This research is a case study to solve control problems in Al Rasheed edible oil factory fire tube boilers. they have hopes to develop a new control system to manage boilers operation. The suggestion is to use Zelio soft programmable relays instead of the unavailable old control units. Operation philosophy was studied through works of literature, operation manuals, and standards. Programmable logic control relay is proposed as an advanced selection than PLC's. Boilers operation is accompanied by operation risks. many boilers were exploded in Iraq for different reasons. Some problems are attributed to manual operation mistakes. Extensive work was done to understand the operation sequence, emergency shutdown, and faults causing the trips. A computer program is designed and simulated to execute the operation sequence using Zliosoft 2 v5.3 ladder logic programming.
Smart water flooding (low salinity water flooding) was mainly invested in a sandstone reservoir. The main reasons for using low salinity water flooding are; to improve oil recovery and to give a support for the reservoir pressure.
In this study, two core plugs of sandstone were used with different permeability from south of Iraq to explain the effect of water injection with different ions concentration on the oil recovery. Water types that have been used are formation water, seawater, modified low salinity water, and deionized water.
The effects of water salinity, the flow rate of water injected, and the permeability of core plugs have been studied in order to summarize the best conditions of low salinity
... Show MoreIn this paper, we build a fuzzy classification system for classifying the nutritional status of children under 5 years old in Iraq using the Mamdani method based on input variables such as weight and height to determine the nutritional status of the child. Also, Classifying the nutritional status faces a difficult challenge in the medical field due to uncertainty and ambiguity in the variables and attributes that determine the categories of nutritional status for children, which are relied upon in medical diagnosis to determine the types of malnutrition problems and identify the categories or groups suffering from malnutrition to determine the risks faced by each group or category of children. Malnutrition in children is one of the most
... Show MoreThe paper delves into the semantic field to establish sense as an important category within the domain of conceptual or cognitive meaning. Varioussense-relationships that hold between lexical items are linguistically explored. Thesystem of these relationships, asthe paper shows, categoricallyreveals itself in terms of synonymy, antonymy,homonomy, hyponymy, polysemy and colour terms,inthis paper.Despite some overlapping, eachof these items announces its distinctive feature. Thepaper ends with a conclusion that reveals the merits ofalinguistic treatment of these refined semantic aspects.
This paper is devoted to investigate the effect of burning by fire flame on the behavior and load carrying capacity of rectangular reinforced concrete rigid beams. Reduced scale beam models (which are believed to resemble as much as possible field conditions) were suggested. Five end restrained beam specimens were cast and tested. The specimens were subjected to fire flame temperatures ranging from (25-750) ºC at age of 60 days, two temperature levels of 400ºC and 750ºC were chosen with exposure duration of 1.5 hour. The cast rectangular reinforced concretebeam (2250×375×375 mm) (length× width× height respectively) were subjected to fire. Results indicate remarkable reduction in the ultrasonic pulse velocity and rebound number of
... Show MoreRationing is a commonly used solution for shortages of resources and goods that are vital for the citizens of a country. This paper identifies some common approaches and policies used in rationing as well asrisks that associated to suggesta system for rationing fuelwhichcan work efficiently. Subsequently, addressing all possible security risks and their solutions. The system should theoretically be applicable in emergency situations, requiring less than three months to implement at a low cost and minimal changes to infrastructure.