Gas lift is one of the oldest methods used to produce hydrocarbon fluids from wells experiencing declining production. It works by aerating the mixture inside production tubing and forcing it to the surface. One of the reasons for declining production in oil wells is an increase in water cut or a drop in reservoir pressure, which requires one of the artificial lift methods to restore production. (A) oil field suffers from an increase in water cut, which has affected well productivity. The wells under study have a water cut of up to 66%, resulting in very low production rates. In this research, Pipesim software was used to build a physical and fluid model, then design an optimal gas lift system that achieves the highest possible productivity from these wells. The design of the gas lift system depends directly on injection pressure, injection rate, and wellhead pressure, which in turn affect the remaining design variables. The availability of gas in the field is a prerequisite for the system's success, while injection pressure can be provided by suitable compressors. For this reason, optimal injection rates were taken into consideration to avoid excessive gas. The results showed a significant increase in production for the wells under study, with increases percentage as 238% (from 793 to 2,682 stb/d) and 146% (from 1,100 to 2,706 stb/d). The gas lift system works to lift fluids accumulated in the well, and this does not mean it is a method for treating water cut, as water cut comes into the well from the producing formation. In other words, this increase applies to the fluids as a whole, not just oil production. A prospective study was conducted to simulate the effectiveness of the gas lift system in dealing with changes in well operating conditions, such as increased water cut or decreased reservoir pressure. The results demonstrated the flexibility and success of the gas lift system in dealing with problems and challenges that occur during production, as the simulation procedure was based on an increase in water cut of up to 90 % and a decrease in the reservoir pressure reaching 3200 psi. Despite this, the wells continued to produce at rates of 1549 and 1593 stb/d. Furthermore, this study can be applied to other wells in the field where water cut is high, demonstrating the importance of gas lift in maintaining production and its feasibility in the field.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Sep 30 2017
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Enhancing the Lifting Capacity of Drilling Fluids in Vertical Oil Wells
...Show More Authors

Of the many functions that are performed by the drilling fluid, the most important is to transport cuttings from the bit up the annulus to the surface. Various drilling fluid have been widely used in the oil industry to improve lifting capacity. In this study, three mud type have been used which they are, oil base mud, X-anthan polymer and a mixture of CMC and bentonite ,by using Carrying Capacity Index  calculation (CCI) , the Xanthan  gave good values of CCI than other studied drilling fluid. By using Sifferman chart and field data from well in south of Iraq and API equation to find cutting concentration in the annulus, The results showed that the used of thick mud increase the lifting capacity and decrease volumetric drill c

... Show More
View Publication Preview PDF
Publication Date
Sat Oct 01 2011
Journal Name
Journal Of Engineering
DIESEL PARTICULATE EMISSIONS EVALUATION FOR SINGLE CYLINDER ENGINE FUELLED WITH ETHANOL AND GAS-OIL SOLUTIONS
...Show More Authors

Particulate matter (PM) emitted from diesel engine exhaust have been measured in terms of mass, using
99.98 % pure ethanol blended directly, without additives, with conventional diesel fuel (gas – oil),to
get 10 % , 15 %, 20 % ethanol emulsions . The resulting PM collected has been compared with those
from straight diesel. The engine used is a stationary single cylinder, variable compression ratio Ricardo
E6/US. This engine is fully instrumented and could run as a compression or spark ignition.
Observations showed that particulate matter (PM) emissions decrease with increasing oxygenate
content in the fuel, with some increase of fuel consumption, which is due to the lower heating value of
ethanol. The reduction in

... Show More
View Publication Preview PDF
Crossref
Publication Date
Wed Feb 01 2012
Journal Name
Ibn Al-haytham Journal For Pure And Applied Science
Using Restricted Least Squares Method to Estimate and Analyze the Cobb-Douglas Production Function with Applicatio
...Show More Authors

Publication Date
Sat Mar 31 2018
Journal Name
Journal Of Engineering
Potential of Microalgae Cultivation in Dairy Wastewater as a Step in Low-Cost Biofuel Production
...Show More Authors

