A low speed open circuit wind tunnel has been designed, manufactured and constructed at the
Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of
the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the
first part of the work; that is the design calculations, simulation and construction. It will be followed by a
second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test
section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70
m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow
disturbances in the test section. The design philosophy is discussed and methods for wind tunnel
calculation are outlined. Simulation of wind tunnel using ANSYS shows no separation of flow along
wind tunnel. Construction steps are also included in present work.
The interior spaces represent a true reflection of the concepts and values of humanity and requirements; were interested in current research ongoing changes that have occurred in those human values and requirements over time, even pat each time warp its values and its own requirements. Those changes, which receive Bdilalha the spaces linked by a renewal which guarantees the interior design of the spaces of sustainability and bio-coordinated. Launched search from an initial perception that those associated with the changes of the spaces through time that have not been subject to examination and supervision, they will constitute a continuing threat of losing the ties with the past under the pretext of modernization and mo
... Show MoreThis study is targeting the new developed materials and techniques and how they were affected by the scientific and technological developments that contributed to revelated new and varied developed materials and techniques. And from the artist’s formulation by using the materials and techniques and through its embodiment and sensor the values, artistic and aesthetic standards by breaking from the familiar in aesthetic contemporary way.
The studies on questioning what’s the role of The New Developed Materials and Techniques in exposing the aesthetic of the art work?
This study is to show the aesthetic of the art work through the new developed materials and techniques. Which was based on descriptive analyzing method and hig
... Show MoreIn this work, porous silicon gas sensor hs been fabricated on n-type crystalline silicon (c-Si) wafers of (100) orientation denoted by n-PS using electrochemical etching (ECE) process at etching time 10 min and etching current density 40 mA/cm2. Deposition of the catalyst (Cu) is done by immersing porous silicon (PS) layer in solution consists of 3ml from (Cu) chloride with 4ml (HF) and 12ml (ethanol) and 1 ml (H2O2). The structural, morphological and gas sensing behavior of porous silicon has been studied. The formation of nanostructured silicon is confirmed by using X-ray diffraction (XRD) measurement as well as it shows the formation of an oxide silicon layer due to chemical reaction. Atomic force microscope for PS illustrates that the p
... Show MoreThe main aim of this research is to introduce financing cost optimization and different financing alternatives. There are many studies about financing cost optimization. All previous studies considering the cost of financing have many shortcomings, some considered only one source of financing as a credit line without taking into account different financing alternatives. Having only one funding alternative powers, restricts contractors and leads to a very specific financing model. Although it is beneficial for the contractor to use a long-term loan to minimize interest charges and prevent a substantial withdrawal from his credit line, none of the existing financial-based planning models have considered long-term loans in
... Show MoreConstruction projects are complicated in nature and require many considerations in contractor selection. One of the complicated interactions is that between performance with the project size, and contractor financial status, and size of projects contracted. At the prequalification stage, the financial requirements restrict the contractors to meet minimum limits in financial criteria such as net worth, working capital and annual turnover, etc. In construction projects, however, there are cases when contractors meet these requirements but show low performance in practice. The model used in the study predicts the performance by training of a neural network. The data used in the study are 72 of the most recent roadw
... Show More