Construction of a General-Purpose Infrastructure for Rfid – Based Applications
...Show More Authors

View Publication
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (3)
Clarivate Crossref
Publication Date
Sun Jan 01 2023
Journal Name
Journal Of Ovonic Research
Manufacturing Br:CO3O4 /Si Heterojunction For Photodetector Applications
...Show More Authors

This research including, CO3O4 was prepared by the chemical spry pyrolysis, deposited film acceptable to assess film properties and applications as photodetector devise, studying the optical and optoelectronics properties of Cobalt Oxide and effect of different doping ratios with Br (2, 5, 8)%. the optical energy gap for direct transition were evaluated and it decreases as the percentage Br increase, Hall measurements showed that all the films are p-type, the current–voltage characteristic of Br:CO3O4 /Si Heterojunction show change forward current at dark varies with applied voltage, high spectral response, specific detectivity and quantum efficiency of CO3O4 /Si detector with 8% of Br ,was deliberate, extreme value with 673nm.

... Show More
View Publication
Scopus Clarivate Crossref
Publication Date
Tue Jan 01 2019
Journal Name
Aip Conference Proceedings
Highly selective CdS:Ag heterojunction for photodetector applications
...Show More Authors

View Publication
Scopus (39)
Crossref (29)
Scopus Clarivate Crossref
Publication Date
Tue Jan 10 2017
Journal Name
International Journal Of Dynamics And Control
On local approximation-based adaptive control with applications to robotic manipulators and biped robots
...Show More Authors

View Publication
Scopus (10)
Crossref (7)
Scopus Crossref
Publication Date
Thu Oct 01 2020
Journal Name
Journal Of Engineering
Financing Cost Optimization in Construction Sector: A Review
...Show More Authors

The main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Tue Aug 01 2023
Journal Name
Journal Of Engineering
Risk Response in Construction Project: A Review Study
...Show More Authors

Construction projects are characterized as projects with multi phases and activities, complex, unique, and have many different parties and stakeholders. Risks could appear at one or more of the construction project stages and may affect the achievement of project objectives. Therefore, one of the key elements in the planning phase of any project is the risk management process (RMP). This study attempts to understand the terminology of risk in general, risk management, and response to risk in particular. This study is mainly a review of thirty-eight studies that have been published between 1997 and 2020 that demonstrate the importance of the crucial phase of risk response from the risk management process and its impact on

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Mon Apr 05 2021
Journal Name
Solid State Technology
Genetic Algorithms in Construction Project Management: A Review
...Show More Authors

Genetic algorithms (GA) are a helpful instrument for planning and controlling the activities of a project. It is based on the technique of survival of the fittest and natural selection. GA has been used in different sectors of construction and building however that is rarely documented. This research aimed to examine the utilisation of genetic algorithms in construction project management. For this purpose, the research focused on the benefits and challenges of genetic algorithms, and the extent to which genetic algorithms is utilised in construction project management. Results showed that GA provides an ability of generating near optimal solutions which can be adopted to reduce complexity in project management and resolve difficult problem

... Show More
View Publication Preview PDF
Publication Date
Fri Nov 01 2019
Journal Name
Practice Periodical On Structural Design And Construction
Reducing Damages to Underground Infrastructure: Performance Evaluation of One-Call Notification Program
...Show More Authors

View Publication
Scopus (12)
Crossref (9)
Scopus Clarivate Crossref
Publication Date
Fri Mar 31 2023
Journal Name
Journal Of Al-qadisiyah For Computer Science And Mathematics
A Cryptosystem for Database Security Based on RC4 Algorithm
...Show More Authors

Because of vulnerable threats and attacks against database during transmission from sender to receiver, which is one of the most global security concerns of network users, a lightweight cryptosystem using Rivest Cipher 4 (RC4) algorithm is proposed. This cryptosystem maintains data privacy by performing encryption of data in cipher form and transfers it over the network and again performing decryption to original data. Hens, ciphers represent encapsulating system for database tables

View Publication
Crossref (1)
Crossref
Publication Date
Sun Nov 01 2020
Journal Name
Journal Of Engineering
A Signal Amplification-based Transceiver for Visible Light Communication
...Show More Authors

Visible light communication (VLC) is an upcoming wireless technology for next-generation communication for high-speed data transmission. It has the potential for capacity enhancement due to its characteristic large bandwidth. Concerning signal processing and suitable transceiver design for the VLC application, an amplification-based optical transceiver is proposed in this article. The transmitter consists of a driver and laser diode as the light source, while the receiver contains a photodiode and signal amplifying circuit. The design model is proposed for its simplicity in replacing the trans-impedance and transconductance circuits of the conventional modules by a simple amplification circuit and interface converter. Th

... Show More
View Publication Preview PDF
Crossref (3)
Crossref