The Karolinka earth-fill dam was constructed between 1977 and 1984 on the Stanovnice river above the town of Karolinka in the region of Vsetínsko in Czech Republic. Because of leakage on the downstream dam face due to technological indiscipline when filling dam layers during the dam construction stage, there were some steps to improve state dam safety. The final rehabilitation is to construct the diaphragm walls from self-hardening cement-bentonite suspension along the length of the dam. In addition to connecting the gallery and abutment (2 × 25 m long) by using jet piles. The article presents numerical modeling of safety factor evaluation associated with the state of the dam body and foundation; before, and after sealing. Also, studying the effect of dam height on its stability by using finite element method is performed by the Plaxis 3D program in the case study of Karolinka dam. It is concluded that measured data shows good agreement with the computed result.
The responsibility of the Central Bank through the implementation of its monetary policy to maintain the integrity and stability of the financial system and the economic system, because any shock, whether internal or external, may endanger the financial system and instability, so the research sheds light on the effectiveness of monetary policy in maintaining financial stability, The most important conclusion is that there is an increase in capital, which gives banks the possibility to face the risks to which they are exposed, as well as a rise in the total bad debts, which weakens its financial position, which constitutes a decline in the financial stability of these banks.
The drones have become the focus of researchers’ attention because they enter into many details of life. The Tri-copter was chosen because it combines the advantages of the quadcopter in stability and manoeuvrability quickly. In this paper, the nonlinear Tri-copter model is entirely derived and applied three controllers; Proportional-Integral-Derivative (PID), Fractional Order PID (FOPID), and Nonlinear PID (NLPID). The tuning process for the controllers’ parameters had been tuned by using the Grey Wolf Optimization (GWO) algorithm. Then the results obtained had been compared. Where the improvement rate for the Tri-copter model of the nonlinear controller (NLPID) if compared with
The research has designed for studying the relationship between manufacturing strategy and its flexibility under the flexible manufacturing system with their reflection on the competitive environmental performance of the firm. To interpret and tackle the problem, a hypothesis has formulated stating that “ the competitive performance of a firm is interpreted by the manufacturing strategy and flexibility which are derived from the firm and its business strategies under the flexible manufacturing system”. Related literatures with their theoretical dissertations, which enhanced the thoughtful content, have analyzed. An illustrative case study on the flexible manufacturing system at Toyota Motors Corporation working at the g
... Show MoreRainwater harvesting could be a possible solution to decrease the consequences of water scarcity and energy deficiency in Iraq and the Kurdistan Region of Iraq (KRI). This study aims to calculate the water and energy (electricity) saved by rainwater harvesting for rooftops and green areas in Sulaimani city, KR, Iraq. Various data were acquired from different formal entities in Sulaimani city. Moreover, Google Earth and ArcMap 10.4 software were used for digitizing and calculating the total rooftop and green areas. The results showed that for the used runoff coefficients (0.8 and 0.95), the harvested rainwater volumes were 2901563 and 12197131 m³ during the study period (2005 – 2006) and (2019-2020). Moreover, by compa
... Show MoreThis study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show More