A second-order sliding mode control is used for high-order uncertain plants using equivalent control approach to improve the performance of control systems. They combine backstepping with quasi-continuous controller and twisting controllers. This paper considers a two of the most popular controllers that are used to solve the nonlinearities problem which are the backstepping quasi-continuous control (BQCC) and backstepping twisting controllers to control the angular velocity of a hydraulic motor to improve tracking performance and robustness to uncertainties. For the system dynamics, a linear state feedback with suitable high gain was designed as the virtual controller, where steady state error can be made arbitrarily small according to the gain value. A time varying sliding variable was then selected based on the designed virtual controller. The main benefit of using time varying sliding variable is that the system torque required is initially zero, in addition to the fact that its increasing rate can be put in a suitable range. The system’s stability analysis has been presented using the Lyapunov function in the low level subsystem. The second order control action was used for the high level subsystem and the conventional sliding mode is used for the low level subsystem. The performance and the robustness of the proposed control in forcing the angular velocity to track the reference value (100-2000 RPM) with uncertainty of (+10%) and disturbances of (5-30 N.m) in the system parameters were studied. First, the mathematical model of the system was created. Then, Matlab-based simulation was used to assess the system performance. The results showed that the system exhibits excellent performance and robustness for multi-step input and multiplicative uncertainty. © 2024, Cefin Publishing House. All rights reserved.
In today's world, most business, regardless of size, believe that access to Internet is imperative if they are going to complete effectively. Yet connecting a private computer (or a network) to the Internet can expose critical or confidential data to malicious attack from anywhere in the world since unprotected connections to the Internet (or any network topology) leaves the user computer vulnerable to hacker attacks and other Internet threats. Therefore, to provide high degree of protection to the network and network's user, Firewall need to be used.
Firewall provides a barrier between the user computer and the Internet (i.e. it prevents unauthor
... Show MoreFiber-to-the-Home (FTTH) has long been recognized as a technology that provides future proof bandwidth [1], but has generally been too expensive to implement on a wide scale. However, reductions in the cost of electro-optic components and improvements in the handling of fiber optics now make FTTH a cost effective solution in many situations. The transition to FTTH in the access network is also a benefit for both consumers and service providers because it opens up the near limitless capacity of the core long-haul network to the local user. In this paper individual passive optical components, transceivers, and fibers has been put together to form a complete FTTH network. Then the implementation of the under construction Baghdad/Al
... Show MoreScheduling considered being one of the most fundamental and essential bases of the project management. Several methods are used for project scheduling such as CPM, PERT and GERT. Since too many uncertainties are involved in methods for estimating the duration and cost of activities, these methods lack the capability of modeling practical projects. Although schedules can be developed for construction projects at early stage, there is always a possibility for unexpected material or technical shortages during construction stage. The objective of this research is to build a fuzzy mathematical model including time cost tradeoff and resource constraints analysis to be applied concurrently. The proposed model has been formulated using fuzzy the
... Show MoreConstruction contractors usually undertake multiple construction projects simultaneously. Such a situation involves sharing different types of resources, including monetary, equipment, and manpower, which may become a major challenge in many cases. In this study, the financial aspects of working on multiple projects at a time are addressed and investigated. The study considers dealing with financial shortages by proposing a multi-project scheduling optimization model for profit maximization, while minimizing the total project duration. Optimization genetic algorithm and finance-based scheduling are used to produce feasible schedules that balance the finance of activities at any time w
Ameloblastic fibroma is a rare benign tumor usually affects the first two decades of life. The neoplasm is more predominant in mandibular molar-premolar region and rarely affects the maxilla. In this report, we present a couple of Ameloblastic fibroma cases, affecting boys at their 1st decade. The lesions were presented as swellings of their maxilla, which is atypical location. Radiographic images showed well-defined radiolucency containing areas of radio-opacities and impacted teeth. Differential diagnosis was established as cystic/neoplastic conditions. The lesions were incised and histopathologically diagnosed as Ameloblastic fibroma, since they were composed of immature odontogenic mesenchymal and epithelial cells showing different c
... Show MoreThe investor needs to a clear strategy for the purpose of access to the financial market, that is, has a plan to increase The share of the profits thinking entrepreneur and new, and highlights the importance of this in that it sets for the investor when it goes to the market, and when it comes out of it, and at what price to buy or sell the stock, and what is the the amount of money it starts. Fortunately, he does not need to invent his own investment strategy, because over the years the development of effective methods of buying and selling, and once you understand how to work these methods investor can choose the most appropriate methods and adapted image that fit his style investment .
&nb
... Show MoreIn this research, the problem of ambiguity of the data for the project of establishing the typical reform complex in Basrah Governorate was eliminated. The blurry of the data represented by the time and cost of the activities was eliminated by using the Ranking function and converting them into normal numbers. Scheduling and managing the Project in the Critical Pathway (CPM) method to find the project completion time in normal conditions in the presence of non-traditional relationships between the activities and the existence of the lead and lag periods. The MS Project was used to find the critical path. The results showed that the project completion time (1309.5) dinars and the total cost has reached (33113017769) dinars and the
... Show MoreQuality control is an effective statistical tool in the field of controlling the productivity to monitor and confirm the manufactured products to the standard qualities and the certified criteria for some products and services and its main purpose is to cope with the production and industrial development in the business and competitive market. Quality control charts are used to monitor the qualitative properties of the production procedures in addition to detecting the abnormal deviations in the production procedure. The multivariate Kernel Density Estimator control charts method was used which is one of the nonparametric methods that doesn’t require any assumptions regarding the distribution o
... Show More