With the increase in industry and industrial products, quantities of waste have increased worldwide, especially plastic waste, as plastic pollution is considered one of the wastes of the modern era that threatens the environment and living organisms. On this basis, a solution must be found to use this waste and recycle it safely so that it does not threaten the environment. Therefore, this research used plastic waste as an improvement material for clay soil. In this research, two types of tests were conducted, the first of which was a laboratory test, where the undrained shear strength (cohesion), compression index (Cc), and swelling index (Cr) of the improved and unimproved soils were calculated (plastic was added in proportions (0.5, 1, 1.5, 2)%. The second part of the examination was done through physical modeling, where 2% of plastic was used, considered the optimal percentage in this research, and the calculation of the carrying capacity-settlement relationship for both the improved and unimproved soils. Using this percentage of plastic showed an improvement in the relationship between the bearing capacities of soil vs. subsidence, as an increase in the amount of stress was observed from 405 KPa to 459 kPa at 10% of subsidence.
In the present work, bentonite clay was used as an adsorbent for the removal of a new prepared mono azo dye, 4-[6-bromo benzothiazolyl azo] thymol (BTAT) using batch adsorption method. The effect of many factors like adsorption time, adsorbent weight, initial BTAT concentration and temperature has been studied. The equilibrium adsorption data was described using Langmuir and frundlich adsorption isotherm. Based on kinetics study, it was found that the adsorption process follow pseudo second order kinetics. Thermodynamics data such as Gibbes Free energy ∆Gᵒ, entropy ∆Sᵒ and ∆Hᵒ were also determined using Vant Hoff plot.

Twelve pends were selected and distributed on three verticals transects paths on the Tigers river in Al Rasheed county.Passing through land covers, that classified and covers the whole region. Based on the 8 Landsat of the year 2015. It was oriental classified by using Erdas 10.2 . The pedons were distributed on the area of each varicty of these classes. the series of soil according of the transect series (DW74,MMg,DMu6 , Df96) respectively were represented P1 , P2 , P3 , P4 .
The second transits series(DM97,MM5,DM96,DF115) respectively were represented P5 , P6 , P7 , P8 .The third transits series(DM46,MMg,MF12,MM11) re
... Show MoreThe aim of this research is to determine the uranium concentration in soil and water samples taken from different locations from the middle and south of Iraq using fission fragments track registration. Twelve samples of soil and water were taken from middle and South of Iraq. The nuclear reaction used as a source of nuclear fission fragments is U-235 (n.f) obtained by bombardment U-235with thermal neutrons from (Am-Be) neutron source with flux (5X103 n.cm-2.s-1). The concentration values were calculated by a comparison with standard samples recommended by IAEA.The results of the measurements show that the uranium concentration in soil samples were in Thekar (16.38 ppm), AL-Basra (16.1ppm) and (0.78 ppm) in Baghdad, from the results
... Show MoreThe aim of the present work, was measuring of uranium concentrations in 25 soil samples from five locations of Al-Kut city. The samples taken from different depths ranged from soil surface to 60cm step 15 cm, for this measurement of uranium concentrations .The most widely used technique SSNTDs was chosen to be the measurement technique. Results showed that the higher concentrations were in Hai Al- Kafaat which recorded 1.49 ± 0.054 ppm . The uranium content in soil samples were less than permissible limit of UNSCEAR(11.7ppm).
Building Information Modeling (BIM) is extensively used in the construction industry due to its benefits throughout the Project Life Cycle (PLC). BIM can simulate buildings throughout PLC, detect and resolve problems, and improve building visualization that contributes to the representation of actual project details in the construction stage. BIM contributes to project management promotion by detecting problems that lead to conflicts, cost overruns, and time delays. This work aims to implement an effective BIM for the Iraqi construction projects’ life cycle. The methodology used is a literature review to collect the most important factors contributing to the success of BIM implementation, interview the team of the Cent
... Show More
