There is a growing need for up-to-date data for rapid decision making in the modern digital age. Recently, the need for high-resolution topographic maps is highly demanding by most mapping clients. With the maturing automatic structure from mobile and multi-view stereoscopy software, small organizations and individuals now have the ability to make their own surveys based on mobile mapping devices. This study looks at how feasible using low-cost Unmanned Aerial Vehicle (UAV) as a mobile mapping device for photogrammetric topographical surveys. It is showing the impact of different UAV flight settings and parameters on the accuracy of mapping products. An automatic scenario for photogrammetric flight mission and its execution are proposed and described. The focus of this research is to generate 3D point clouds from digital imagery using low-cost UAV and showing the relationship between flight mission settings and the quality of the delivered 3D data. Automatic solution is presented and analysed, which automatically generate 3D point clouds from arbitrary image configurations. Results delivered within millimetres based on specific flight setting and optimal quality control considerations. Accuracy assessment and validation process was adopted based on statistical assessments according to ground truth 3D adjusted measurements to assure validity.
This paper presents a minimum delay congestion control in differentiated Service communication networks. The premium and ordinary passage services based fluid flow theory is used to build the suggested structure in high efficient manage. The established system is capable to adeptly manage both the physical network resource limitations and indefinite time delay related to networking system structure.
The goal of this study is to build an application that can be used in difficult cases and sudden circumstances during the pandemic and post-disaster state, which can be the development of digital risk management and mitigating the difficult impact of the epidemic through the improvement of IT and IoT that can be fine by finding initial solutions and make the world like a digital city that could be managed by the network. We provide this study to gain an overview of reasons for delayed and exceeded costs in a select of thirty Iraqi case projects by controlling the time and cost. The drivers of delay have been investigated in multiple countries/contexts. however, there is little country data available under the conditions that have ch
... Show MoreIn this paper the variable structure control theory is utilized to derive a discontinuous controller to the magnetic levitation system. The magnetic levitation system model is considered uncertain, which subjected to the uncertainty in system parameters, also it is open-loop unstable and strongly nonlinear. The proposed variable structure control to magnetic levitation system is proved, and the area of attraction is determined. Additionally, the chattering, which induced due to the discontinuity in control law, is attenuated by using a non-smooth approximate. With this approximation the resulted controller is a continuous variable structure controller with a determined steady state error according to the selected control
... Show MoreCNC machines are widely used in production fields since they produce similar parts in a minimum time, at higher speed and with possibly minimum error. A control system is designed, implemented and tested to control the operation of a laboratory CNC milling machine having three axes that are moved by using a stepper motor attached to each axis. The control system includes two parts, hardware part and software part, the hardware part used a PC (works as controller) connected to the CNC machine through its parallel port by using designed interface circuit. The software part includes the algorithms needed to control the CNC. The sample needs to be machined is drawn by using one of the drawing software like AUTOCAD or 3D MAX and is saved in a we
... Show MoreThere is no doubt that the project control function is very important for administration, so the project Management depends on to monitor and control the project. The project control integrated to the planning which is the base of the administration functions; planning, organizing, directing, and controlling. Without project control cannot be insure to fulfill the plan of the project by the budget and specified time. The project management apply many methods of control to achieve the goals of project which are cost, time, and required specifications. Earned Value Management one of control methods that used in the project by international companies.
Earned Value Method is used in the project o
... Show MoreThe research aimed to diagnose and interpretation of impact nature between Communities of practice dimensions (participation and spreading knowledge, confidence, social capital build) deportation strategic change choices (reengineering business process, business re-structuring, business innovation) in construction companies in the Iraqi Ministry of Construction and Housing, the research tested 4 construction companies working in investing sector in Iraq, the research applied on a sample of 102 persons who participated in Communities of practice distributed in several administrative levels (directors, division directors, project directors and engineers) the research used questionnaire as a main tool for dat
... Show MoreCustomers' creditworthiness standards are the key means employed by private commercial banks in assigning a suitable credit assessment for each customer. Accordingly, it had an instrumental role in indicating the degree of solvency of the potential customer before granting the required credit. The research problem reveals the nature of the relationship between the criteria of customer’s creditworthiness and banking liquidity. The most critical objectives of the study shed light on the role of using creditworthiness criteria as a tool for credit analysis of customers by banks that help reducing credit risks and thus increase banking liquidity. The questionnaire that was distributed to bank employees, the research sample, which w
... Show MoreThe parameters of resistance spot welding (RSW) performed on low strength commercial aluminum sheets are investigated experimentally, the performance requirements and weldability issues were driven the choice of a specific aluminum alloy that was AA1050. RSW aluminum alloys has a major problem of inconsistent quality from weld to weld comparing with welding steel
alloys sheet, due to the higher thermal conductivity, higher thermal expansion, narrow plastic temperature range, and lower electrical resistivity. Much effort has been devoted to the study of describing the relation between the parameters of the process (welding current, welding time, and electrode force) and weld strength. Shear-tensile strength tests were performed to ind
Structural buildings consist of concrete and steel, and these buildings have confronted many challenges from various aggressive environments against the materials manufactured from them. It contains high water levels and buildings whose concrete cover may be damaged and thus lead to the deterioration and corrosion of steel. It was important to have an alternative to steel, such as the glass fiber reinforced polymer (GFRP), which is distinguished by its great effectiveness in resisting corrosion, as well as its strong tensile resistance. Still, one of its drawbacks is that it has a low modulus of elasticity. This research article aims to conduct a numerical study using the nonlinear fi