Gas lift is one of the oldest methods used to produce hydrocarbon fluids from wells experiencing declining production. It works by aerating the mixture inside production tubing and forcing it to the surface. One of the reasons for declining production in oil wells is an increase in water cut or a drop in reservoir pressure, which requires one of the artificial lift methods to restore production. (A) oil field suffers from an increase in water cut, which has affected well productivity. The wells under study have a water cut of up to 66%, resulting in very low production rates. In this research, Pipesim software was used to build a physical and fluid model, then design an optimal gas lift system that achieves the highest possible productivity from these wells. The design of the gas lift system depends directly on injection pressure, injection rate, and wellhead pressure, which in turn affect the remaining design variables. The availability of gas in the field is a prerequisite for the system's success, while injection pressure can be provided by suitable compressors. For this reason, optimal injection rates were taken into consideration to avoid excessive gas. The results showed a significant increase in production for the wells under study, with increases percentage as 238% (from 793 to 2,682 stb/d) and 146% (from 1,100 to 2,706 stb/d). The gas lift system works to lift fluids accumulated in the well, and this does not mean it is a method for treating water cut, as water cut comes into the well from the producing formation. In other words, this increase applies to the fluids as a whole, not just oil production. A prospective study was conducted to simulate the effectiveness of the gas lift system in dealing with changes in well operating conditions, such as increased water cut or decreased reservoir pressure. The results demonstrated the flexibility and success of the gas lift system in dealing with problems and challenges that occur during production, as the simulation procedure was based on an increase in water cut of up to 90 % and a decrease in the reservoir pressure reaching 3200 psi. Despite this, the wells continued to produce at rates of 1549 and 1593 stb/d. Furthermore, this study can be applied to other wells in the field where water cut is high, demonstrating the importance of gas lift in maintaining production and its feasibility in the field.
The fluctuation and expansion ratios have been studied for cylindrical gas-solid fluidized columns by using air as fluidizing medium and Paracetamol as the bed material. The variables were the column diameter (0.0762, 0.15, and 0.18 m), static bed height (0.05, 0.07, and 0.09 m), and air velocity to several times of minimum fluidization velocity. The results showed that both the fluctuation and expansion ratios had a direct relation with air velocity and an inverse one with column diameter and static bed height. A good agreement was between the experimental results and the calculated values by using the correlation equations from the literature.
Background: Debonding and fracture of artificial teeth from denture bases are common clinical problem, bonding of artificial teeth to heat cure acrylic and high impact heat cure acrylic denture base materials with autoclave processing method is not well known. The aim of this study was to evaluate the effect of autoclave processing method on shear bond of artificial teeth to heat cure denture base material and high impact heat cure denture base material. Materials and methods: Heat polymerized (Vertex) and high impact acrylic (Vertex) acrylic resins were used. Teeth were processed to each of the denture base materials after the application of different surface treatments. The sample (which consist of artificial tooth attached to the dentur
... Show MoreThis work deals with thermal cracking of heavy vacuum gas oil which produced from the top of vacuum distillation unit at Al- DURA refinery, by continuous process. An experimental laboratory plant scale was constructed in laboratories of chemical engineering department, Al-Nahrain University and Baghdad University. The thermal cracking process was carried out at temperature ranges between 460-560oC and atmospheric pressure with liquid hourly space velocity (LHSV) equal to 15hr-1.The liquid product from thermal cracking unit was distilled by atmospheric distillation device according to ASTM D-86 in order to achieve two fractions, below 220oC as a gasoline fraction and above 220oC as light cycle o
... Show MoreAbstract
The labeled research deal with (Entrepreneurship Organizations In the framework of strategic leadership practices: Field research in the Ministry of Oil), Search over the possibility of the influence of the practices of strategic leadership Which include
(Determine the strategic direction, The discovery of the fundamental estimators and maintain it, The development of the human capital, and Maintaining of an organizational culture influential, and Find a balanced regulatory Control) In a Entrepreneurship in its dimensions and its (innovation, risk, pre-emptive and independence) On group of heads of departments and authorities
... Show MoreGeographic information system (GIS) is utilized in a variety of tasks such as, resource management, urban planning, emergency planning in case of accident, and rapid response etc. The aim of this study is to produce a digital map with the aid of GIS and a survey data. A survey data is conducted with Total Station technique on sanitary planning positions. The campus of Baghdad University is chosen to test the execution and accuracy of the results for sewer manholes locations. During the field survey, Total Station (Nikon Nivo) is used to identify the 3-D coordinates for each location. Finally, Geographical Information System (GIS) are utilized to present the digital map of the network sewer pipe line to the end users. Although Geographic Inf
... Show More
The purpose of this research is to improve the organizational performance of the Oil Projects Company by adopting an approach to strategic change، and finding appropriate solutions to the problems facing the company. The researcher adopted in designing his research by conducting a survey of previous literature that dealt with approaches to strategic change، as the results of the survey showed that most researchers agree on the approach of renewal and modernization، Which formed a starting point for the researcher to identify the extent of the company's management interest in renewal and modernization to improve its level of performance، and the quality of the procedures followed on the ground that is related to
... Show MoreConstruction projects need methods and techniques to ensure the level of quality and commensurate with the level required and documented in the project contract. The quality of the project is affected by the quality of the inputs and accompanying procedures in the construction of the project.
Al-Rumaitha residential project found that the quality of the concrete for the ceilings in the research sample (the roof of the third floor of buildings A25 and A26) and (roof of the second floor of buildings A27, A28, A29, A30, A31, A32 and A33) and roof of buildings A15 and A16 A19)) is not the required quality level.
The idea of the research came after the need to improve the performance o
... Show More