Development of an Integrated Construction Management System for Building Estimation
...Show More Authors

Project management are still depending on manual exchange of information based on paper documents. Where design drawings drafting by computer-aided design (CAD), but the data needed by project management software can not be extracted directly from CAD, and must be manually entered by the user. The process of calculation and collection of information from drawings and enter in the project management software needs effort and time with the possibility of errors in the transfer and enter of information. This research presents an integrated computer system for building projects where the extraction and import quantities, through the interpretation of AutoCAD drawing with MS Access database of unit costs and productivities for the pricing and duration of tasks, then exported to MS Project and MS Excel. The system was developed by using Visual Basic and ActiveX automation technology for combining the above software. The system, also, can calculate quantities of materials. The system includes digitizer (on-screen takeoff) calculates the lengths and areas of the drawings to which the form of an image and scanned. The integrated system has been applied to case study, a storages building for hospital 260 beds. The results proved the effectiveness of the system for the conversion of information from the graphical form dwg to numerical formulas xlcx / xlc and mpp can be handled easily pleased and software are covered.

Crossref
View Publication Preview PDF
Quick Preview PDF
Publication Date
Sat Jun 27 2020
Journal Name
Asian Journal Of Civil Engineering
Using measured mile method to quantify the loss of labor productivity in Iraqi construction site
...Show More Authors

View Publication
Scopus (5)
Crossref (5)
Scopus Crossref
Publication Date
Tue Jan 01 2013
Journal Name
Ibn Al-haitham Journal For Pure And Applied Science
Classification and Construction of (k,3)-Arcs on Projective Plane Over Galois Field GF(7)
...Show More Authors

The purpose of this work is to study the classification and construction of (k,3)-arcs in the projective plane PG(2,7). We found that there are two (5,3)-arcs, four (6,3)-arcs, six (7,3)arcs, six (8,3)-arcs, seven (9,3)-arcs, six (10,3)-arcs and six (11,3)-arcs. All of these arcs are incomplete. The number of distinct (12,3)-arcs are six, two of them are complete. There are four distinct (13,3)-arcs, two of them are complete and one (14,3)-arc which is incomplete. There exists one complete (15,3)-arc.

Publication Date
Tue May 01 2018
Journal Name
Practice Periodical On Structural Design And Construction
Hazards and Risk in Construction and the Impact of Incentives and Rewards on Safety Outcomes
...Show More Authors

View Publication
Scopus (32)
Crossref (26)
Scopus Clarivate Crossref
Publication Date
Sun Jun 05 2011
Journal Name
Baghdad Science Journal
Design and Construction of a Testing Platform and Estimating Attenuation Painting Reflectivity to Laser Beam
...Show More Authors

The project has been described the design and construction of a reliable optical testing platform used for evaluate the reflectivity of metal surfaces treated with special paintings required for laser beam attenuation. The platform comprises an Nd-YAG laser system which has been designed and fabricated with specifications to be compatible with their corresponding in laser range finder transmitters used for various applications. The reflectivity of various attenuating paintings, at different detection angles, has been observed. Moreover, the variation of the reflected energy with painting type and metal type to be painted has been studied experimentally. Results illustrated the existence of a definite angle, at which the reflectivity was max

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jan 31 2026
Journal Name
Journal Of Engineering
DESIGN, CONSTRUCTION AND TESTING OF LOW SPEED WIND TUNNEL WITH ITS MEASUREMENT AND INSPECTION DEVICES
...Show More Authors

A low speed open circuit wind tunnel has been designed, manufactured and constructed at the Mechanical Engineering Department at Baghdad University - College of Engineering. The work is one of the pioneer projects adapted by the R & D Office at the Iraqi MOHESR. The present paper describes the first part of the work; that is the design calculations, simulation and construction. It will be followed by a second part that describes testing and calibration of the tunnel. The proposed wind tunnel has a test section with cross sectional area of (0.7 x 0.7 m2) and length of (1.5 m). The maximum speed is about (70 m/s) with empty test section. The contraction ratio is (8.16). Three screens are used to minimize flow disturbances in the test section.

... Show More
View Publication
Publication Date
Mon Feb 08 2021
Journal Name
Public Works Management & Policy
Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study
...Show More Authors

This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is

... Show More
View Publication
Scopus (21)
Crossref (28)
Scopus Clarivate Crossref
Publication Date
Mon Apr 08 2019
Journal Name
International Journal Of Building Pathology And Adaptation
A scientometric analysis of BIM studies in facilities management
...Show More Authors
Purpose

The purpose of this paper is to statistically classify and categorize Building Information Modelling (BIM)-Facility Management (FM) publications in order to extract useful information related to the adoption and use of BIM in FM.

Design/methodology/approach

This study employs a quantitative approach using science mapping techniques to examine BIM-FM publications using Web of Science (WOS) database for the period between 2000 and April 2018.

Findings

The findi

... Show More
View Publication
Scopus (37)
Crossref (34)
Scopus Clarivate Crossref
Publication Date
Wed Jun 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
The Impact of Marketing Culture on Marketing Management Orientations
...Show More Authors

The problem of the study is concerned with the work of The Iraqi Airways Company in political, economic, and social environment that suffers instability for many years. This has its negative outcomes regarding its decisions of providing services  to its markets and customers as a result of the orientations, behavior, and marketing values the company management adopted. The aim of this study is to investigate the marketing philosophy adopted by the management and to identify the extent it suits the materialistic and the human capacities of the company and its current environmental circumstances within the  marketing culture common to the thoughts and behaviors of the management and their employees. And in order to achiev

... Show More
View Publication Preview PDF
Crossref
Publication Date
Sat Jun 01 2019
Journal Name
Geoderma
Effect of cover crop management on soil hydraulic properties
...Show More Authors

View Publication
Scopus (79)
Crossref (79)
Scopus Clarivate Crossref
Publication Date
Sat Oct 01 2016
Journal Name
Journal Of Economics And Administrative Sciences
The role of performance management in Achieving Organizational success
...Show More Authors

 

The idea of this research is the basis of the role exercised by the dimensions of performance management (Performance Planning- performance evaluation- improve the performance and development- feedback - Review and Performance Monitor) In order to achieve the success Organizational Is through the (strategic vision- the operational activity- development of the company- selection of personnel- the company's culture- Leadership and Management- Personal Development - Assessment and Review).And The research aims to identify the extent of the responsibility of performance management in achieving success  Organizational through main hypotheses branched out by the sub-hypotheses to knowing out the&nbs