Piled raft is commonly used as foundation for high rise buildings. The design concept of piled raft foundation is to minimize the number of piles, and to utilize the entire bearing capacity. High axial stresses are therefore, concentrated at the region of connection between the piles and raft. Recently, an alternative technique is proposed to disconnect the piles from the raft in a so called unconnected piled raft (UCPR) foundation, in which a compacted soil layer (cushion) beneath the raft, is usually introduced. The piles of the new system are considered as reinforcement members for the subsoil rather than as structural members. In the current study, the behavior of unconnected piled rafts systems has been studied numerically by means of 3D Finite Element analysis via ABAQUS software. The numerical analysis was carried out to investigate the effect of thickness and stiffness of the cushion, pile length, stiffness of foundation soil, and stiffness of bearing soil on the performance of the unconnected piled raft. The results indicate that when unconnected piles are used, the axial stress along the pile is significantly reduced e.g. the axial stress at head of unconnected pile is decreased by 37.8% compared with that related to connected pile. It is also found that the stiffness and thickness of the cushion, and stiffness of foundation soil have considerable role on reduction the settlement.
In the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Secured multimedia data has grown in importance over the last few decades to safeguard multimedia content from unwanted users. Generally speaking, a number of methods have been employed to hide important visual data from eavesdroppers, one of which is chaotic encryption. This review article will examine chaotic encryption methods currently in use, highlighting their benefits and drawbacks in terms of their applicability for picture security.
Different injection material types were tried in the injection of soft clay, such as lime (L), silica fume (SF), and leycobond-h (LH). In this study, experiments were made to study the effect of injection on soft clay consolidation settlement. A sample of natural soft clayey soil was investigated in the laboratory and the sample was injected with each of the grout materials used, L, SF, L + SF, and L + SF + LH. A 20 cm3 of each slurry grout was conducted into the soil, which was compacted in California Bearing Ratio (CBR) mold and cured for 7 days, and then the sample was loaded to 80 N load by a circular steel footing 60 mm in diameter. The settlement was r
The new sustainable development goals set by the UN include a goal of making cities inclusive, safe, sustainable, and resilient. Cities are growing at huge rates, and conditions of deteriorating QOL̛s are increasing in the form of poor access to services, and slums are remarkable, especially in the cities of the Middle East; hence, the research problem can arise from a lack of knowledge regarding the in determination of a way to assess the resilience of cities to develop mechanisms that will improve the quality of urban life. In this study, a tool called CRF has been applied for the assessment of the city's resilience principles of health and quality of life, economics and social, infrastructure and environmental systems, and the principle
... Show More