Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.
Objective: The aim of the study to evaluate the nursing care management for diabetes mellitus patient
with total hip replacement after fractured hip.
Methodology: A field study carried out on patients with diabetes mellitus and have total hip
replacement after fractured hip in orthopedic ward at the hospital of surgical specialization (malefemale)during
January 2002 to January 2003.Physical and psychological nursing
assessment
immediately after the surgery was done for the both subjects (control and experimental) and then a
scientific management with daily nursing care were provided to the experimental subject with daily
nursing care to the patient condition by using a scientific and practical methods and leave th
Abstract
The research aims to diagnose the reality of applying the eighth requirement (operation) of the business continuity management system according to the international standard (ISO 22301: 2019), in the General Tax Authority, which is related to planning, implementing and controlling specific processes and procedures to address risks and opportunities, and the research adopted the checklist of the standard ( ISO 22301: 2019), in obtaining information, to measure the extent of application and documentation, the percentages and the weighted arithmetic mean were relied upon, and the research reached a set of result
... Show MoreA QR code is a type of barcode that can hold more information than the familiar kind scanned at checkouts around the world. The “QR” stands for “Quick Response”, a reference to the speed at which the large amounts of information they contain can be decoded by scanners. They are being widely used for advertising campaigns, linking to company websites, contest sign-up pages and online menus. In this paper, we propose an efficient module to extract QR code from background and solve problem of rotation in case of inaccurate image taken from mobile camera.
Purpose: The concept of complete street is one of the modern trends concerned with diversifying means of transportation and reducing the disadvantages of mechanical transportation modes. This paper discusses the role of complete streets can play in developing the urban environment in the Alyarmok District of Baghdad. Method/design/approach: The linear regression method used to analyze the opinions of 100 respondents surveyed in the study area in order to find the relationship between the urban environment and the complete street elements. Theoretical framework: The Modern trends in urban planning aim to find alternatives to the policies of traditional transportation planning that focus on vehicular mobi
... Show MoreIn this research, several estimators concerning the estimation are introduced. These estimators are closely related to the hazard function by using one of the nonparametric methods namely the kernel function for censored data type with varying bandwidth and kernel boundary. Two types of bandwidth are used: local bandwidth and global bandwidth. Moreover, four types of boundary kernel are used namely: Rectangle, Epanechnikov, Biquadratic and Triquadratic and the proposed function was employed with all kernel functions. Two different simulation techniques are also used for two experiments to compare these estimators. In most of the cases, the results have proved that the local bandwidth is the best for all the
... Show MoreThe performance quality and searching speed of Block Matching (BM) algorithm are affected by shapes and sizes of the search patterns used in the algorithm. In this paper, Kite Cross Hexagonal Search (KCHS) is proposed. This algorithm uses different search patterns (kite, cross, and hexagonal) to search for the best Motion Vector (MV). In first step, KCHS uses cross search pattern. In second step, it uses one of kite search patterns (up, down, left, or right depending on the first step). In subsequent steps, it uses large/small Hexagonal Search (HS) patterns. This new algorithm is compared with several known fast block matching algorithms. Comparisons are based on search points and Peak Signal to Noise Ratio (PSNR). According to resul
... Show More