A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
disturbances in the test section. The design philosophy is discussed and methods for wind tunnel
calculation are outlined. Simulation of wind tunnel using ANSYS shows no separation of flow along
wind tunnel. Construction steps are also included in present work.
This study attempts to test the interactive role played by organizational agility in enhancing the effect of organizational anomie on the behavior of planned human resources. The study of organizational anomie has increased because of the moral and legal pressures facing the organization by the external environment within its framework. To adapt to all external developments faced by these organizations, the behavior of human resources planned reflects the ability of individuals to control their behavior in different situations and situations that face them in the work.
The problem of the research indicates that there is a clear lack of understanding of what is meant by the variables studied in the sample
... Show MoreThe research aims to design a narrow-band frequency drive amplifier (1.5GHz -1.6GHz), which is used to boost the transmitter amplifier's input signal or amplify the GPS, GlONASS signals at the L1 band.
The Power Amplifier printed circuit board (PCB) prototype was designed using InGaP HBT homogeneous technology transistor and GaAs Heterojunction Bipolar Transistor (HBT) transistor. Two models have been compared; one of the models gave 16dB gain, and the other gave 23dB when using an input power signal (-15dBm). The PCB consumes 2.4W of power and has a physical dimension of 11 x 4 cm.
Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show MoreRefuse derived fuel (RDF) is considered one of the most important types of low cost thermal energy which can be tapped in the industry, especially the cement industry in particular being the need of high thermal energy during the production processes, and in this paper we have implemented the use of a derivative of the fuel RDF as a substitute for gasoline , to reduce production costs and thereby achieve production efficiency, and the methodology used in this research statistical analysis as well as the use of the cost of kaizen target for the purpose of reducing costs and achieve production efficiency, and this has reduced the cost total cement production by which led to reduce total costs of cement production by 8.4% and an incre
... Show MoreThe current research attempts to examine the relationship between social-psychological conflict and their relation to family upbringing approaches among the adolescents of intermediate stage according to sex and economical level. To do this, the researcher prepared a questionnaire to measure social-psychological conflict that consisted of (32) item divided on four dimensions, and also she prepared a questionnaire to measure family upbringing approaches which composed of (28) item divided on four dimensions. The sample was (260) male and female student from intermediate stage chosen randomly. The results revealed that there were significant differences between social-psychological conflict which went to male, there was a negative correlat
... Show MoreWhen industrial and constructional renaissance started in the world, the great interest was going on towards the equipment’s, which was the first mean for production. After industry was settled the interest was going on towards the men ship which manpower on which the production depends. It was approved that it represents the basic part in all of the processes and the protection of those individuals against dangers of these equipment’s, industry and its accidents was the basic things which was studied in many researches until it crystallized in general principles for all industries and other take care in each industry.
The professional safety is concerned as restrict which
... Show MoreRoller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a
... Show MoreIn the field of construction project management, time and cost are the most important factors to be considered in planning every project, and their relationship is complex. The total cost for each project is the sum of the direct and indirect cost. Direct cost commonly represents labor, materials, equipment, etc.
Indirect cost generally represents overhead cost such as supervision, administration, consultants, and interests. Direct cost grows at an increasing rate as the project time is reduced from its original planned time. However, indirect cost continues for the life of the project and any reduction in project time means a reduction in indirect cost. Therefore, there is a trade-off between the time and cost for completing construc
Construction is a complicated process that takes place in an almost uncontrollable environment. Although projects can be carefully planned in advance in principle, there is a chance that unforeseen events and crises can disrupt these plans, affecting project development. Because the initial investment expenditures in construction projects are so large, they may be quickly influenced by crises, resulting in significant financial losses. The 2014 financial crisis was one of the most prominent crises that Iraq faced, which significantly impacted various activities in general and the construction industry in particular. Despite the importance of crisis management systems, the researchers found a great lack of local studies looking at cr
... Show More