Preferred Language
Articles
/
jperc-1038
Down syndrome construction
...Show More Authors

Due to the increasing number of people with in Iraq, it has become necessary to treat seriously this problem, which was not considered significantly to the best of researcher knowledge. Thus, the current research aims to construct a scale to measure the physical down syndromes, which distinguish them from others. It consisted of (39) items. The researcher has presented some related literature that addressed the current problem

View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Sep 27 2022
Journal Name
Al–bahith Al–a'alami
POLITICAL DEBATES AND THEIR ARTISTIC CONSTRUCTION IN IRAQI SATELLITE CHANNELS ( AN ANALYTICAL STUDY ) : (A research drawn from a Master Thesis)
...Show More Authors

The problem of research on the study of political debate programs in the Iraqi satellite channels, in the "People decide" program by Afaq channel and " electoral competition " by Fallujah channel), and its importance for the community and researchers in the scientific field, as new programs to enter the Iraqi media after we have been the world media a lot in this area at the academic and practical levels (The field), and seeks to find out what the technical construction of the programs of political debates in Iraqi satellite channels and methods of construction and methods of employment used by the technical elements in the presentation of the programs and The study adopted the surve

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
E3s Web Of Conferences
Comparing the Design Alternatives Using Building Information Model (BIM) and Constructability in Iraqi Construction Projects
...Show More Authors

The Iraqi construction industry suffers from many issues that lead to many design errors, clashes, delays and cost overruns. Therefore, applying constructability will prevent these issues from happening, as it has proven its positive effect in different projects around the world. The goal of this paper is to use building information modelling (BIM) to assess the constructability, provide the opportunities for the project stakeholders to choose the best constructable design alternative and find the affection of applying constructability on project cost. The practical side of this research consists of two parts: in the first part, 37 factors are collected from the literature review as factors that effect on constructability. After tha

... Show More
View Publication
Scopus Crossref
Publication Date
Sat Jun 27 2020
Journal Name
Asian Journal Of Civil Engineering
Using measured mile method to quantify the loss of labor productivity in Iraqi construction site
...Show More Authors

View Publication
Scopus (5)
Crossref (5)
Scopus Crossref
Publication Date
Sat Nov 03 2018
Journal Name
Iraqi National Journal Of Nursing Specialties
Construction of an Initial Assessment Documentation Tool for Nursing Recording System in Coronary Care Units
...Show More Authors

Objective : The study was carried out to construct an initial assessment documentation tool for nursing
recording system in Coronary Care Unit.
Methodology : A descriptive, purposive sample of (65) nurses was selected from CCU of main
teaching hospitals (Al Karama, Al Kindy, Al Kadimia, Al Yarmmok, Baghdad teaching hospital, Ibn
Al Naffis hospital) and Ibn-Al betar hospital in Baghdad city from the 15th of April 2004 to the 15th of
April 2006.
The instrument was constructed and comprised of two sections: section one included the
nurses' demographic characteristic; section two was the initial assessment documentation tool that
contained (2) parts including: General information form and the initial assessment form.

... Show More
View Publication Preview PDF
Publication Date
Wed Dec 01 2021
Journal Name
Civil And Environmental Engineering
Developing A Mathematical Model for Planning Repetitive Construction Projects By Using Support Vector Machine Technique
...Show More Authors
Abstract<p>Each project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent</p> ... Show More
View Publication
Crossref (7)
Clarivate Crossref
Publication Date
Tue Feb 05 2019
Journal Name
Journal Of The College Of Education For Women
The value of work to the Elits of prophets and its influence on cultural construction
...Show More Authors

Praise be to Allah and peace and blessings be upon our Prophet Muhammad and on his family and companions
Yet,
The prophets (peace be upon them) urged all thevalues and one of these is the value of work which is of a great importance, that all nations have gathered against us as the eaters gather at a bowl. One of the reasons of our weakness and the strength of our enemy is that we have neglected the value of work. And rather a large number of ignorant and uneducatedpeople started to believe that the means of living, triumph, gaining power, and establishing a civilization are given by Allah with neithergainingnoreffort from us. While we find in the past that Allah the Almighty narrated to us the story of Mary (Peace be upon her) and

... Show More
View Publication Preview PDF
Publication Date
Sat Dec 02 2023
Journal Name
Journal Of Engineering
Empirical Study for Capturing and Allocating Significant Risk Factors in School Construction Projects in Iraq
...Show More Authors

In Iraq, more than 1031 school projects have been halted due to disputes and claims resulting from financial, contractual, or other issues. This research aims to identify, prioritize, and allocate the most critical risk factors that threaten these projects’ success for the duration (2017-2022). Based on a multi-step methodology developed through systematic literature reviews, realistic case studies, and semi-structured interviews, 47 risk factors were identified. Based on 153 verified responses, the survey reveals that the top-ranked risk factors are corruption and bribery, delaying the payments of the financial dues to the contractors or sub-contractors, absence of risk management strategy, multiple change orders due

... Show More
View Publication Preview PDF
Crossref (3)
Crossref
Publication Date
Tue Feb 17 2026
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.

... Show More
View Publication
Publication Date
Sat Jul 01 2017
Journal Name
Journal Of Construction Engineering And Management
Identification, Quantification, and Classification of Potential Safety Risk for Sustainable Construction in the United States
...Show More Authors

View Publication
Scopus (56)
Crossref (53)
Scopus Clarivate Crossref
Publication Date
Mon Jan 01 2018
Journal Name
Journal Of Engineering
Optimal Economic Design of Diversion Structures during Construction of a Dam by Particle Swarm Optimization
...Show More Authors