Using the ordinal priority approach for selecting the contractor in construction projects
...Show More Authors
Abstract<p>Effective decision-making process is the basis for successfully solving any engineering problem. Many decisions taken in the construction projects differ in their nature due to the complex nature of the construction projects. One of the most crucial decisions that might result in numerous issues over the course of a construction project is the selection of the contractor. This study aims to use the ordinal priority approach (OPA) for the contractor selection process in the construction industry. The proposed model involves two computer programs; the first of these will be used to evaluate the decision-makers/experts in the construction projects, while the second will be used to formulate the OPA mathematical model. The experts’ interview was used to identify the criteria of evaluation process of the decision-makers/experts, while Delphi survey with principal component analysis (PCA) was conducted to identify the required selection criteria of the construction projects contractors. The results illustrate that there are 20 criteria for selecting the construction contractor, and 7 criteria for evaluating the decision-makers/experts in the construction projects. Finally, the proposed model has been applied in a real construction project, and showed good results.</p>
Scopus Clarivate Crossref
View Publication
Publication Date
Wed Dec 25 2019
Journal Name
Journal Of Engineering
Non-deterministic Approach for Reliability Evaluation of Steel Beam
...Show More Authors

This paper aims to evaluate the reliability analysis for steel beam which represented by the probability of Failure and reliability index. Monte Carlo Simulation Method (MCSM) and First Order Reliability Method (FORM) will be used to achieve this issue. These methods need two samples for each behavior that want to study; the first sample for resistance (carrying capacity R), and second for load effect (Q) which are parameters for a limit state function. Monte Carlo method has been adopted to generate these samples dependent on the randomness and uncertainties in variables. The variables that consider are beam cross-section dimensions, material property, beam length, yield stress, and applied loads. Matlab software has be

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Apr 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Designing and Application of Mathematical Model A Multi – Objectives for Assessment The Quality Of The Project : A Case Study at Saad Public Construction Company
...Show More Authors

Abstract

This research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Nov 03 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Construction of an Initial Assessment Documentation Tool for Nursing Recording System in Coronary Care Units
...Show More Authors

Objective : The study was carried out to construct an initial assessment documentation tool for nursing
recording system in Coronary Care Unit.
Methodology : A descriptive, purposive sample of (65) nurses was selected from CCU of main
teaching hospitals (Al Karama, Al Kindy, Al Kadimia, Al Yarmmok, Baghdad teaching hospital, Ibn
Al Naffis hospital) and Ibn-Al betar hospital in Baghdad city from the 15th of April 2004 to the 15th of
April 2006.
The instrument was constructed and comprised of two sections: section one included the
nurses' demographic characteristic; section two was the initial assessment documentation tool that
contained (2) parts including: General information form and the initial assessment form.

... Show More
View Publication Preview PDF
Publication Date
Thu Dec 01 2022
Journal Name
Environmental Nanotechnology Monitoring & Management
Green approach for the synthesis of graphene glass hybrid as a reactive barrier for remediation of groundwater contaminated with lead and tetracycline
...Show More Authors

Scopus (22)
Crossref (4)
Scopus Crossref
Publication Date
Tue Feb 05 2019
Journal Name
Journal Of The College Of Education For Women
The value of work to the Elits of prophets and its influence on cultural construction
...Show More Authors

Praise be to Allah and peace and blessings be upon our Prophet Muhammad and on his family and companions
Yet,
The prophets (peace be upon them) urged all thevalues and one of these is the value of work which is of a great importance, that all nations have gathered against us as the eaters gather at a bowl. One of the reasons of our weakness and the strength of our enemy is that we have neglected the value of work. And rather a large number of ignorant and uneducatedpeople started to believe that the means of living, triumph, gaining power, and establishing a civilization are given by Allah with neithergainingnoreffort from us. While we find in the past that Allah the Almighty narrated to us the story of Mary (Peace be upon her) and

... Show More
View Publication Preview PDF
Publication Date
Mon Jan 01 2024
Journal Name
Open Engineering
Experimental investigation of the effect of horizontal construction joints on the behavior of deep beams
...Show More Authors
Abstract<p>Construction joints serve as interruption points in the concrete placement process, which is necessary because it is often not feasible to pour concrete continuously in many structures. The quantity of concrete that can be poured at a single instance depends on the batching and mixing capacity, as well as the strength of the formwork. An effective construction joint must ensure sufficient flexural and shear continuity across the junction. Many studies investigated the construction joints in the reinforced concrete (RC) normal beams, but there are no studies investigating the effect of construction joints on the behavior of the RC deep beams. This study was prepared to show the behavio</p> ... Show More
View Publication
Crossref (3)
Crossref
Publication Date
Thu Apr 01 2021
Journal Name
Periodicals Of Engineering And Natural Sciences (pen)
Safety management in private construction project in Iraq
...Show More Authors

View Publication
Scopus (4)
Crossref (1)
Scopus Crossref
Publication Date
Mon Aug 01 2016
Journal Name
Ieee Transactions On Neural Systems And Rehabilitation Engineering
Transradial Amputee Gesture Classification Using an Optimal Number of sEMG Sensors: An Approach Using ICA Clustering
...Show More Authors

View Publication
Scopus (145)
Crossref (145)
Scopus Clarivate Crossref
Publication Date
Tue Mar 01 2022
Journal Name
Process Safety And Environmental Protection
Safety and health management response to COVID-19 in the construction industry: A perspective of fieldworkers
...Show More Authors

View Publication
Scopus (58)
Crossref (54)
Scopus Clarivate Crossref
Publication Date
Thu Feb 28 2019
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Evaluation of the Construction, Build, Operate and Transfer (B.O.T): Applied Research in Southern Cement State Company
...Show More Authors

   Form of investment in infrastructure important factor to drive economic growth in any country, with the dwindling ability of governments to provide the necessary funds for such investments, emerged as a rising trend for private sector involvement in public projects and infrastructure, and one of these trends is the build-operate-transfer system (BOT), which commonly used in various developed and developing countries as one of the tools used in the implementation of these investments, as the private sector under this system design, finance, build and operate the project, and are re-administration of the state after a certain period under a contractual agreement between the parties of the contract. As this system provides majo

... Show More
View Publication Preview PDF
Crossref