An experimental and theoretical analysis was conducted for simulation of open circuit cross flow heat
exchanger dynamics during flow reduction transient in their secondary loops. Finite difference
mathematical model was prepared to cover the heat transfer mechanism between the hot water in the
primary circuit and the cold water in the secondary circuit during transient course. This model takes under
consideration the effect of water heat up in the secondary circuit due to step reduction of its flow on the
physical and thermal properties linked to the parameters that are used for calculation of heat transfer
coefficients on both sides of their tubes. Computer program was prepared for calculation purposes which
cover all the variables that affect such type of transient mechanisms. The effect of the power density in
the primary circuit and the water flow reduction percentage on the average temperature build up of the
water in the primary circuit was investigated. The elapsed time required for the primary circuit average
temperature to reach a steady state value was also calculated. These calculations were supported with
experimental measurements conducted on a standard cross flow heat exchanger apparatus. The
experimental results were compared with the theoretical results for certain power density value at
different flow reduction percentages which show a reliable agreement. This relative agreement was
necessary to consider the mathematical model with certain assurance for calculating transient parameters
for higher power densities that are out of apparatus ranges. The results proved that water average
temperature build up in the primary circuit has sharp tendency when the percentage of flow reduction in
the secondary circuit reach 25% of its nominal values.
The flow in a manifolds considered as an advanced problem in hydraulic engineering applications. The objectives of this study are to determine; the uniformity qn/q1 (ratio of the discharge at last outlet, qn to the discharge at first outlet, q1) and total head losses of the flow along straight and rectangular loop manifolds with different flow conditions. The straight pipes were with 18 m and 19 m long and with of 25.4 mm (1.0 in) in diameter each. While, the rectangular close loop configuration was with length of 19 m and with diameter of 25.4 mm (1.0 in) also. Constant head in the supply tank was used and the head is 2.10 m. It is found that outlets spacing and manifold configuration are the main factors aff
... Show Moreلقد تسبب انتشار الإرهاب في العالم وكذلك الحروب الأهلية والصراعات في أوائل القرن الحادي والعشرين في جميع أنحاء العالم في الكثير من الأضرار وخلفت ضحايا جسيمة. أدت الهجمات الإرهابية على النساء، مثل اختطاف بوكو حرام لأكثر من 270 تلميذة في نيجيريا وتقارير عن انتشار الاغتصاب والاعتداء الجنسي في المناطق التي مزقتها الحرب، إلى إنتاج العديد من العروض المسرحية في الولايات المتحدة التي تصور خواص الجناة وكذلك الضحا
... Show MorePurpose: The aim of this study was to gain insight into causes of time delays and cost overruns in a selection of thirty case projects in Iraq. Delay factors have been studied in many countries/contexts, but not much data exists from countries under the conditions characterizing Iraq during the last 10-15 years.Design/methodology/approach: A case study approach was adopted, with thirty construction projects selected from the Baghdad region, of different types and sizes. For the case of the study, the participants in the projects provided data about the projects through the data collection tool distributed through the questionnaire directed to them. Statistical data analysis was used to build statistical relationships between time and cost d
... Show MoreThe aim of this work is to provide an efficient selection technique as a part of planning process to guide the decision makers to decide the preferences of one supplier over another for purchasing lab instruments in education domain. Fuzzy Analytical Hierarchy Process has used as a multi-criteria decision process, as an industrial engineering tool with certain emphasis on the qualitative aspects required to the decision makers. While the concept of degree of possibility for each criterion is used to reach its relative weights, a specific methodology created to reach the final objective decision of supplier selection. A questionnaire form was developed and distributed to five universities located in Baghdad province with a total
... Show MoreStraight tendons in pretensioned members can cause high-tensile stresses in the concrete extreme fibers at end sections because of the absence of the bending stresses due to self-weight and superimposed loads and the dominance of the moment due to prestressing force alone. Accordingly, the concrete tensile stresses at the ends of a member prestressed with straight tendons may limit the service load capacity of the member. It is therefore important to establish limiting zone in the concrete section within which the prestressing force can be applied without causing tension in the extreme concrete fibers. Two practical methods are available to reduce the stresses at the end sections due to the prestressing force. The first method based
... Show MoreThe steady state laminar mixed convection and radiation through inclined rectangular duct with an interior circular tube is investigated numerically for a thermally and hydrodynamicaly fully developed flow. The two heat transfer mechanisms of convection and radiation are treated independently and simultaneously. The governing equations which used are continuity, momentum and energy equations. These equations are normalized and solved using the Vorticity-Stream function and the Body Fitted Coordinates (B.F.C) methods. The finite difference approach with the Line Successive Over-Relaxation (LSOR) method is used to obtain all the computational results. The (B.F.C) method is used to generate the grid of the problem. A computer program (Fortran
... Show MoreBackground: Thyroid surgery is most common endocrine surgery in general surgical practice. Objectives: the aim of this work is to evaluate the feasibility, benefits and outcomes of open mini-incision thyroidectomy and compared the results with that of conventional thyroidectomy. The comparison between the two groups was in term of incision length, amount of blood loss, time of operation, postoperative pain, hospital stay and the cosmetic outcomes.Type of the study: this is a single-blinded randomized controlled studyMethods: This study compared the advantages and outcomes of 22 patients subjected to mini-incision thyroidectomy (Group A) with the equal numbers of patients subjected to conventional thyroidectomy (Group B).Results: the oper
... Show More