The present study investigates the effect of the de-sanding (recycling system) on the bearing capacity of the bored piles. Full-scale models were conducted on two groups of piles, the first group was implemented without using this system, and the second group was implemented using the recycling system. All piles were tested by static load test, considering the time factor for which the piles were implemented. The test results indicated a significant and clear difference in the bearing capacity of the piles when using this system. The use of the recycling system led to a significant increase in the bearing capacity of the piles by 50% or more. Thus it was possible to reduce the pile length by (15 % or more) thus, and implementation costs were significantly reduced. Furthermore, casting time for the pile group in which the system is used is less than for the pile group that did not use it (approximately half an hour per pile), and the amount of concrete was greater by an average of 2 cubic meters for each pile.
The harmonic oscillator (HO) and Gaussian (GS) wave functions within the binary cluster model (BCM) have been employ to investigate the ground state neutron, proton and matter densities as well as the elastic form factors of two- neutron 6He and 16C halo nuclei. The long tail is a property that is clearly revealed in the density of the neutrons since it is found in halo orbits. The existence of a long tail in the neutron density distributions of 6He and 16C indicating that these nuclei have a neutron halo structure. Moreover, the matter rms radii and the reaction cross section (𝜎𝑅 ) of these nuclei have been calculated using the Glauber model.
The aim of the research is to prepare practical volleyball lessons by using the four pillars strategy for middle school students, and to identify the effect of the four pillars strategy in performing the transmission and volleyball skills in the second intermediate students, to assume that the two researchers assume that there are no statistically significant differences between the results of my skill performance tests Sending and preparing tribal and remote volleyball for the experimental and controlled groups, and there are no statistically significant differences between the results of the performance of the transmission and preparation skills of the volleyball between the two experimental and control groups, and the research co
... Show MoreThe present study aimed to identify the therapeutic evaluation of chitosan extracted from the fungus cushroom and pure chitosan on glucose and lipid profile in the blood of 35 male rabbits with hyperlipidemia induced experimentally by cholesterol. The tests included estimation of glucose levels, total cholesterol, triglycerides, high-density lipoproteins, low-density lipoproteins, and very low-density lipoproteins. hyperlipidemia was induced in the male rabbits used in the study which was administered orally with cholesterol 150mg/kg body weight for a week. rabbits were divided into seven groups: control, cholesterol, pure chitosan, mushroom chitosan, cholesterol and pure chitosan, cholesterol and mushroom chitosan and cholestero
... Show MoreNoor Oil Field is one of Iraqi oil fields located in Missan province / Amarah city. This field is not subjected to licensing rounds, but depends on the national effort of Missan Oil Company. The first two wells in the field were drilled in seventies and were not opened to production until 2009. The aim of this study is to study the possibility of using the method of gas lift to increase the productivity of this field . PROSPER software was used to design the continuous gas lift by using maximum production rate in the design.
The design was made after comparing the measured pressure with the calculated pressure, this comparison show that the method of Beggs-Brill and Petroleum Exper
... Show MoreThe research aims to clarify the COBIT5 framework for IT governance and to develop of a criterion based on Balanced Scorecard that contributes in measuring the performance of IT governance. To achieve these goals, the researchers adopted the deductive approach in the design of balanced scorecard to measure the IT governance at the Bank of Baghdad that was chosen because it relied heavily on IT.
The research has reached a number of conclusions, the most important of which is that the performance of IT department in the Bank of Baghdad falls within the good level that requires constant monitoring, the most committed items of Balanced Scorecard by the Bank were customer, internal operation, growth and finally the financial item; IT
... Show MoreIn the present work, we use the Adomian Decomposition method to find the approximate solution for some cases of the Newell whitehead segel nonlinear differential equation which was solved previously with exact solution by the Homotopy perturbation and the Iteration methods, then we compared the results.
Economic performance is one of the most important indicators of economic activity and with the performance of the economy progress varied sources of output and increase economic growth rates and per capita national income, and to recover the business environment and increase investment rates and rising effectiveness of the financial and monetary institutions and credit market. Which leads to increased employment rates and reducing unemployment rates and the elimination of many of the social problems and improve the average per capita income as well as improve the level of national income.
The input / output tables is a technique mathematical indicates economic performance
... Show MoreThe goal (purpose) from using development technology that require mathematical procedure related with high Quality & sufficiency of solving complex problem called Dynamic Programming with in recursive method (forward & backward) through finding series of associated decisions for reliability function of Pareto distribution estimator by using two approach Maximum likelihood & moment .to conclude optimal policy
In this research, the Iraqi flagpole at Baghdad University, which is the longest in Baghdad, with a height of 75m, was monitored. According to the importance of this structure, the calculation of the displacement (vertical deviation) in the structure was monitored using the Total Station device, where several observations were taken at different times for two years the monitoring started from November 2016 until May 2017, at a rate of four observations for one year. The observation was processed using the least square method, and the fitting of circles, and then the data was processed. The deviation was calculated using the Matlab program to calculate the values of corrections, where