Water produced from power plants is one of the most important sources of water pollution, especially for areas like Baghdad, Contaminated industrial wastewater is a major environmental challenge due to the rapid growth of industries, leading to increased accumulation of harmful pollutants in water resources, the work is intended to study the impact of water generated from a power plant in the south on the level of heavy metals before and after the treatment process and after its discharge to the Tigris River. Objective is to determine the extent of heavy metals such as iron, copper, chromium, and zinc concentration in water extracted from various points and subsequently study the monthly variations of these elements with a view to assessment of water quality and efficiency of the treatment systems. Description: Water samples were collected from pre-treatment, post-treatment, and post-discharge points to the Tigris River. Measurements were carried out on a monthly basis for six months. The preparation of samples was done by filtration and preservation techniques by adding nitric acid. Results are showed that iron concentration reached its peak value of 1.70 mg/L in November 2021, while the minimum value of 0.10 mg/L was recorded in the month of October. Temporal variation: there is variation in metals on a monthly basis; for instance, zinc ranged from 0.40 mg/L during January to 2.70 mg/L during November. Standard comparison: the result was also checked against allowable values given by the World Health Organization and the Environmental Protection Agency to determine the level at which water meets the environmental standards. Heavy metal concentrations varied significantly before and after treatment, indicating unit efficiency. Iron, copper, chromium, and zinc showed reductions, though some exceeded limits, posing environmental risks. Future monitoring and improved treatment are essential to safeguard public health and the Tigris River's ecosystem. © 2025 The authors.
Heuristic approaches are traditionally applied to find the optimal size and optimal location of Flexible AC Transmission Systems (FACTS) devices in power systems. Genetic Algorithm (GA) technique has been applied to solve power engineering optimization problems giving better results than classical methods. This paper shows the application of GA for optimal sizing and allocation of a Static Compensator (STATCOM) in a power system. STATCOM devices used to increase transmission systems capacity and enhance voltage stability by regulate the voltages at its terminal by controlling the amount of reactive power injected into or absorbed from the power system. IEEE 5-bus standard system is used as an example to illustrate the te
... Show MoreBackground: preparation of root canals is an important step in root canal treatment. Mechanical instrumentation of root canals cause an irregular layer of debris, known as the smear layer. As a result, several studies reported that preferring the removal of the smear layer. Objective: To study the influence of the energy (100 mJ) of Erbium, Chromium: Yttrium Scandium Gallium Garnet (Er,Cr:YSGG) laser at short pulse duration (60 μs) on smear layer removal of apical third after using Photon induced photoacoustic streaming technique. Materials and methods: Eighteen straight single-rooted mandibular premolars were used. The roots length were uniform to 14mm from the anatomic apex and
... Show MoreThe simulation of passively Q-switching is four non – linear first order differential equations. The optimization of passively Q-switching simulation was carried out using the constrained Rosenbrock technique. The maximization option in this technique was utilized to the fourth equation as an objective function; the parameters, γa, γc and β as were dealt with as decision variables. A FORTRAN program was written to determine the optimum values of the decision variables through the simulation of the four coupled equations, for ruby laser Q–switched by Dy +2: CaF2.For different Dy +2:CaF2 molecules number, the values of decision variables was predicted using our written program. The relaxation time of Dy +2: CaF2, used with ruby was
... Show MoreA novel demountable shear connector for precast steel-concrete composite bridges is presented. The connector uses high-strength steel bolts, which are fastened to the top flange of the steel beam with the aid of a special locking nut configuration that prevents bolts from slipping within their holes. Moreover, the connector promotes accelerated construction and overcomes the typical construction tolerance issues of precast structures. Most importantly, the connector allows bridge disassembly. Therefore, it can address different bridge deterioration scenarios with minimum disturbance to traffic flow including the following: (1) precast deck panels can be rapidly uplifted and replaced; (2) connectors can be rapidly removed and replaced; and (
... Show More