n this paper, we formulate three mathematical models using spline functions, such as linear, quadratic and cubic functions to approximate the mathematical model for incoming water to some dams. We will implement this model on dams of both rivers; dams on the Tigris are Mosul and Amara while dams on the Euphrates are Hadetha and Al-Hindya.
This study aims to assess the water quality index (WQI) according to the Canadian Council of Ministers of the Environment's Water Quality Index method (CCME WQI). Four locations (measurement stations) are selected along the Tigris River, in Iraq. Two of them are located in the north near Mosul City, (Mosul Dam and Mosul city), and the other two are located in the south near Al-Amarah city, (Ali Garbi and Al-Amarah). The water data collected is for the period 2011 to 2013, including eleven water quality parameters. These are magnesium (Mg+2), calcium (Ca2+), potassium (K+), sodium (Na+), sulfate (SO42-), chloride (Cl-), nitrate (NO3<
... Show MoreA simplified theoretical comparison of the hydrogen chloride (HCl) and hydrogen fluoride (HF) chemical lasers is presented by using computer program. The program is able to predict quantitative variations of the laser characteristics as a function of rotational and vibrational quantum number. Lasing is assumed to occur in a Fabry-Perot cavity on vibration-rotation transitions between two vibrational levels of hypothetical diatomic molecule. This study include a comprehensive parametric analysis that indicates that the large rotational constant of HF laser in comparison with HCl laser makes it relatively easy to satisfy the partial inversion criterion. The results of this computer program proved their credibility when compared with th
... Show MoreDue to the deterioration of water quality within the last few years because of the increase of water consumption and the waste water production and disposal into the river The water quality in both surface and ground water resources was negatively affected .The concept of water quality index is used as a tool for water quality classification in Tigris River within Baghdad City .Twenty two parameters of pollution were selected to measure the water quality indices of Tigris river within Baghdad city .Those parameters were measured during (2000-2004)as average monthly values ,three water treatment plants were selected out of the eight water treatment plants that exist along the river.Al Kharkh water treatment plant to reflect the water quality
... Show MoreAbstract
This research deals will the declared production planning operation in the general company of planting oils, which have great role in production operations management who had built mathematical model for correct non-linear programming according to discounting operation during raw materials or half-made materials purchasing operation which concentration of six main products by company but discount included just three products of raw materials, and there were six months taken from the 1st half of 2014 as a planning period has been chosen . Simulated annealing algorithm application on non-linear model which been more difficulty than possible solution when imposed restric
... Show MoreThis study was performed on the Tigris River (Baghdad city section) during the period between December 2016 and December 2018 to assess seasonal variation in water quality using the Overall Index of Pollution (OIP). The OIP is one of the reliable tools for the assessment of surface water quality. To calculate OIP-values, eight parameters were measured ( pH, Dissolved Oxygen "DO", Biological Oxygen Demand "BOD", Total Dissolved Solid "TDS", Total Hardness "TH", calcium "Ca", Sulphate "SO4" and Alkalinity). The results showed the anthropogenic activities impact of Baghdad population that directly discharge of "inadequate treated" waste water to the river. OIP values were acceptable (1˃OIP˃ 1.7) in 2011, 2012, 2013 and 2018. However, in
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show Morewater quality assessment is still being done at specific locations of major concern. The use of Geographical Information System (GIS) based water quality information system and spatial analysis with Inverse Distance Weighted interpolation enabled the mapping of water quality indicators along Tigris river in Salah Al-Din government, Iraq. Water quality indicators were monitored by taking 13 river samples from different locations along the river during Winter season year 2020. Maps of 10 water quality indicators. This meant that the specific water quality indicator and diffuse pollution characteristics in the basin were better illustrated with the variations displayed along the course of the river than conventional line graphs. Creation of
... Show More This study includes Estimating scale parameter, location parameter and reliability function for Extreme Value (EXV) distribution by two methods, namely: -
- Maximum Likelihood Method (MLE).
- Probability Weighted Moments Method (PWM).
Used simulations to generate the required samples to estimate the parameters and reliability function of different sizes(n=10,25,50,100) , and give real values for the parameters are and , replicate the simulation experiments (RP=1000)
... Show More