Efficient operations and output of outstanding quality distinguish superior manufacturing sectors. The manufacturing process production of bending sheet metal is a form of fabrication in the industry of manufacture in which the plate is bent using punches and dies to the angle of the work design. Product quality is influenced by plate material selection, which includes thickness, type, dimensions, and material. Because no prior research has concentrated on this methodology, this research aims to determine V-bending capacity limits utilizing the press bending method. The inquiry employed finite element analysis (FEA), along with Solidworks was the tool of choice to develop drawings of design and simulations. The ASTM E290 standard guides this study. The software in this package may combine CAD (Computer-Aided Design) and CAE (Computer-Aided Engineering) without requiring extra design applications. This study tested SPCC and SPHC plate materials with five thickness variations. The findings embrace the number of failure risks associated with press bending exhibited on the von Mises stress diagram, which is directly proportional to showing the thickness limit of each material type throughout the bending process. The study's findings lay the groundwork for improving manufacturing quality by lowering the number of faulty goods produced by trial and error. Because the maximum allowable die width is 12 mm, the thickness limit of the press bending process is 2 mm. However, due to the greater intensity of the SPCC material, it has a reduced defect rate compared to SPHC material.
Contracting companies play a prominent role today in economic activity, due to their contribution to the implementation of major construction projects which together constitute the infrastructure of society. Most construction projects also suffer from exceeding the time and cost specified and planned for the completion of the project, and this comes for several reasons, including the work environment, country conditions, The method of managing project costs and the techniques used in its implementation Accordingly, the concepts of lean construction came, which help in addressing the causes of waste, both in time and cost, in addition to the fact that project management needs techniques that are useful in controlling the control and manag
... Show MoreAbstract
This research aims to analyze the reality of the production process in an assembly line Cars (RUNNA) in the public company for the automotive industry / Alexandria through the use of some Lean production tools, and data were collected through permanence in the company to identify the problems of the line in order to find appropriate to adopt some Lean production tools solutions, and results showed the presence of Lead time in some stations, which is reflected on the customer's waiting time to get the car, as well as some of the problems existing in the car produced such as high temperature of the car, as the company does not take into account customer preferences,
... Show MoreThe Khabour reservoir, Ordovician, Lower Paleozoic, Akkas gas field which is considered one of the main sandstone reservoirs in the west of Iraq. Researchers face difficulties in recognizing sandstone reservoirs since they are virtually always tight and heterogeneous. This paper is associated with the geological modeling of a gas-bearing reservoir that containing condensate appears while production when bottom hole pressure declines below the dew point. By defining the lithology and evaluating the petrophysical parameters of this complicated reservoir, a geological model for the reservoir is being built by using CMG BUILDER software (GEM tool) to create a static model. The petrophysical properties of a reservoir were computed using
... Show MoreAbstract
This research deals will the declared production planning operation in the general company of planting oils, which have great role in production operations management who had built mathematical model for correct non-linear programming according to discounting operation during raw materials or half-made materials purchasing operation which concentration of six main products by company but discount included just three products of raw materials, and there were six months taken from the 1st half of 2014 as a planning period has been chosen . Simulated annealing algorithm application on non-linear model which been more difficulty than possible solution when imposed restric
... Show MoreThis study investigates the phonotactics of English obstruent clusters in the word-final position from a markedness theory perspective among Iraqi EFL College Students whose native language, Arabic, prefers only two-member word-final obstruent cluster as a maximum. The markedness of clusters is measured depending on Iraqi EFL College Students’ utilization of the simplification strategies. This study tries to answer whether or not word-final obstruent clusters are marked or unmarked for Iraqi EFL College Students, and whether or not the markedness of the obstruent cluster increases as to its length. In order to answer these questions, a test has been distributed among 60 Iraqi EFL Fourth-Year College students, Department of English, Colleg
... Show MoreDocumentary Credit passes through many practical phases starting from Opening credit and matching documents and payment of the amount of credit……etc. It is worthy to mention that there are several aspects that are varied and differed from Bank to another one which can offer Competitive Advantage for the bank …This will be shown in this research.
For the purpose of achieving the objective of this research within the theoretical aspect, the researcher had seen and briefed several books and researches which are mainly related to the subject of the research.
As for the practical aspect, has included Questionnaire which included many questions that are fit and suitable to the hypotheses.
Research sample has
... Show MoreOptical burst switching (OBS) network is a new generation optical communication technology. In an OBS network, an edge node first sends a control packet, called burst header packet (BHP) which reserves the necessary resources for the upcoming data burst (DB). Once the reservation is complete, the DB starts travelling to its destination through the reserved path. A notable attack on OBS network is BHP flooding attack where an edge node sends BHPs to reserve resources, but never actually sends the associated DB. As a result the reserved resources are wasted and when this happen in sufficiently large scale, a denial of service (DoS) may take place. In this study, we propose a semi-supervised machine learning approach using k-means algorithm
... Show MoreThis study aims at examining the effectiveness of using the narrative approach in teaching the Interpretation of the Qur'an course in the development of conceptual comprehension among first-grade middle school female students. To achieve the objective of this study, a quantitative quasi-experimental design has been used. The sample consisted of first-grade middle school female students at "the third middle school" in Buraidah city, as this school suits the objective of the study. A test of conceptual understanding has been built by the researchers according to a list of conceptual understating skills at a significance level of α ≤ 0.05. Results have shown that there are statistically significant differences at the level (α ≤ 0,05)
... Show More