Study on Safety Construction Management Plan
...Show More Authors

After studying the reality of application to occupational safety in new Iraqi building projects and sampling the situation wilt that in developed and neighboring countries, researcher found that there is a big gap in the level of safety application conditions, this indicates the need fora quick and clear reference for local engineers to use it on site for safety conditions in their projects . As a case study the monitors work the researcher studied a huge project in the United Arab Emirates.This project considered for safety requirements to highest grades. This case study may be far away from the projects in Iraq, but we hope to rise the Iraqi work level in the near future. After seeing the way of administration work and how they were rated the severity of each phase of the work, an idea was builtabout the most dangerous situations in projects with multiple floorsbuildings. To find multiple solutions to the risk, researchers identified 46 cases with their ratings, type of perceived risk in each case, and displayed a format survey to the most important specialized institutions and companies operating in Iraq and the United Arab Emirates. Finally theresearcher takes the results,and format a software that any user can use in his personal computer to studythe expected risk,how to avoid it and how to deal with it if it happens.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Thu Feb 01 2024
Journal Name
Journal Of Engineering
Public Procurement Crisis of Iraq and its Impact on Construction Projects
...Show More Authors

 

The public procurement crisis in Iraq plays a fundamental role in the delay in the implementation of construction projects at different stages of project bidding (pre, during, and after). The procurement system of any country plays an important role in economic growth and revival. The paper aims to use the fuzzy logic inference model to predict the impact of the public procurement crisis (relative importance index and Likert scale) was carried out at the beginning to determine the most important parameters that affect construction projects, the fuzzy analytical hierarchy process (FAHP) to set up, and finally, the fuzzy decision maker's (FDM) verification of the parameter for comparison with reality. Sixty-five

... Show More
View Publication Preview PDF
Crossref
Publication Date
Thu Feb 24 2022
Journal Name
Journal Of Educational And Psychological Researches
Down syndrome construction
...Show More Authors

Due to the increasing number of people with in Iraq, it has become necessary to treat seriously this problem, which was not considered significantly to the best of researcher knowledge. Thus, the current research aims to construct a scale to measure the physical down syndromes, which distinguish them from others. It consisted of (39) items. The researcher has presented some related literature that addressed the current problem

View Publication Preview PDF
Publication Date
Thu Jun 26 2025
Journal Name
Plos One
Neurologists’ perspectives on management challenges and mitigation strategies for Parkinson’s disease patients: A qualitative study in Iraq
...Show More Authors

Background Parkinson’s disease (PD) is currently the fastest-growing neurological disorder in the world. Patients with PD face numerous challenges in managing their chronic condition, particularly in countries with scarce healthcare infrastructure. Objective This qualitative study aimed to delve into neurologists’ perspectives on challenges and gaps in the Iraqi healthcare system that influence the management of PD, as well as strategies to mitigate these obstacles. Method Semi-structured interviews were conducted with neurologists from five different Iraqi provinces, working in both hospitals and private neurology clinics, between November 2024 and January 2025. A thematic analysis approach was employed to identify the main challenge

... Show More
View Publication Preview PDF
Scopus Clarivate Crossref
Publication Date
Mon May 21 2007
Journal Name
Journal Of Planner And Development
Using the Input - Output Model in building the economic plan using the computer
...Show More Authors

The origin of this technique lies in the analysis of François Kenai (1694-1774), the leader of the School of Naturalists, presented in Tableau Economique. This method was developed by Karl Marx in his analysis of the Departmental Relationships and the nature of these relations in the models of " "He said. The current picture of this type of economic analysis is credited to the Russian economist Vasily Leontif. This analytical model is commonly used in developing economic plans in developing countries (p. 1, p. 86). There are several types of input and output models, such as static model, mobile model, regional models, and so on. However, this research will be confined to the open-ended model, which found areas in practical application.

... Show More
View Publication Preview PDF
Publication Date
Sat Aug 01 2015
Journal Name
Journal Of Engineering
Development of a Blueprint Impact System of the risks on construction projects Implementation
...Show More Authors

In Production and Operations Management the specialists  have  tried to develop a strategy to counter the risks arising from the activities of the organization and of waste of various types and therefore the risk management in the contemporary framework represents a phenomenon of new quality, and can not be this phenomenon to take practical dimensions, but the development of culture of the organization towards the risks and deal with all aspects and paint ways to address them within an integrated program, and requires new skills and systems provide accurate information capable of coordination between the various parties within the organization.

