Preferred Language
Articles
/
uhdWOI8BVTCNdQwCjWM_
Optimization of IPv6 Protocol Independent Multicast-Sparse Mode Multicast Routing Protocol based on Greedy Rendezvous Point Selection Algorithm
...Show More Authors

Crossref
View Publication
Publication Date
Sun Dec 30 2001
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Regeneration of SLFO_Nitro Acid Mixture in Continuous Mode Operation
...Show More Authors

View Publication Preview PDF
Publication Date
Sat Sep 13 2025
Journal Name
Mesopotamian Journal Of Computer Science
Enhancing Routing Efficiency in VANETs by Leveraging 5G to Mitigate Congestion
...Show More Authors

Transportation networks impact millions of people daily. Their efficiency immediately affects travel time, safety, and environmental sustainability. Unfortunately, various issues hinder the expected performance and efficiency of these networks. Traffic congestion is an up-to-date issue in the urban environment. Fuel consumption is high because travel time has increased, which has a passive environmental impact. Extensive research has been conducted to progress the intelligent transportation systems installed on communication networks and information to treat this congestion. However, there is a significant amount of affront residue in combining real-time data, estimation analytics, and 5G abilities effectively. This paper offers a n

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Mon Apr 01 2024
Journal Name
Academic Science Journal
Comparison between MDDV and VADD routing protocols in VANET (Case Study)
...Show More Authors

Routing is the process of delivering a packet from a source to a destination in the network using a routing algorithm that tries to create an efficient path. The path should be created with minimum overhead and bandwidth consumption. In literature, routing protocols in VANET were categorized in many ways, according to different aspects. In the present study, we prefer the classification based on the number of hops to reach the destination node. In literature, these are single-hop and multi-hops protocols. We first discuss the two types and then compare the MDDV (multi-hops protocol) with VADD (single-hop protocol). The comparison is theoretically and experimentally implemented by providing a network environment consisting of SUMO, VIENS and

... Show More
View Publication
Crossref
Publication Date
Thu Sep 13 2018
Journal Name
Baghdad Science Journal
Dynamic Routing Method over Hybrid SDN for Flying Ad Hoc Networks
...Show More Authors

Due to the high mobility and dynamic topology of the FANET network, maintaining communication links between UAVs is a challenging task. The topology of these networks is more dynamic than traditional mobile networks, which raises challenges for the routing protocol. The existing routing protocols for these networks partly fail to detect network topology changes. Few methods have recently been proposed to overcome this problem due to the rapid changes of network topology. We try to solve this problem by designing a new dynamic routing method for a group of UAVs using Hybrid SDN technology (SDN and a distributed routing protocol) with a highly dynamic topology. Comparison of the proposed method performance and two other algorithms is simula

... Show More
View Publication Preview PDF
Scopus (20)
Crossref (7)
Scopus Clarivate Crossref
Publication Date
Sun Oct 01 2017
Journal Name
Journal Of Engineering
Bit Record Analysis for Bits Evaluating and Selection
...Show More Authors

The bit record is a part from the daily drilling report which is contain information about the type and the number of the bit that is used to drill the well, also contain data about  the used weight on bit  WOB ,revolution per minute RPM , rate of penetration ROP, pump pressure ,footage drilled and bit dull grade. Generally we can say that the bit record is a rich brief about the bit life in the hole. The main purpose of this research is to select the suitable bit to drill the next oil wells because the right bit selection avoid us more than one problems, on the other hand, the wrong bit selection cause more than one problem. Many methods are related to bit selection, this research is familiar with four of thos

... Show More
View Publication Preview PDF
Publication Date
Wed Nov 11 2020
Journal Name
The Abu Dhabi International Petroleum Exhibition & Conference, Abu Dhabi, Uae, November 2020. Paper Number: Spe-203249-ms
Investigating Geomechanical Considerations on Suitable Layer Selection for Hydraulically Fractured Horizontal Wells Placement in Tight Reservoirs
...Show More Authors

The instant global trend towards developing tight reservoir is great; however, development can be very challenging due to stress and geomechanical properties effect in horizontal well placement and hydraulic fracturing design. Many parameters are known to be important to determine the suitable layer for locating horizontal well such as petrophysical and geomechanical properties. In the present study, permeability sensitivity to stress is also considered in the best layer selection for well placement. The permeability sensitivity to the stress of the layers was investigated using measurements of 27 core sample at different confining stress values. 1-D mechanical earth model (MEM) was built and converted to a 3-D full-field geomechanical mode

... Show More
View Publication
Publication Date
Wed Jan 01 2020
Journal Name
Society Of Petroleum Engineering
Investigating geomechanical considerations on suitable layer selection for hydraulically fractured horizontal wells placement in tight reservoirs
...Show More Authors

Scopus (8)
Scopus
Publication Date
Wed Apr 05 2023
Journal Name
Journal Of Engineering
Construction Time-Cost Optimization Modeling Using Ant Colony Optimization
...Show More Authors

In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Sun Nov 17 2019
Journal Name
Journal Of Interdisciplinary Mathematics
Fixed point of set-valued mappings
...Show More Authors

View Publication
Scopus (2)
Crossref (1)
Scopus Clarivate Crossref
Publication Date
Sun May 28 2017
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
On-Line Navigational Problem of a Mobile Robot Using Genetic Algorithm
...Show More Authors