A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
disturbances in the test section. The design philosophy is discussed and methods for wind tunnel
calculation are outlined. Simulation of wind tunnel using ANSYS shows no separation of flow along
wind tunnel. Construction steps are also included in present work.
The most important environmental constraints at the present time
is the accumulation of glass waste (transparent glass bottles). A lot of
experiments and research have been made on waste and recycling
glass to get use it as much as possible. This research using recycling
of locally waste colorless glass to turn them into raw materials as
alternative of certain percentages of cement to save the environment
from glass waste and reduce some of the disadvantages of cement
with conserving the mechanical and physical properties of concrete
made. A set of required samples were prepared for mechanical test
with different weight percentage of waste glass (2%, 4%, 5%, 6%,
8%, 10%, 15%, 20% and 25%). American standard
The solar eclipse occurs at short time before the crescent birth moment when the moon near any one of moon orbit nodes It is important to determine the synchronic month which is used to find Higree date. The 'rules' of eclipses are:
Y= ± 0.997 of Earth radius , the solar eclipse is central and 0.997 < |Y| < 1.026 the umbra cone touch the surface of the Earth, where Y is the least distance from the axis of the moon's shadow to the center of the Earth in units of the equatorial radius of the Earth.
A new model have been designed, depend on the horizontal coordinates of the sun, moon, the distances Earth-Moon (rm), Earth-sun (rs) and |Y| to determine the date and times of total solar eclipse and the geogra
... Show MoreSituational regret and its relation to the vitality of conscience among university students The research seeks to identify situational regret and its relation to the vitality of conscience among university students, identify the significant differences in regard with students’ gender, and identify if there is a correlation between situational regret and the vitality of conscience. To do this, two scales were adopted; one to measure situational regret consisted of (31) items, which was designed by (Al-badrani, 2006), besides, costa and macrys’ (1992) scale that translated in Arabic language by (Al-qaisy, 2013). It composed of (35) items. Total of (120) male and female students were collected from three-different colleges (science, art
... Show More
The current study aims to identify agreeableness and orientation towards voluntary work of officials in public facilities, as well as to identify the nature of the correlation between agreeableness and orientation towards voluntary work of officials in public facilities. To achieve the aims of the research, the researchers designed the agreeableness scale, which consists of (28) items in its final form. The researchers also built a scale of orientation towards voluntary work, which consists of (29) items in its final form. Psychometric properties of validity and reliability of the two scales were extracted in various ways. The researcher applied the two scales on a sample of (400) officials, the results indicated that the
... Show MoreThe steel jetty selected for strengthening is in Baghdad city, over Tigris River, consists of 55 short spans, each of approximately 4 meters and one naviga-tional opening of 12 m. The bridge is 224 meters length and 8 meters in width. The strengthening system was designed to remove overstresses that occurred when the bridge was subjected to abnormal loads of 380 tons. A strengthening system which installed in spring 2008 was used where the main concept is to depend on added side supporting elements which impose reversal forces on the bridge to counteract most of the loads expected from the abnormal heavy loads. The bridge was load tested before and after the strengthening system was activated. The load test results indicate that the strengt
... Show More
Regression testing is a crucial phase in the software development lifecycle that makes sure that new changes/updates in the software system don’t introduce defects or don’t affect adversely the existing functionalities. However, as the software systems grow in complexity, the number of test cases in regression suite can become large which results into more testing time and resource consumption. In addition, the presence of redundant and faulty test cases may affect the efficiency of the regression testing process. Therefore, this paper presents a new Hybrid Framework to Exclude Similar & Faulty Test Cases in Regression Testing (ETCPM) that utilizes automated code analysis techniques and historical test execution data to
... Show More