The aim of this study was to compare the effect of conventional implant site preparation technique and a combination of conventional/piezosurgery preparation on implant stability measured at different time intervals, insertion torque, and preparation time. A randomized controlled study was designed, it included 26 patients who received 54 dental implants randomly assigned to 2 groups; in the control group, implants were installed after conventional preparation with drills whereas the study group received implants after mixed conventional/piezosurgery preparation. The outcome variables included: implant stability measured immediately after implant insertion, at 8 weeks and 16 weeks postoperatively, insertion torque and preparation time. All the investigated variables were analyzed statistically using 1 sample Kolmogrov-Simirenov test, Mann-Whitney U test, paired and unpaired Student t test, the Pearson χ test, Fisher exact test, and analysis of variance (1-way ANOVA). The differences were considered significant at P ≤ 0.05. Implant stability showed a similar pattern in both the groups which consists of a statistically significant decrease in implant stability quotient values at the 8th week followed by a statistically significant increase at the 16th week, where the implant stability quotient values return close to those of primary stability. The 2 groups revealed a statistically not significant difference in insertion torque and implant stability changes throughout the study period, whereas the preparation time was significantly longer in the study group than the control group. The mixed conventional/piezosurgery method of implant site preparation offers no additional advantage over the conventional drilling method in terms of values of insertion torque and patterns of implant stability change throughout the healing period.
One of the important units in Sharq Dijla Water Treatment Plant (WTP) first and second extensions are the alum solution preparation and dosing unit. The existing operation of this unit accomplished manually starting from unloading the powder alum in the preparation basin and ending by controlling the alum dosage addition through the dosing pumps to the flash mix chambers. Because of the modern trend of monitoring and control the automatic operation of WTPs due to the great benefits that could be gain from optimum equipment operation, reducing the operating costs and human errors. This study deals with how to transform the conventional operation to an automatic monitoring and controlling system depending on a Programmable
... Show MoreThis study aimed to formulate carboxymethyl cellulose (CMC)–eggshell powder (ESP) composite coatings ( , , and ) and evaluate their efficacy in extending table egg shelf life and preserving quality parameters compared to an uncoated control ( ). Egg weight parameters, interior egg quality, component proportions, and bacterial counts of shell eggs stored under refrigeration for up to 8 weeks. Coating treatments significantly increased total egg weight and shell thickness at (P<0.05), with and recording the highest initial values. Although weight loss and weight loss percentage were non-significant during week 1, significant weight loss emerged by week 2 and scaled proportionally through weeks 4 and 8. The uncoated control (
... Show MoreTeaching through the system of personal learning, known as (Clare's plan) is amongst the most prominent plans which depend on self-education, as it received worldwide recognition. The plan lets the learner achieve learning by depending on himself after being familiar with the educational goals given to him, then he starts to solve the exercises and the drills accompanying the unit. After that, he checks his achievement by answering the self-evaluation tests. This method offers more opportunities for personal interaction than do the traditional systems, and individual leaning is a methodical expression aims at taking care of the learner and making him the locus of the processes of teaching and learning.
Aims of the study
... Show More