The information required for construction quantities surveying is not only generated by various participants in different construction phases but also stored in different forms including graphics, text, tables, or various combinations of the three. To report a bill of quantities (BOQ), the project manager has to continuously excerpt information from various resources and record it on papers. Without adequate staff and time, this repetitive and tedious process is difficult for the project manager to handle properly and thus reduces the effectiveness and the accuracy of the quantities surveying process which creates problems during the design, tender, and construction supervision of construction projects for designers and contractors practicing because receipts are based upon actual quantities, such variations have an obvious impact on the contractor’s cash flow, once the actual quantities frequently vary from the estimated quantities listed in the BOQ. Hence, automation quantity surveying system has been developed by using GIS to extract the
data required for the quantity of different components of any construction project from AutoCAD drawings (spatial data), to report a BOQ after querying, manipulation, and analyzing these data. The system has been implemented on the construction project of Al khawarizmy College at Baghdad University in Baghdad. The main results of using this system are automatic generation a bill of quantity (BOQ) directly from design drawing, with overcome to design changing, accurate, fast, and effective method for estimating the quantities, fewer errors in cost estimating, and better documentation for continuously reusing information in all construction phases. The accuracy of GIS quantities had been proved by comparing these quantities with the quantities of site surveying. Then determining the accuracy percentage (A%) of GIS quantities which equals (98.85%), and the regression line that equals 0.999. These values mean; there are big correlation between the estimated quantities by GIS and the quantities of site surveying.
MB Mahmood, BN Dhannoon
This study examines the causes of time delays and cost overruns in a selection of thirty post-disaster reconstruction projects in Iraq. Although delay factors have been studied in many countries and contexts, little data exists from countries under the conditions characterizing Iraq during the last 10-15 years. A case study approach was used, with thirty construction projects of different types and sizes selected from the Baghdad region. Project data was gathered from a survey which was used to build statistical relationships between time and cost delay ratios and delay factors in post disaster projects. The most important delay factors identified were contractor failure, redesigning of designs/plans and change orders, security is
... Show MoreThe Ant System Algorithm (ASA) is a member of the ant colony algorithms family in swarm intelligence methods (part of the Artificial Intelligence field), which is based on the behavior of ants seeking a path and a source of food in their colonies. The aim of This algorithm is to search for an optimal solution for Combinational Optimization Problems (COP) for which is extremely difficult to find solution using the classical methods like linear and non-linear programming methods.
The Ant System Algorithm was used in the management of water resources field in Iraq, specifically for Haditha dam which is one of the most important dams in Iraq. The target is to find out an efficient management system for
... Show MorePhenytoin selective electrodes were constructed based on penytoin-phosphotungstate (Ph-PT) complex with different plasticizers; di-butyl phosphate (DBP), tri-butyl phosphate (TBP), di-butyl phthalate (DBPH),and o-nitro phenyl octyl ether (NPOE) phthalate. The electrodes based on DBPH, ONPOE plasticizers gave Narnistain slope which are, 56.4 and 55.3mV/decade with detection limit of 1.9x10-5 M , 1.8x10-5 and concentration range 10-1 to 10-4 M and pH range 3.0 – 8.0. The electrodes based on TBP and DBP showed non-Nernistain slopes, 40.2,40.5 mV/decade for both plasticizers. Interfering of some cations was investigated and shows no interfering with electrodes response. Potentiometric methods were used for measuring phenytion in
... Show MoreConstruction projects need methods and techniques to ensure the level of quality and commensurate with the level required and documented in the project contract. The quality of the project is affected by the quality of the inputs and accompanying procedures in the construction of the project.
Al-Rumaitha residential project found that the quality of the concrete for the ceilings in the research sample (the roof of the third floor of buildings A25 and A26) and (roof of the second floor of buildings A27, A28, A29, A30, A31, A32 and A33) and roof of buildings A15 and A16 A19)) is not the required quality level.
The idea of the research came after the need to improve the performance o
... Show MoreBackground: Acute appendicitis is the most common abdominal surgical emergency. The diagnosis of this condition is still essentially clinical and there is difficulty in the clinical diagnosis, especially among elderly, children and patients with a typical presentation, so early and accurate diagnosis of acute appendicitis is important to avoid its complications.Objectives: To evaluate the degree of accuracy of Alvarado scoring system in the diagnosis of acute appendicitis.Method: Two hundred patients were admitted to the Alkindy Teaching Hospital from January 2011 to april 2014- presented with symptoms and signs suggestive of acute appendicitis. After examination and investigations all patients were given a score according to Alvarado sc
... Show MoreThis paper presents a brief study undertaken for improving the performance of information and communication management of construction projects through investing in information and communication technologies (ICT). The work aims at first to investigate and diagnose the problems, challenges, weaknesses, and inefficiencies related to information and communication management in projects in the construction industry of Iraq. Studying the diagnosed matters and the different solutions of ICT to improve project management performance is following the investigation process. The research presents a technological system suggested to process a lot of the diagnosed problems, challenges, weakness, and inefficiencies of the construction projects and t
... Show More
XML is being incorporated into the foundation of E-business data applications. This paper addresses the problem of the freeform information that stored in any organization and how XML with using this new approach will make the operation of the search very efficient and time consuming. This paper introduces new solution and methodology that has been developed to capture and manage such unstructured freeform information (multi information) depending on the use of XML schema technologies, neural network idea and object oriented relational database, in order to provide a practical solution for efficiently management multi freeform information system.