Reservoir study has been developed in order to get a full interesting of the Nahr Umr formation in Ratawi oil field. Oil in place has been calculated for Nahr Umr which was 2981.37 MM BBL. Several runs have been performed to get matching between measured and calculated of oil production data and well test pressure. In order to get the optimum performance of Nahr Umr many strategies have been proposed in this study where vertical and horizontal wells were involved in addition to different production rates. The reservoir was first assumed to be developed with vertical wells only using production rate of (80000–125000) STB/day. The reservoir is also proposed to produce using horizontal wells besides vertical wells with production rate of (80000-150000) STB/day. The best strategy was by adding 33 new vertical wells and 5 horizontal wells beside the 11 existing wells where the results show oil plateau of 9 years and 7 months and recovery factor of 3.4%.
The solution gas-oil ratio is an important measurement in reservoir engineering calculations. The correlations are used when experimental PVT data from particular field are missing. Additional advantages of the correlations are saving of cost and time.
This paper proposes a correlation to calculate the solution gas -oil ratio at pressures below bubble point pressure. It was obtained by multiple linear regression analysis of PVT data collected from many Iraqi fields.
In this study, the solution gas-oil ratio was taken as a function of bubble point pressure, stock tank oil gravity, reservoir pressure, reservoir temperature and relative gas density.
The construction of the new correlation is depending on thirty seven PVT reports th
The research dealt with the subject of measuring the competitive performance of the National Insurance Company and some of its branches (Basra, Ninwa, Kirkuk and Babil), Depending on the Revenue Growth Index at the activity level, and the Revealed Comparative Advantage Index RCAIAt the branch level,To measure the competitiveness of the company And some branches, As the problem of research in the lack of adoption by some companies in the insurance service sector on scientific indicators to measure their competitive performance, The aims of the research is to measure the competitiveness of the National Insurance Company, as well as the competitiveness of its branches according to the scientific method, One of the main Conclusions of the re
... Show MoreThe method of analysis is one of the tools the coach to identify strengths andweaknesses of each player, and how to avoid mistakes that in the course ofperformance on the other hand, Voslob analysis is important for the player, as throughthe analysis will determine the capacity enjoyed by both the coach and player, as wellas being the possibility of progress in a scientific manner thoughtful, and also helps inthe evaluation of physical and skill level and tactical, psychological and trainingcapacity of the coach in order to avoid obstacles and make the coach is movingtowards the right track to improve the good level, and then an investigation tocomplete higher education.Hence the importance of research in the analysis of simple attack and n
... Show MoreThe reality of the field of construction projects in Iraq refers to needing for the development of performance in order to improve quality and reduce defects and errors and to control the time and cost, so there is needing for the application of effective methods in this area, one of the methods that can be applied in this area is the manner of Six Sigma. This research aims to enhance the performance and quality improvement for the construction projects by improving performance in the work of the implementation of the concrete structure depending on the Six Sigma methodology, and for the purpose of achieving the aim of the research, the researcher firstly depends on the theoretical study that include the concepts of qual
... Show MoreNatural fractures provide an important reservoir space and migration channels for oil and gas reservoirs and control the reservoir potential. Therefore, it is essential to understand the methods for identifying accurate reservoir permeability and characterizing reservoir fractures. In particular, using conventional measurements to identify permeability and characterize fractures is very expensive. While using conventional logging data is very challenging, and an efficient characterization correlation method is urgently needed. In this paper, we have evaluated reservoir potential based on the sensitivity of sonic scanner tools to fluid mobility, maximum stress direction, and fractures presence. This tool provides a continuous estimat
... Show MoreRock mechanical properties are critical parameters for many development techniques related to tight reservoirs, such as hydraulic fracturing design and detecting failure criteria in wellbore instability assessment. When direct measurements of mechanical properties are not available, it is helpful to find sufficient correlations to estimate these parameters. This study summarized experimentally derived correlations for estimating the shear velocity, Young's modulus, Poisson's ratio, and compressive strength. Also, a useful correlation is introduced to convert dynamic elastic properties from log data to static elastic properties. Most of the derived equations in this paper show good fitting to measured data, while some equations show scatters
... Show MoreGeomechanical modelling and simulation are introduced to accurately determine the combined effects of hydrocarbon production and changes in rock properties due to geomechanical effects. The reservoir geomechanical model is concerned with stress-related issues and rock failure in compression, shear, and tension induced by reservoir pore pressure changes due to reservoir depletion. In this paper, a rock mechanical model is constructed in geomechanical mode, and reservoir geomechanics simulations are run for a carbonate gas reservoir. The study begins with assessment of the data, construction of 1D rock mechanical models along the well trajectory, the generation of a 3D mechanical earth model, and runni
Building numerical reservoir simulation model with a view to model actual case requires enormous amount of data and information. Such modeling and simulation processes normally require lengthy time and different sets of field data and experimental tests that are usually very expensive. In addition, the availability, quality and accessibility of all necessary data are very limited, especially for the green field. The degree of complexities of such modelling increases significantly especially in the case of heterogeneous nature typically inherited in unconventional reservoirs. In this perspective, this study focuses on exploring the possibility of simplifying the numerical simulation pr