The present study addresses adopting the organic and nutritious materials in dairy wastewater as media for cultivation of microalgae, which represent an important source of renewable energy. This study was carried out through cultivation of three types of microalgae; Chlorella sp., Synechococcus, and Anabaena. The results shows the success the cultivation of the Synechococcus and  Chlorella Sp, while the Anabaena microalgae were in low-growth level. The highest growth was in the Synechococcus farm, followed by Chlorella and Anabaena. However, the growth of Synechococcus required 10 days to achieve this increase that re

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Geological Considerations Related to Casing setting depth selection and design of Iraqi oil wells (case study)
...Show More Authors

Well integrity is a vital feature that should be upheld into the lifespan of the well, and one constituent of which casing, necessity to be capable to endure all the interior and outside loads. The casing, through its two basic essentials: casing design and casing depth adjustment, are fundamental to a unique wellbore that plays an important role in well integrity. Casing set depths are determined based on fracturing pressure and pore pressure in the well and can usually be obtained from well-specific information. Based on the analyzes using the improved techniques in this study, the following special proposition can be projected: The selection of the first class and materials must be done correctly and accurately in accordance with the

... Show More
View Publication Preview PDF
Crossref (2)
Crossref
Publication Date
Wed Jun 29 2022
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Geological Considerations Related to Casing setting depth selection and design of Iraqi oil wells (case study)
...Show More Authors

Well integrity is a vital feature that should be upheld into the lifespan of the well, and one constituent of which casing, necessity to be capable to endure all the interior and outside loads. The casing, through its two basic essentials: casing design and casing depth adjustment, are fundamental to a unique wellbore that plays an important role in well integrity. Casing set depths are determined based on fracturing pressure and pore pressure in the well and can usually be obtained from well-specific information. Based on the analyzes using the improved techniques in this study, the following special proposition can be projected: The selection of the first class and materials must be done correctly and accurately in accordance with

... Show More
View Publication
Crossref (2)
Crossref
Publication Date
Sat Jan 01 2022
Journal Name
Materials Today: Proceedings
Studying the impact of condensate blockage on gas production: A review
...Show More Authors

When the drawdown pressure amounts to a value below the dew point pressure, a minor droplet of condensate is shaped and accumulated in the close area of wellbore. As the accumulation happens, the saturation of the liquid will grow and a reduction in gas relative permeability will happen, therefore it will affect the productivity. Generally, condensate baking problem in gas wells is being deliberated and studied and numerous techniques have been suggested to solve the problem. The studying of condensate banking dynamics is essential to evaluate the productivity and behavior of the wells of the gas fields.

Preview PDF
Scopus (5)
Crossref (3)
Scopus Clarivate Crossref
Publication Date
Fri Oct 07 2022
Journal Name
Texas Journal Of Engineering And Technology
Estimation of Pore Pressure and In-Situ Stresses for Halfaya Oil Field: A Case Study
...Show More Authors

Preview PDF
Publication Date
Sun Dec 30 2012
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Hydrodynamic Pressure Gradient Correlation of Some Iraqi Oil Wells
...Show More Authors

Empirical equation has been presented to predict the optimum hydrodynamic
pressure gradient with optimum mud flow rate (one equation) of five Iraqi oil wells
to obtain the optimum carrying capacity of the drilling fluid ( optimum transport
cuttings from the hole to the surface through the annulus).
This equation is a function of mud flow rate, mud density and penetration
rate without using any charts or graphs.
The correlation coefficient accuracy is more than 0.9999.

View Publication Preview PDF
Publication Date
Sun Sep 11 2022
Journal Name
Journal Of Petroleum Research And Studies
Non-Productive Time Reduction during Oil Wells Drilling Operations
...Show More Authors

Often there is no well drilling without problems. The solution lies in managing and evaluating these problems and developing strategies to manage and scale them. Non-productive time (NPT) is one of the main causes of delayed drilling operations. Many events or possibilities can lead to a halt in drilling operations or a marginal decrease in the advancement of drilling, this is called (NPT). Reducing NPT has an important impact on the total expenditure, time and cost are considered one of the most important success factors in the oil industry. In other words, steps must be taken to investigate and eliminate loss of time, that is, unproductive time in the drilling rig in order to save time and cost and reduce wasted time. The data of