Detecting the optimum layer for well placement, which requires a diverse assortment of tools and techniques, represents a significant challenge in petroleum studies due to its critical impact on minimizing drilling costs and time. This study aims to evaluate integrated geological, petrophysical, seismic, and geomechanical data to identify the optimum zones for well placement. Three different reservoirs were analyzed to account for lateral and vertical variations in reservoir properties. The integrated data from these reservoirs provides many tools for reservoir development, especially to detect appropriate well placement zones based on evaluations of reservoir and geomechanical quality. The Mechanical Earth Model (MEM) was constructed using well logging data from 14 wells to estimate reservoir breakdown pressures. The reservoir instability results obtained from the MEM were discussed based on wellbore failure criteria, including breakout, drilling fluid losses, and breakdown pressures. Additionally, seismic data was utilized to offer essential insights for determining optimum well locations by identifying the boundaries between the reservoir beds. The horizontal stress contrast, Young's modulus, Poisson's ratio, and unconfined compressive strength were analyzed to reflect the geomechanical quality of the reservoir. Appropriate layers for placing a horizontal well were considered based on both geological and engineering objectives. This work showed that geomechanical models, along with petrophysical models and seismic data, should be considered for selecting the optimum zone for reservoir development.
The purpose of this article is to introduce reverse engineering procedure (REP). It can achieved by developing an industrial mechanical product that had no design schemes throughout the 3D-Scanners. The aim of getting a geometric CAD model from 3D scanner is to present physical model. Generally, this used in specific applications, like commercial plan and manufacturing tasks. Having a digital data as stereolithography (STL) format. Converting the point cloud be can developed as a work in programming by producing triangles between focuses, a procedure known as triangulation. Then it could be easy to manufacture parts unknown documentation and transferred the information to CNC-machines. In this work, modification was proposed and used in RE
... Show MoreThe objective of the conventional well testing technique is to evaluate well- reservoir interaction through determining the flow capacity and well potential on a short-term basis by relying on the transient pressure response methodology. The well testing analysis is a major input to the reservoir simulation model to validate the near wellbore characteristics and update the variables that are normally function of time such as skin, permeability and productivity multipliers.
Well test analysis models are normally built on analytical approaches with fundamental physical of homogenous media with line source solution. Many developments in the last decade were made to increase the resolution of transient response derivation to meet the
... Show MoreIn petroleum reservoir engineering, history matching refers to the calibration process in which a reservoir simulation model is validated through matching simulation outputs with the measurement of observed data. A traditional history matching technique is performed manually by engineering in which the most uncertain observed parameters are changed until a satisfactory match is obtained between the generated model and historical information. This study focuses on step by step and trial and error history matching of the Mishrif reservoir to constrain the appropriate simulated model. Up to 1 January 2021, Buzurgan Oilfield, which has eighty-five producers and sixteen injectors and has been under production for 45 years when it started
... Show MoreNanofluids, liquid suspensions of nanoparticles (Np), are an effective agent to alter the wettability of oil-wet reservoirs to water-wet thus promoting hydrocarbon recovery. It can also have an application to more efficient carbon storage. We present a series of contact angle (θ) investigations on initially oil-wet calcite surfaces to quantify the performance of hydrophilic silica nanoparticles for wettability alteration. These tests are conducted at typical in-situ high pressure (CO2), temperature and salinity conditions. A high pressure–temperature (P/T) optical cell with a regulated tilted surface was used to measure the advancing and receding contact angles at the desired conditions. The results showed that silica nanofluids can alte
... Show MoreThe business process re-engineering is one of the popular concepts at this time because its provide a radical solution for the problems that companies faces. This method appeared because the changes of competition and costumers 'desires at the two last decades. The markets become wider because of the globalization so the companies must change its way to stay a life.
The research aim is to concentrate on the BPR because it's a philosophy aims to re-organize the company's business process to achieve the competitive advantage, the research also aims to a plicate the BPR using cost management technique in the State Company of Vegetable Oils Industry.
&nb
... Show MoreThe Jeribe Formation, the Jambour oil field, is the major carbonate reservoir from the tertiary reservoirs of the Jambour field in northern Iraq, including faults. Engineers have difficulty organizing carbonate reserves since they are commonly tight and heterogeneous. This research presents a geological model of the Jeribe reservoir based on its facies and reservoir characterization data (Permeability, Porosity, Water Saturation, and Net to Gross). This research studied four wells. The geological model was constructed with the Petrel 2020.3 software. The structural maps were developed using a structural contour map of the top of the Jeribe Formation. A pillar grid model with horizons and layering was designed for each zone. Followin
... Show MoreStrives Total Productive Maintenance to increase the overall effectiveness of the equipment through the early involvement in the design and manufacture of equipment productivity. It also operates in an environment of simultaneous engineering work on the synchronization of activities to take advantage of early information by maintenance engineers, design, operation, and that helps to reduce the faults and facilitate future maintenance tasks.
Has adopted a search in the theoretical concept of the total maintenance productivity and concurrent engineering activities carried out during which the conjunction a
... Show MoreAbstract :
In view of the fact that high blood pressure is one of the serious human diseases that a person can get without having to feel them, which is caused by many reasons therefore it became necessary to do research in this subject and to express these many factors by specific causes through studying it using (factor analysis).
So the researcher got to the five factors that explains only 71% of the total variation in this phenomenon is the subject of the research, where ((overweight)) and ((alcohol in abundance)) and ((smoking)) and ((lack of exercise)) are the reasons that influential the most in the incidence of this disease.