Preferred Language
Articles
/
joe-847
Demand Priority in a Power System With Wind Power Contribution Load Shedding Scheme Based
...Show More Authors

The load shedding  scheme has been extensively implemented as a fast solution for unbalance conditions. Therefore, it's crucial to investigate supply-demand balancing in order to protect the network from collapsing and to sustain stability as possible, however its implementation is mostly undesirable. One of the solutions to minimize the amount of load shedding is the integration renewable energy  resources, such as wind power, in the electric power generation could contribute significantly to minimizing power cuts as it is ability to positively improving the stability of the electric grid. In this paper propose a method for shedding the load base on the priority demands with incorporating the wind power generated. The higher priority demands are fed with a reliable wind energy resource in order to protect them from shedding under contingency condition such as high overloading by the real time monitoring of the network accompanied with power reducing for the lower priority demands. The simulation results prove effectiveness and practicality of the applied method paving the way for possible applications in power systems.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue May 01 2012
Journal Name
Journal Of Engineering
Study on wind loads coefficients and flow field characteristics around the parabolic trough with stiffeners
...Show More Authors

wind load coefficient

Publication Date
Sat May 16 2026
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.

... Show More
View Publication
Publication Date
Thu Dec 01 2011
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at theMechanical Engineering Department at Baghdad University - College of Engineering. The work is one ofthe pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes thefirst part of the work; that is the design calculations, simulation and construction. It will be followed by asecond part that describes testing and calibration of the tunnel. The proposed wind tunnel has a testsection with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flowdisturbances in the test sec

... Show More
View Publication
Crossref (7)
Crossref
Publication Date
Sun Jan 01 2023
Journal Name
8th Engineering And 2nd International Conference For College Of Engineering – University Of Baghdad: Coec8-2021 Proceedings
Optimal characteristics of wind turbine to maximize capacity factor
...Show More Authors

The capacity factor is the main factor in assessing the efficiency of wind Turbine. This paper presents a procedure to find the optimal wind turbine for five different locations in Iraq based on finding the highest capacity factor of wind turbine for different locations. The wind data for twelve successive years (2009-2020) of five locations in Iraq are collected and analyzed. The longitudes and latitudes of the candidate sites are (44.3661o E, 33.3152o N), (47.7738o E, 30.5258o N), (45.8160o E, 32.5165o N), (44.33265o E, 32.0107o N) and (46.25691o E, 31.0510o N) for Baghdad, Basrah, Al-Kut, Al-Najaf, and Al-Nasiriyah respectively. The average wind velocity, standard deviation, Weibull shape and scale factors, and probability density functi

... Show More
View Publication
Crossref (2)
Crossref
Publication Date
Wed Jul 03 2013
Journal Name
Journal Of Earth Sciences And Geotechnical Engineering
Time Domain of Piles Force and Deflection History of Piled Raft System under Axial Repeated Impact Load
...Show More Authors

In order to understand the effect of the number of piles (N), the history response of dynamic pile load in piled raft system and deflection time history of piled raft under repeated impact load applied on the center of piled raft resting on loose sand, laboratory model tests were conducted on small-scale models. The results of experimental work are found to be dynamic load increase with increase height of drop, the measured repeated dynamic load time history on the center of piled raft was close approximately to three a half sine wave shape with small duration in about (0.015 Sec). The maximum peak of impact loads occurs in pile and deflection time history occur after at the time of the peak repeated impact loads, dynamic pile load

... Show More
Publication Date
Wed Sep 30 2020
Journal Name
Journal Of Accounting And Financial Studies ( Jafs )
Effect of measurement and analysis of quality costs on continuous improvement: Applied research in the Directorate General for the distribution of electric power in the Middle Euphrates
...Show More Authors

The research aims to identify the theoretical foundations for measuring and analyzing quality costs and continuous improvement, as well as measuring and analyzing quality costs for the Directorate of Electricity Supply / Middle Euphrates and continuous improvement of the distribution of electrical energy,The problem was represented by the high costs of failure and waste in electrical energy result to the excesses on the network and the missing (lost) energy,Thus, measuring and analyzing quality costs for the distribution of electrical energy and identifying continuous improvement leads to a reduction in missing and an increase in sales, as the research reached many conclusions, the most important of which is the high percentage o

... Show More
View Publication Preview PDF
Publication Date
Sat Jan 01 2022
Journal Name
Geotechnical Engineering And Sustainable Construction
Evaluation of Live Load Distribution Factors of a Highway Bridge
...Show More Authors

Scopus (1)
Scopus Crossref
Publication Date
Wed Aug 31 2022
Journal Name
International Journal Of Intelligent Engineering And Systems
Performance Evaluation Based on Multi-UAV in Airborne Computer Network System
...Show More Authors

View Publication
Scopus (5)
Crossref (1)
Scopus Crossref
Publication Date
Fri Nov 01 2019
Journal Name
International Journal On Interactive Design And Manufacturing (ijidem)
A real-time automated sorting of robotic vision system based on the interactive design approach
...Show More Authors

View Publication
Scopus (41)
Crossref (32)
Scopus Clarivate Crossref
Publication Date
Mon Dec 16 2024
Journal Name
Light & Engineering
The Design and Experimental Realization of a Laser-Based Heating System Using Recycled Laser Module
...Show More Authors

Laser is a powerful device that has a wide range of applications in fields ranging from materials science and manufacturing to medicine and fibre optic communications. One remarkable

View Publication