The purpose of this study is aimed to lay down an arranged platform suited to Iraqi constructional associations which in charge to carry out multi constructional projects, as it fulfilled management requirements and supervising, so that low - cost projects will be controlled in due term and quality. Based on primary info and observed data collected, the study thesis has been formulated in this way: Iraqi constructional sector bodies which are in charge to implement simultaneously multi constructional projects in need to reformulate its organized structure so that it will be more fitted to management and control of these projects. This thesis includes a
theoretical part contained presenting the most important resources locally and internationally where it has direct relation with this study subject. Also it touches on the arrangement term and the kinds of organized structure of the multi constructional projects and control it. And its field part included in its first section studying the organized structure and functional arrangement practised in one of the Iraqi constructional projects. in charge of implemented simultaneously multi construction and exposing the defection of this arrangement. The second section of this study included reviewing the organized structure used by some of constructed corporations and foreign companies of implementing multi constructional projects .Thus, the deficiency points of the organized structure and the arrangement followed in Iraqi conduction sectors recognized and what it causes of control defections in the limitation of these
projects. The deficiency points have been solved by developing a proposed system of the organized structure to administering and controlling of the multi constructional projects. The implementation of these projects have been controlled from its draw phase and passing the design phase and reference and implementation phase till the first deliver.
Pushover analysis is an efficient method for the seismic evaluation of buildings under severe earthquakes. This paper aims to develop and verify the pushover analysis methodology for reinforced concrete frames. This technique depends on a nonlinear representation of the structure by using SAP2000 software. The properties of plastic hinges will be defined by generating the moment-curvature analysis for all the frame sections (beams and columns). The verification of the technique above was compared with the previous study for two-dimensional frames (4-and 7-story frames). The former study leaned on automatic identification of positive and negative moments, where the concrete sections and steel reinforcement quantities the
... Show Moreالخلفية: العقدية المقيحة المعروفة أيضًا باسم ""(GAS) هي احدى مسببات الأمراض ذات الأهمية الصحية العامة، حيث تصيب 18.1 مليون شخص في جميع أنحاء العالم وتقتل 500000 شخص كل عام. الهدف: حددت هذه المراجعة المقالات المنشورة حول عوامل الخطر واستراتيجيات الوقاية والسيطرة لأمراض المكورات العقدية. المواد والأساليب: تم إجراء بحث منهجي لتحديد الأوراق المنشورة على قواعد البيانات الإلكترونية Web of Science و PubMed و Scopus و Google Scholar في مح
... Show MoreGlobally, Sustainability is very quickly becoming a fundamental requirement of the construction industry as it delivers its projects; whether buildings or infrastructures. Throughout more than two decades, many modeling schemes, evaluation tools, and rating systems have been introduced en route to realizing sustainable construction. Many of these, however, lack consensus on evaluation criteria, a robust scientific model that captures the logic behind their sustainability performance evaluation, and therefore experience discrepancies between rated results and actual performance. Moreover, very few of the evaluation tools available satisfactorily address infrastructure projects. The res

The current research aims to provide a philosophical and knowledge framework to explain the issue of organizations dealing with Paradox phenomena by focusing on five main aspects. The first deals with the concept of paradox, and the second aspect deals with the types of forces paradox. While the third aspect regards subject of the philosophy of paradox in organization theory and the fourth side deals with methods of solving the paradox. Finally, the last side is exposed to the subject of the paradoxes of the three provided by the study (L
... Show MoreObjective(s): To Evaluate Diabetes self –management among patients in Baghdad City and to compare
between these patients self-management relative to the type of the disease.
Methodology: A descriptive design was conducted in Baghdad city, started from November 16th 2017 to the
end of May 17 th 2018 in order to evaluate Diabetes self-management. Purposive (non-probability) sample,
which was consisted of (120) patients who were diagnosed with D.M. The sample is comprised of (60) patient
with diabetes type I and (60) patient with diabetes type II. It is consisted of (60) male and (60) female. A
questionnaire is constructed for the purpose of the study. It is composed of (42) items. Reliability and validity of
the ques
Electromyography (EMG) is being explored for evaluating muscle activity. For gait analysis, EMG needs to be small, lightweight, portable device, and with low power consumption. The proposed superficial EMG (sEMG) system is aimed to be used in rehabilitation centers and biomechanics laboratories for gait analysis in Iraq.
The system is built using MyoWare, which is controlled by using STM32F100 microcontroller. The sEMG signal is transferred via Bluetooth to the computer (about 30m range) for further processing. MATLAB is used for sEMG signal conditioning. The overall system cost (without computer) is about $80. The proposed system is validated using wired NORAXON EMG using the mean root mean squared metho
... Show MoreThe construction industry presents significant high risks of injury and fatality to its workforce. Adopting prevention through design (PtD) principles is reported to have high potential for mitigating such risks and improving safety outcomes. PtD seeks to assess and reduce workplace hazards during the design phase, minimizing unsafe construction conditions. Despite its potential benefits, the construction industry encounters challenges in effectively utilizing PtD. Thus, the implementation of PtD in the US construction industry is limited, and designers’ awareness remains low. This evident lack of utilization warrants further examination of the contributing factors. The goal of this study is to identify and rank PtD utilization ba
... Show More