In petroleum refineries, cooling towers, steam engines, and vacuum distillation all require a large volume of water. Before being dumped into the water bodies, it is then transported to an industrial water treatment facility. One of the study's objectives is to verify how well different processing units in the industrial wastewater treatment plant at the cycle refinery remove concentrations of chemical and biological oxygen demand (COD) and BOD. Five samples of industrial wastewater were collected before and after each treatment unit and one sample of wastewater was drained as a final product to the Tigris River. Over the summer, the BOD5 values after each processing unit were 180.8, 175.2, 111, 43, and 37 ppm. Winter readings were
...