     The research aims to develop a blu

... Show More
View Publication Preview PDF
Publication Date
Sun Apr 30 2017
Journal Name
Journal Of Engineering
Effect of Construction Joints on the Behavior of Reinforced Concrete Beams
...Show More Authors

In this study, the effect of construction joints on the performance of reinforced concrete beams was experimentally investigated. Seven beam specimens, with dimensions of 200×100×1000 mm, were fabricated. The variables were considered including; the location and configuration of the joints. One beam was cast without a joint (Reference specimen), two specimens were fabricated with a one horizontal joint located either at tension, or compression zone. The fourth
beam had two horizontal joints placed at tension, and compression area. The remaining specimens were with one or two inclined joints positioned at the shear span or beam’s mid-span. The specimens were subjected to a monotonic central concentrated loading until the failure. T

... Show More
View Publication Preview PDF
Publication Date
Tue Mar 30 2021
Journal Name
Baghdad Science Journal
Delivery Route Management based on Dijkstra Algorithm
...Show More Authors

For businesses that provide delivery services, the efficiency of the delivery process in terms of punctuality is very important. In addition to increasing customer trust, efficient route management, and selection are required to reduce vehicle fuel costs and expedite delivery. Some small and medium businesses still use conventional methods to manage delivery routes. Decisions to manage delivery schedules and routes do not use any specific methods to expedite the delivery settlement process. This process is inefficient, takes a long time, increases costs and is prone to errors. Therefore, the Dijkstra algorithm has been used to improve the delivery management process. A delivery management system was developed to help managers and drivers

... Show More
View Publication Preview PDF
Scopus (2)
Scopus Clarivate Crossref
Publication Date
Sun Dec 03 2017
Journal Name
Baghdad Science Journal
Network Self-Fault Management Based on Multi-Intelligent Agents and Windows Management Instrumentation (WMI)
...Show More Authors

This paper proposed a new method for network self-fault management (NSFM) based on two technologies: intelligent agent to automate fault management tasks, and Windows Management Instrumentations (WMI) to identify the fault faster when resources are independent (different type of devices). The proposed network self-fault management reduced the load of network traffic by reducing the request and response between the server and client, which achieves less downtime for each node in state of fault occurring in the client. The performance of the proposed system is measured by three measures: efficiency, availability, and reliability. A high efficiency average is obtained depending on the faults occurred in the system which reaches to

... Show More
View Publication Preview PDF
Scopus Crossref
Publication Date
Tue Jun 15 2021
Journal Name
Iraqi Journal Of Pharmaceutical Sciences ( P-issn 1683 - 3597 E-issn 2521 - 3512)
Evaluating Patient Safety Culture in Iraqi Community Pharmacies
...Show More Authors

Patient safety is the main issue in health care organization, the Agency for Healthcare Research and Quality defines it as, “freedom from accidental or preventable injuries produced by medical care. Thus, practices or interventions that improve patient safety are those that reduce the occurrence of preventable adverse events”. The purpose of this study was to evaluate Iraqi pharmacist perception about the culture of patient safety. As well as estimate whether safety is a principal issue in their pharmaceutical practice this study was carried out on 435 pharmacists who are working in community pharmacies in various Iraqi provinces. A survey was distributed via the internet during the period from May to June 2020. A community pharmacy

... Show More
View Publication Preview PDF
Scopus (3)
Crossref (2)
Scopus Crossref
Publication Date
Fri Jul 21 2023
Journal Name
Journal Of Engineering
Laboratory Investigation on Roller Compaction Technique in Concrete Construction
...Show More Authors

Roller compacted concrete (RCC) is a concrete compacted by roller compaction. The concrete mixture in its unhardened state must support a roller while being compacted. The aim of this research work was to investigate the behavior and properties of roller compacted concrete when constructed in the laboratory using roller compactor manufactured in local market to simulate the field conditions. The roller compaction was conducts in three stages; each stage has different loading and number of passes of the roller. For the first stage, a load of (24) kg and (5) passes in each direction had been employed. For the second stage, a load of (104) kg and (10) passes in each direction were conducted. Finally, at the third stage, a load of (183) kg a

... Show More
View Publication Preview PDF
Crossref (3)
Crossref