The construction sector is considered an important and influential pivot in the national economy of any country. Nations are working to develop this sector, receiving modern and developed techniques. So, this sector can be a carrier or a receiver of modern technologies. The cost of technology transfer between the international companies that sponsor this sector is a matter of great importance, especially since different factors affect the need for this advanced technology. The cost of technology transfer in construction is related to multiple factors presented by Knowledge, equipment, plant, hardware and software. The lack of distinguishing and evaluating the direct and indirect costs in the construction sector during technology transfer may lead to infractions in the company's budget. This manuscript aims to investigate the direct and indirect costs of transferring technology and the major factors constrained by this process. This work adopted a theoretical study and investigated the opinions of experts and engineers (by questionnaire) working in different construction sites. This Manuscript showed that the largest weight of the cost for both modern equipment and counsulant/designers is a direct cost and indirect cost, respectively, for transferring technology in the construction sector.
Blastocystis is a ubiquitous human and animal protozoa that inhabit the gastrointestinal tract. Metronidazole is considered the standard drug for the treatment of Blastocystis infection; however, there is growing evidence of treatment failure, hazardous side effects, and appearance of strains resistant to metronidazole. In the last era, many studies have been implicated in the quest for new treatments for Blastocystis infection, especially natural products. Attention has been focused on the effect of Amygdalin (B17) and pumpkin seed on eradicating parasitic infections. The current work was built up to explore the in vitro efficacy of two natural compounds, Amygdalin (B17) and pumpkin seeds against
... Show MoreEach project management system aims to complete the project within its identified objectives: budget, time, and quality. It is achieving the project within the defined deadline that required careful scheduling, that be attained early. Due to the nature of unique repetitive construction projects, time contingency and project uncertainty are necessary for accurate scheduling. It should be integrated and flexible to accommodate the changes without adversely affecting the construction project’s total completion time. Repetitive planning and scheduling methods are more effective and essential. However, they need continuous development because of the evolution of execution methods, essent
The abdominal nerve cord of some species of Iraq Carabids has been studied to evaluate
the variation in the number of the abdominal ganglia among the species and to find out
relation of these variations with the classical taxonomy of the family Carabidae into tribes.
The study aimed to identify the effect of the ethical perception of a sample of managers in public organizations on responsible behavior in light of the rapid changes taking place in the external environment. To achieve this, the researcher followed the descriptive analytical approach by applying a questionnaire of two parts. The first part dealt with the ethical perception according to the scale of Johnson (2015), which consisted of (22) items. The second part dealt with measuring responsible behavior, which consisted of (20) items based on the scale of Development of Ethical Behavior (Narvaez, 2006) for a sample of (125) respondents randomly chosen. The results showed that the estimation degree of managers in public governmental o
... Show More