new fuzzy topologies. Also in this research, a new type of fuzzy closure has been defined, where the relation between the new type and different types of fuzzy local function has been studied
ABSTRUCT
This research aims at examining the expected gap between the fact of planning and controlling process of production at the State Company for Electric Industries and implementation of material requirements planning system in fuzzy environment. Developing solutions to bridge the gap is required to provide specific mechanisms subject to the logic of fuzzy rules that will keep pace with demand for increased accuracy and reduced waiting times depending on demand forecast, investment in inventory to reduce costs to a minimum.
The proposed solutions for overcoming the research problem has required some questions reflecting the problem with its multiple dimensions, which ar
... Show MoreConstruction projects are the organized effort to construct a building or structure. In the fields of civil engineering and architecture, construction projects involve the process that consists of tangibly assembling an infrastructure or building. Important 5 Skills for Project Managers Leadership and Team Management Risk Management Cost Management Task Management Communication
The banking sector is currently facing great challenges resulting from intense competition in the financial environment, and this is what makes the supreme audit bodies and the Central Bank audit as the highest supervisory authority on banks in order to achieve profit and not be exposed to loss, and this requires identifying the banking strengths and risks that constitute points Weakness that affects the future performance and the life of the bank, which requires special supervisory care, and from this point of view, the research aims to use the CAMELS model as a control tool in banks, through the use of its six indicators: capital adequacy, asset quality, management quality, profits, liquidity And sensitivity to market risks, th
... Show MoreOne of the most important challenges facing project management at present time is to ensure project accomplishment in spite of the specific restrictions like the specific time the financial resources specialized to do the project ; which require an accurate consideration for time and cost . the modern village project (residential building aspect) is one of the great project that ministry of agriculture is trying to do Wasit governorate it is chosen as the work in this project is dilatory for that is being studied in term of some modern mathematical and scientific methods like critical path method (CPM)which is one of the project management and scheduling methods to know the time needed to accomplish residential building pro
... Show More