Low bearing capacity of weak soil under shallow footings represents one of construction problems.
Kaolin with water content converges to liquid limit used to represent the weak soil under shallow
footing prototype. On the other hand, fly ash, which can be defined as undesirable industrial waste
material, was used to improve the bearing capacity of the soft soil considered in this research. The soft
soil was prepared in steel box (36×36×25) cm and shallow square footing prototype (6×6) cm were
used .Group of physical and chemical tests were conducted on kaolin and fly ash. The soft soil was
improved by a bed of compacted fly ash placed under the footing with dimensions equal to that of
footing but with different depth ratios. The results show that there is a noticeable improvement in the
behavior of footing when improved by compacted fly ash. The improvement showed a decrease in
settlement and increase in bearing capacity. The improvement ratio in bearing capacity was calculated
by comparing the ultimate bearing capacity value when testing the kaolin alone with its value of kaolin
improved with compacted fly ash at the same value of eccentricity. It is important to note that
eccentricity values were chosen according to the rule of middle third of footing base(i.e.,e≤B/6). The
improvement ratio was about (130%) in average value, that represent a good ratio of improvement
The Sliding Mode Control (SMC) has been among powerful control techniques increasingly. Much attention is paid to both theoretical and practical aspects of disciplines due to their distinctive characteristics such as insensitivity to bounded matched uncertainties, reduction of the order of sliding equations of motion, decoupling mechanical systems design. In the current study, two-link robot performance in the Classical SMC is enhanced via Adaptive Sliding Mode Controller (ASMC) despite uncertainty, external disturbance, and coulomb friction. The key idea is abstracted as follows: switching gains are depressed to the low allowable values, resulting in decreased chattering motion and control's efforts of the two-link robo
... Show MoreA new Spectrophotometric method, is for individual and simultaneous determination of Ciprofloxacin hydrochloride(CIP) and Mebeverin hydrochloride(MEB) by the first and second derivative mode techniques. The first and second derivative spectra of these compounds permitted individual and simultaneous determination of CIP and MEB in concentration range of (4-28μg/mL) by measuring the amplitude of peak- to- base line and the area under peak at selected spectrum intervals. The methods showed a reasonable precision and accuracy and have been applied to determine CIP and MEB in four different pharmaceutical preparations.
The interlaminar fracture toughness of polymer blends reinforced by glass fiber has
been investigated. Epoxy (EP), unsaturated polyester(UPE), polystyrene (PS),
polyurethane (PU) and their blends with different ratios (10%PS/90%EP),
(20%PS/80%EP), (20%PU/80%EP) and (20%PU/80%UPE) were chosen as a matrices A
sheet of composites were prepared using hand lay -up method, these sheet were cut as the
double cantilever beam (DCB) specimen to determine interlaminar fracture toughness of
these composites .Its found that, blending of EP,UPE with 20% of PU will improve the
interlaminar fracture toughness ,but the adding of 10% PS, 20%PS to EP will decrease
the interlaminar toughness of these composites.
Background: It may be an important prospective clinical use of manufacturing of porous implant for clinical situations, such as cases of limitation in bone height, low bone density .The small segment of porous implant an effective osseointegration allows increasing in contact area provided for small segmented porous provided by its surface configuration. This study was done to Fabricate porous titanium implants by powder technology, as well as the observation of removal torque values of porous titanium implants compared to smooth titanium implants. Materials and methods: Twenty porous titanium implants (3.2mm in diameter and 8mm in length) were manufactured by powder technology using commercially pure titanium powder of ≤75um part
... Show MoreThis work was conducted to study the extraction of eucalyptus oil from natural plants (Eucalyptus camadulensis leaves) by organic solvents. the effects of the main operating parameters were studied; type of solvent (n-hexane and ethanol), time to reach equilibrium, the temperature (45°C to 65°C) for n-hexane and (45°C to 75°C) for ethanol, solvent to solid ratio (5:1 to 8:1 (v/w)), agitation speed (0 to 900 rpm) and the particle size (0.5 to 2.5 cm) of fresh leaves to find the best processing conditions for the achieving maximum oil yield. The concentration of eucalyptus oil in solvent was measured by using UV-spectrophotometer. The results (for n-hexane) showed that the agitation speed of 900 rpm, temperature 65°C with solvent to soli
... Show MoreIn Iraq, there is a limited research work exploring the clinical pharmacists' role from the point of view of other healthcare professionals. To investigate physicians' assessment of clinical pharmacy services at Baghdad hospitals, and compare junior physicians with senior physicians' point of view. The study was conducted in twelve governmental hospitals in Baghdad, Iraq. Data was collected from a sample of two hundred physicians, and through a validated, self-administered questionnaire, which comprised twenty statements in addition to a non-personal information form that precedes the questionnaire The study findings reveal a somewhat positive point of view towards clinical pharmacists' performance in Baghdad h
... Show MoreMonitoring and analysing of the vertical deformations or the settlements of the structures is one of the main research fields in geodetic applications, which is considered a precise periodic measurement, made at different epochs to investigate these deformations on heavy structures.
In this research, the deformation measurements were carried out on one of Baghdad University buildings,” Building of Computers Department” of dimensions (70.0 * 81.3 m.). Due to some cracks observed in their walls, it was necessary to monitor the vertical displacement of this building at some particular monitoring points by constructing a vertical network and measured in different epochs. The first epoch (zero epoch) was carried out in April 2006, the