Preferred Language
Articles
/
joe-619
Examining the Values and Principles of Agile Construction Management in Iraqi Construction Projects
...Show More Authors

The avoidance of failure in construction projects is not an easy task, which makes the failure of the construction project to achieve its objectives a major problem experienced by all countries in the world, especially Iraq. Where nearly two-thirds of the construction projects in the world have been suffered by significant problems as an increase in the cost of the project, delay in the specified duration for execution, and stopping the project. Therefore it is required to study and apply new methods for managing the construction project to ensure its success and achieve its objectives. The aim of this study is to study the Agile project management method and its impact on the construction project. In addition, to identify the values and principles of Agile project management, which can be applied in the Iraqi construction industry to be adopted it as a new method to manage the construction projects in Iraq. The researcher reviewed the relevant literature to define the method of Agile project management and its methods and impact on the construction project. Then, the researcher conducted a questionnaire survey of a sample of engineers' experts who work in four main parties in the construction project: (beneficiary, supervising, designer, and contractor). The results of this survey showed that it is possible to apply the four values of Agile project management for managing the Iraqi construction projects, and can apply eleven of the twelve principles of Agile project management for managing the Iraqi construction projects.

 

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Tue Jan 01 2013
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.

Publication Date
Tue Dec 15 2020
Journal Name
Al-academy
Aesthetic and Functional Dimensions of the Industrial Product and their Influence on Construction of Consumer's Visual Impression: جاسم احمد زيدان
...Show More Authors

  The visual impression represents a compound process of a group of concepts that might be secondary and interrelated to constitute, in reality, a cognitive image stored in the memory that can be retrieved according the implications of the situation in which the individual lives in his environment, as it awakens in him an image from the sub consciousness, thus it gets stimulated, and it is among the tangible things.
Since we live in our contemporary world under the development of knowledge, micro and wide technology of the devices, tools, materials, mechanisms, current developments and openness… etc. this transformation created visual impressions that the individual in general and the consumer in specific enjoys concerning his

... Show More
View Publication Preview PDF
Crossref
Publication Date
Mon Apr 01 2019
Journal Name
International Journal Of Electrical And Computer Engineering (ijece)
Managing usability evaluation practices in agile development environments
...Show More Authors

<span lang="EN-US">Usability evaluation is a core usability activity that minimizes risks and improves product quality. The returns from usability evaluation are undeniable. Neglecting such evaluation at the development stage negatively affects software usability. In this paper, the authors develop a software management tool used to incorporate usability evaluation activities into the agile environment. Using this tool, agile development teams can manage a continuous evaluation process, tightly coupled with the development process, allowing them to develop high quality software products with adequate level of usability. The tool was evaluated through verification, followed by the validation on satisfaction. The evaluation resu

... Show More
View Publication
Crossref (3)
Crossref
Publication Date
Mon Feb 19 2018
Journal Name
Al-academy
The Mechanisms of build up the dramatic construction in the films of the world of nature - National Geographic's films as a model-
...Show More Authors

The subject of  research entitled "The Mechanisms of build up the dramatic construction in the films of the world of nature - National Geographic's films as a model" emerges from the importance of the subject of the dramatic construction and its departure from its classic style due to the evolution of the visual  presentation and its instruments and the specificity and emergence of a form of television production represented by the films of the world of nature which began to occupy an important space in the map of television and television channels specialized in this subject, which drove the researcher to study the mechanisms of producing the dramatic construction in this kind of film s. This research came in three  chapt

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 19 2019
Journal Name
Iraqi Journal Of Agricultural Sciences
USING PROBABILITY REGRESSION MODELS TO MEASURING MANAGEMENT EFFICIENCY FOR BROILER PROJECTS
...Show More Authors

The efficiency of management is determining factor for the success or failure of agricultural projects generally and Livestock particularly achieving its objectives. Therefore, this research came to diagnose the most important variables that determine the efficiency of management using the probability regression models to measure the probability of management efficient of broilers production projects using  random sample included (60) broilers projects represented 11.6% of Baghdad province (research community) in 2016. After estimating the relationship between the management efficiency (descriptive dependent variable) and the independent variables affecting it (age, educational level, production index (PI), experience). The results

... Show More
View Publication
Crossref
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Values and technology in architecture - the impact and vulnerability
...Show More Authors

Technology is an important factor for achieving architecture as an impact and vulnerability. It represents one of the significant elements in creating the intellectual framework, as well as having its own intellectual breakdown, while values constitute the most important and obviously factor of the community's intellectual. Research aims was determined accordingly by: investigating the role and impact of values and their relationship to technology in architecture.

In this context, the research investigated values and technology in architecture, through discussing their aspects and dimensions in architecture. In the context of values, the research discussed their concept and the related ones to have a concrete def

... Show More
View Publication Preview PDF
Publication Date
Sun Apr 01 2018
Journal Name
Journal Of Economics And Administrative Sciences
Designing and Application of Mathematical Model A Multi – Objectives for Assessment The Quality Of The Project : A Case Study at Saad Public Construction Company
...Show More Authors

Abstract

This research aims to design a multi-objective mathematical model to assess the project quality based on three criteria: time, cost and performance. This model has been applied in one of the major projects formations of the Saad Public Company which enables to completion the project on time at an additional cost that would be within the estimated budget with a satisfactory level of the performance which match with consumer requirements. The problem of research is to ensure that the project is completed with the required quality Is subject to constraints, such as time, cost and performance, so this requires prioritizing multiple goals. The project

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Photochemistry And Photobiology A: Chemistry
Construction of co-zeolitic imidazolate framework/Bi2WO6 heterojunction photocatalyst with improved adsorption and photodegradation of ciprofloxacin
...Show More Authors

View Publication
Scopus (47)
Crossref (48)
Scopus Clarivate Crossref
Publication Date
Sun Jun 01 2014
Journal Name
Baghdad Science Journal
The construction of Complete (kn,n)-arcs in The Projective Plane PG(2,5) by Geometric Method, with the Related Blocking Sets and Projective Codes
...Show More Authors

A (k,n)-arc is a set of k points of PG(2,q) for some n, but not n + 1 of them, are collinear. A (k,n)-arc is complete if it is not contained in a (k + 1,n)-arc. In this paper we construct complete (kn,n)-arcs in PG(2,5), n = 2,3,4,5, by geometric method, with the related blocking sets and projective codes.

View Publication Preview PDF
Crossref
Publication Date
Fri Mar 30 2001
Journal Name
Iraqi Journal Of Chemical And Petroleum Engineering
Construction of Nomograms Describing the Effect of Different Variables on the Behavior of a KCl/Polymer Drilling Fluid
...Show More Authors

View Publication Preview PDF