Permeability estimation is a vital step in reservoir engineering due to its effect on reservoir's characterization, planning for perforations, and economic efficiency of the reservoirs. The core and well-logging data are the main sources of permeability measuring and calculating respectively. There are multiple methods to predict permeability such as classic, empirical, and geostatistical methods. In this research, two statistical approaches have been applied and compared for permeability prediction: Multiple Linear Regression and Random Forest, given the (M) reservoir interval in the (BH) Oil Field in the northern part of Iraq. The dataset was separated into two subsets: Training and Testing in order to cross-validate the accuracy and the performance of the algorithms. The random forest algorithm was the most accurate method leading to lowest Root Mean Square Prediction Error (RMSPE) and highest Adjusted R-Square than multiple linear regression algorithm for both training and testing subset respectively. Thus, random Forest algorithm is more trustable in permeability prediction in non-cored intervals and its distribution in the geological model.
Background: Lung cancer is responsible for the most
cancer deaths in both men and women throughout the
world. Deaths from lung cancer (160,440 in 2004,
according to the National Cancer Institute) exceed the
number of deaths from four other major cancers combined
(breast, colon, pancreatic and prostate).
Objective: To assess the behavior and the approaches of
lung cancer in a sample of Iraqi patients.
Methods: This descriptive retrospective study was
performed using the records of 390 patients proved to have
lung cancer that had attending the Thoracic Surgery
Department of Surgical Specialties Hospital-Medical City
\Baghdad for the period from January, 1st
, 2001 to
December, 31st
,2002.
Res
The management of construction projects needs to complete the basics of system management and work. Starting from the idea and how to turn it into a full study and ended at the construction project completion arriving at the purpose prepared for it, so the projects need to control on its operation and integration system in order to succeed.
It is no secret for who concerned in construction projects field that the design stage is a very important stage in construction project because it determines the final features of the project through the requirements provided by the employer for the consultant to formulate it during this phase in the form of plans, drawings, and specifications, then translated on the ground as the shape of co
... Show MoreBackground: Staphylococcus spp. are widely distributed in nature and can cause nosocomial, skin infections, and foodborne illness, and it may lead to severe financial losses in birds by causing systemic infection in numerous organs. Aim: This study was conducted to determine the prevalence of Staphylococcus spp. in humans and birds in Baghdad city. Methods: Seventy-six oral cavity swabs were collected, including 41 from birds and 35 from breeders. All samples were examined by bacteriological methods and identified by using the VITEK technique, the samples were then further studied to test the ability of biofilm formation, and MDR factors and MAR index were tested with the use of seven antibiotics. Results: Among the 76 oral swa
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pressur
... Show MorePrediction of the formation of pore and fracture pressure before constructing a drilling wells program are a crucial since it helps to prevent several drilling operations issues including lost circulation, kick, pipe sticking, blowout, and other issues. IP (Interactive Petrophysics) software is used to calculate and measure pore and fracture pressure. Eaton method, Matthews and Kelly, Modified Eaton, and Barker and Wood equations are used to calculate fracture pressure, whereas only Eaton method is used to measure pore pressure. These approaches are based on log data obtained from six wells, three from the north dome; BUCN-52, BUCN-51, BUCN-43 and the other from the south dome; BUCS-49, BUCS-48, BUCS-47. Along with the overburden pr
... Show More
