Visualization of water flow around different bluff bodies at different Reynolds number ranging (1505 - 2492) was realized by designing and building a test rig which contains an open channel capable to ensure water velocity range (4-8cm/s) in this channel. Hydrogen bubbles generated from the ionized water using DC power supply are visualized by a light source and photographed by a digital camera. Flow pattern around a circular disk of (3.6cm) diameter and (3mm) thickness, a sphere of (3.8cm) diameter and a cylinder of
(3.2cm) diameter and (10cm) length are studied qualitatively. Parameters of the vortex ring generated in the wake region of the disk and the separation angle of water stream lines from the surface of the sphere are plotted versus Reynolds number. Proper empirical formulas are investigated to describe the behavior of vortex ring parameters and separation angle versus Reynolds number. Vortex growth history in the wake region of the cylinder is identified by analyzing the photographs extracted from the digital camera used for
photography purposes. Water velocity measurement in the upstream region and near the edge of the disk is conducted at different Reynolds number by measuring the length of Hydrogen bubble pulse streaks generated in the upstream region of the disk using electronic pulse generator circuit. Special electronic circuit is designed and fabricated to cut off the applied DC voltage. The calibration of the designed pulse generator is conducted using the proper oscilloscope device. The pictures extracted from the digital camera are used for analyzing the generated Hydrogen pulses.
Through the last decade, Integrated Project Delivery (IPD) methodology considers one of the new contractual relations that are also on the way to further integrate the process of combining design and instruction. On the other hand, Building Information Modeling (BIM) made significant advancements in coordinating the planning and construction processes. It is being used more often in conjunction with traditional delivery methods. In this paper, the researcher will present the achievement of IPD methodology by using BIM through applying on the design of the financial commission building in Mayssan Oil Company in Iraq. The building has not been constructed yet and it was designed by usin
Many industrial systems involve multiple criteria and objectives, and they are very complex problems in computational science, such as task scheduling. We propose bi-criteria and bi-objective scheduling problems, which are solved by two nature-inspired evolutionary algorithms, such as Simulated Annealing (SA) and Bee Algorithm (BA). This problem is characterized by scheduling a batch of tasks on multiple machines, and it is fundamental because the solution should focus on the simultaneous optimization of two conflicting objectives: the makespan minimization and the total tardiness minimization. This problem is NP-Hard, and therefore, two evolutionary methods were used to search for solutions intelligently in this huge, very complex
... Show MoreAbstract
The prevention of bankruptcy not only prolongs the economic life of the company and increases its financial performance, but also helps to improve the general economic well-being of the country. Therefore, forecasting the financial shortfall can affect various factors and affect different aspects of the company, including dividends. In this regard, this study examines the prediction of the financial deficit of companies that use the logistic regression method and its impact on the earnings per share of companies listed on the Iraqi Stock Exchange. The time period of the research is from 2015 to 2020, where 33 companies that were accepted in the Iraqi Stock Exchange were selected as a sample, and the res
... Show MoreThe importance of this research is to clarify the nature and the relationship between the indicators of financial policy and banking stability in Iraq, as well as to find a composite index reflects the state of banking stability in Iraq in order to provide an appropriate means to help policymakers in making appropriate decisions before the occurrence of financial crises.
Hence, the problem of research is that the fiscal policy has implications for the macro economy and does not rule out its impact on banking stability. Moreover, the central bank does not possess a single indicator that reflects the stability of the banking system, rather than the scattered indicators that depend o
... Show MoreAlthough Friction Stir Welding (FSW) is broadly invested in joining aluminum alloys, welding T-joint configurations display revealing challenges due to the interface’s intricate material flow and stress development. Defect formation, including voids and lack of fusion, as well as sudden response forces and residual stresses, can substantially undermine joint performance. This study presents an innovative three-dimensional finite element model to predict the coupled thermomechanical conditions experienced during the friction stir welding (FSW) of AA 6061-T6 lap T-joint design. The study identifies the geometrical parameters of the FSW tool, including shoulder and pin diameters, as well as pin form (cylindrical and tapered), as critical var
... Show MoreIn the present study, the effect of new cross-section fin geometries on overall thermal/fluid performance had been investigated. The cross-section included the base original geometry of (triangular, square, circular, and elliptical pin fins) by adding exterior extra fins along the sides of the origin fins. The present extra fins include rectangular extra fin of 2 mm (height) and 4 mm (width) and triangular extra fin of 2 mm (base) 4 mm (height). The use of entropy generation minimization method (EGM) allows the combined effect of thermal resistance and pressure drop to be assessed through the simultaneous interaction with the heat sink. A general dimensionless expression for the entropy generation rate is obtained by con
... Show More