Wellbore instability problems cause nonproductive time, especially during drilling operations in the shale formations. These problems include stuck pipe, caving, lost circulation, and the tight hole, requiring more time to treat and therefore additional costs. The extensive hole collapse problem is considered one of the main challenges experienced when drilling in the Zubair shale formation. In turn, it is caused by nonproductive time and increasing well drilling expenditure. In this study, geomechanical modeling was used to determine a suitable mud weight window to overpass these problems and improve drilling performance for well development. Three failure criteria, including Mohr–Coulomb, modified Lade, and Mogi–Coulomb, were used to predict a safe mud weight window. The geomechanical model was constructed using offset well log data, including formation micro-imager (FMI) logs, acoustic compressional wave, shear wave, gamma ray, bulk density, sonic porosity, and drilling events. The model was calibrated using image data interpretation, modular formation dynamics tester (MDT), leak-off test (LOT), and formation integrity test (FIT). Furthermore, a comparison between the predicted wellbore instability and the actual wellbore failure was performed to examine the model's accuracy. The results showed that the Mogi–Coulomb failure and modified Lade criterion were the most suitable for the Zubair formation. These criteria were given a good match with field observations. In contrast, the Mohr–Coulomb criterion was improper because it does not match shear failure from the caliper log. In addition, the obtained results showed that the inappropriate mud weight (10.6 ppg) was the main cause behind wellbore instability problems in this formation. The optimum mud weight window should apply in Zubair shale formation ranges from 11.5 to 14 ppg. Moreover, the inclination angle should be less than 25 degrees, and azimuth ranges from 115 to 120 degrees northwest-southeast (NE–SW) can be presented a less risk. The well azimuth of NE–SW direction, parallel to minimum horizontal stress (Shmin), will provide the best stability for drilling the Zubair shale formation. This study's findings can help understand the root causes of wellbore instability in the Zubair shale formation. Thus, the results of this research can be applied as expenditure effectiveness tools when designing for future neighboring directional wells to get high drilling performance by reducing the nonproductive time and well expenses.
W Tarik A, AW Ali T, Journal of the Faculty of Medicine, 2015 - Cited by 2
A 2D geological model for Mauddud Formation in the Badra oil field is built using Rockworks 16 software. Mauddud Formation produces oil from limestone units; it represents the main reservoir in the Badra oil field. Six wells (BD-1, BD-2, BD-4, BD-5, P-15, and P-19) are selected to build facies and petrophysical (Porosity and Water saturation) models. Wells data are taken from the core and cutting samples and studied through the microscopic. The petrophysical data (effective porosity and water saturation) are derived from computer processes interpretation results that are calculated by using Interactive Petrophysics software. The 2D models are built to illustrate the vertical and horizontal distribution of petrophysical properties between we
... Show MoreThis study aims to identify the role of forensic accounting in the Iraqi environment, banking stability, and to achieve this goal, we used the field survey method, as it is the most appropriate for studying the phenomenon in question and achieving its objectives.
Where we selected a sample consisting of (50) male and female employees, distributed among five private banks in Baghdad governorate, namely (Ashur International Bank, Development Investment Bank, Iraqi Middle East Investment Bank, Hammurabi Commercial Bank, Khaleej Commercial Bank), and the questionnaire tool was applied to them Designed for this purpose, which consisted of
... Show MoreExtreme conditions will cause the water level of high fill canal segment to change suddenly, which will affect the velocity and pore pressure of the slope. A 9 km irrigation earth canal in the city of Alsyahy, 15 km away from Al-Hilla city, and branching off from the left side of Shatt Al-Hilla at 57 km, was studied. The aim of this work is to study and analyze the effect of rationing system on the Birmana earthen canal during rapid drawdown case. Finite element modeling with Geo-Studio software was used in the present study to analyze the combined seepage and slope stability for three cycles. The resulting minimum safety factor obtained from the analysis using the saturated and
Characterization of the heterogonous reservoir is complex representation and evaluation of petrophysical properties and application of the relationships between porosity-permeability within the framework of hydraulic flow units is used to estimate permeability in un-cored wells. Techniques of flow unit or hydraulic flow unit (HFU) divided the reservoir into zones laterally and vertically which can be managed and control fluid flow within flow unit and considerably is entirely different with other flow units through reservoir. Each flow unit can be distinguished by applying the relationships of flow zone indicator (FZI) method. Supporting the relationship between porosity and permeability by using flow zone indictor is ca
... Show MoreThe road networks is considered to be one of the determinants that controls to specify the areas of human activities, which it depend on to specify the arrival cost , in addition it is useful to achieve the connectivity for interaction and human activities , and shorten the distance and time between the population and places of service. The density of the road network in any space directly affected by the density of population and the type of economic activities and administrative functions performed by the space. On this basis, the subject of this study is reflected in the quantitative analysis of the roads network in the Governorate of Karbala. The study consists the quantitative analysis for the roads network and the Urban Nodes in th
... Show MoreDelays occur commonly in construction projects. Assessing the impact of delay is sometimes a contentious
issue. Several delay analysis methods are available but no one method can be universally used over another in
all situations. The selection of the proper analysis method depends upon a variety of factors including
information available, time of analysis, capabilities of the methodology, and time, funds and effort allocated to the analysis. This paper presents computerized schedule analysis programmed that use daily windows analysis method as it recognized one of the most credible methods, and it is one of the few techniques much more likely to be accepted by courts than any other method. A simple case study has been implement