This study utilizes streamline simulation to model fluid flow in the complex subsurface environment of the Mishrif reservoir in Iraq's Buzurgan oil field. The reservoir faces challenges from high-pressure depletion and a substantial increase in water cut during production, prompting the need for innovative reservoir management. The primary focus is on optimizing water injection procedures to reduce water cuts and enhance overall reservoir performance. Three waterflooding tactics were examined: normal conditions without injectors or producers, normal conditions with 30 injectors and 80 producers and streamline simulation using the frontsim simulator. Three main strategies were employed to streamline water injection in targeted areas. Over a 22-year forecasting period and employing seven Strategies, streamline simulation were optimized both oil and water outputs. The hybrid Strategy-7 as mixed between all three outperformed Strategy-1 that was gave highest optimization result for only one strategy, yielding the highest cumulative oil production of 1281 million stock tank barrels, the highest oil recovery factor of 24.1%, and a minimal of 2.5% water cut. This study underscores the importance of streamline simulation in managing reservoirs under challenging subsurface conditions, highlighting that a thoughtful integration of streamlining tactics can significantly improve reservoir performance even enhancing oil recovery and addressing water-related issues. The findings contribute valuable insights for optimizing waterflooding strategies in similar globally geological contexts.
Multiple drilling problems are being faced continuously while drilling wells in the southern Iraqi oil fields. Many of which are handled poorly and inefficiently which yields longer non-productive time due to the lack of knowledge about the source of these problems. This study aims to investigate the Basra oil fields formations from Faris to Mishrif, diagnose the potential problems, and present the optimum treatment for each problem.
Gathering of field data and previous studies on the subject, in addition to the field experience of drilling supervisors were all the information bases of this study. Southern Iraqi oil fields were studied and analyzed care
Excessive torque and drag can be critical limitation during drilling highly deviated oil wells. Using the modeling is regarded as an invaluable process to assist in well planning and to predict and prevent drilling problems. Identify which problems lead to excessive torque and drag to prevent cost losses and equipment damage. Proper modeling data is highly important for knowing and prediction hole problems may occur due to torque and drag and select the best method to avoid these problems related to well bore and drill string. In this study, Torque and drag well plan program from landmark worldwide programming group (Halliburton Company) used to identify hole problems.one deviated well in Zubair oil fields named, ZB-250 selected for
... Show MoreBauxite residue (red mud) is a waste material from alumina refineries in the Bayer process, containing significant quantities of valuable metals, notably scandium (Sc). The objective of this study is to recover Sc (III) from Hungarian bauxite residue by using hydrometallurgical processes, including solvent extraction and leaching. Red mud directly leached with hydrochloric acid to generate the leachate solution. The significant iron content (~38 %) in red mud makes it hard to recover scandium selectively due to comparable physicochemical characteristics. According to the findings, Fe (III) could be effectively extracted from hydrochloric acid leachate as HFeC14 using diethyl ether before Sc extraction. Protocol B demonstrated superior recov
... Show MoreBauxite residue (red mud) is a waste material from alumina refineries in the Bayer process, containing significant quantities of valuable metals, notably scandium (Sc). The objective of this study is to recover Sc (III) from Hungarian bauxite residue by using hydrometallurgical processes, including solvent extraction and leaching. Red mud directly leached with hydrochloric acid to generate the leachate solution. The significant iron content (~38 %) in red mud makes it hard to recover scandium selectively due to comparable physicochemical characteristics. According to the findings, Fe (III) could be effectively extracted from hydrochloric acid leachate as HFeC14 using diethyl ether before Sc extraction. Protocol B demonstrated superior recov
... Show MoreThere are many problems facing the economic entities as a result of its mass production &variation of its products , the matter which had increased the need & importance of cost accounting which is regarded a main tool for the managerial control.
The actual costing system is unable to meet the contemporary management needs ,so the Standard costing system appear to provide the management with required information to perform its functions by the best use& way.
This research aims to determine the standard cost for the direct material for oil extraction activity by applying it in the north oil company.
Oil pollution of the soil due to a leakage in oil tubes, transportation of products, or during oil excavations can change the soil physical and mechanical, chemical, and biological properties. Consequently, the soil may or may not be eligible for engineering construction projects and it may need a significant treatment. Therefore, it is required to have a better understanding of the general behavior and the corresponding geotechnical properties upon pollution particularly for those areas associated with oil explorations and industry like Thi-Qar Governorate. Fine and coarse soils from two sites at the University of Thi-Qar are artificially contaminated with oil products ranging from 0% to 10% of their dry weight. Testing programs have been
... Show MoreThe faujasite type Y zeolite catalyst was prepared from locally available kaolin. For prepared faujasite type NaY zeolite X-ray, FT-IR, BET pore volume and surface area, and silica/ alumina were determined. The Xray and FT-IR show the compatibility of prepared catalyst with the general structure of standard zeolite Y. BET test shows that the surface area and pore volume of prepared catalyst were 360 m2 /g and 0.39 cm3 /g respectively.
The prepared faujasite type NaY zeolite modified by exchanging sodium ion with ammonium ion using ammonium nitrate and then ammonium ion converted to hydrogen ion. The maximum sodium ion exchange with ammonium ion was 53.6%. The catalytic activity of prepared faujasite type NaY, NaNH4Y and NaHY zeolites
Asmari is the main productive reservoir in Abu Ghirab oilfield in the south-east part of Iraq. It has history production extends from 1976 up to now with several close periods. Recently, the reservoir suffers some problems in production, which are abstracted as water production rising with oil production declining in most wells. The water problem type of the field and wells is identified by using Chan's diagnostic plots (water oil ratio (WOR) and derivative water oil ratio (WOR') against time). The analytical results show that water problem is caused by the channeling due to high permeability zones, high water saturation zones, and faults or fracturing. The numerical approach is also used to study the water movement inside the reser
... Show More