In this study, the electro-hydraulic servo system for speed control of fixed displacement hydraulic motor using proportional valve and (PID) controller is investigated theoretically ,experimentally and simulation . The theoretical part includes the derivation of the nonlinear mathematical model equation of (valve – motor ) combination system and the derivation of the transfer function for the complete hydraulic system , the stability test of the system during the operation through the transfer function using MATLAB package
V7.1 have been done. An experimental part includes design and built hydraulic test rig and simple PID controller .The best PID gains have been calculated experimentally and simulation, speed control performance tests for the system at different thermal conditions for hydraulic oil have been done , Simulation analysis for (EHSS) using Automation Studio package V5.2 have been done . Comparison was made between experimental work and simulation work .The experimental results show good performance for (EHSS) using simple (PID) controller at hydraulic oil temperature around (60 – 70 ) and good speed response and performance for hydraulic motor with constant rotation speed (700) rpm with different load disturbance applied on the hydraulic motor .
The change in the size of the droplets during the pesticide application process could have a negative impact on the percentage of drift or the losses of pesticides to the environment. One of the factors that could affect the droplet size produced from a single nozzle is the internal design of the nozzle itself, in addition to the wear of the nozzle orifice as a result of the usage time. In this research, three types of nozzles with different internal designs were used (Turbo TeeJet (TT), Turbo TwinJet (TTj 6011003), and Drift Guard (DG 11003)). The nozzles were subjected to an accelerated wear test for one hundred hours, and different droplet size parameters (Dv 0.1, Dv 0.5, Dv 0.9),
In this research was to use the method of classic dynamic programming (CDP) and the method of fuzzy dynamic programming (FDP) to controlling the inventory in N periods and only one substance ,in order to minimize the total cost and determining the required quantity in warehouse rusafa principal of the ministry of commerce . A comparison was made between the two techniques، We found that the value of fuzzy total cost is less than that the value of classic total cost
One of the most important problems of Iraqi construction projects is the cost variances, so it is important to identify the problems and shortcomings that cause poor cost control. Through the utilization of questionnaires, the study evaluated how project costs were managed and reported. The questionnaire was distributed to 180 professionals working in the Iraqi construction sector, with a response rate of 91%. The results showed that a high percentage of projects are implemented with a difference between real and estimated costs, and the process of documenting cost data needs to be more secure. On the other hand, there is a weakness in providing the necessary work structure information to monitor costs and a lack of proc
... Show MoreThe study aims to make an in-depth analysis and the financial account components in the Iraqi balance of payments because it reflects the economic center of the country towards outside world, it also helps in making decision about monetary and financial policies, finance and foreign Trade the importance of FDI for Iraq lies as an important sources as wells provides advanced technology and job chances, It also avoids the country negative effects of borrowing processes from abroad . for analyzing direct and indirect foreign investment on the balance of payments and financial account in a period between (2003 to 2015), a community and research sample have been selected, presented in CBI/ Balance of payments. Department,
... Show MoreThis research aims to examine the relationship between hydrothermal alteration and mineralization (ore mineralogy) in the study area and geological structures in the deformation mechanism. The hydrothermal alteration was determined based on petrographic analysis, and ore mineralogy which was determined based on the ore microscopic analysis. The deformation mechanism is determined by paleo stress analysis using win-tensor, and the direction of principal stress on joints/veins and faults is calculated by the right-dihedron method. Hydrothermal alteration includes silicification, argillic, propylitic, and phyllic alterations; and ore mineralogy consists of stibnite, cinnabar, pyrite, chalcopyrite, sphalerite, covellite, hematite, and a
... Show MoreThe paper is concerned with the state and proof of the existence theorem of a unique solution (state vector) of couple nonlinear hyperbolic equations (CNLHEQS) via the Galerkin method (GM) with the Aubin theorem. When the continuous classical boundary control vector (CCBCV) is known, the theorem of existence a CCBOCV with equality and inequality state vector constraints (EIESVC) is stated and proved, the existence theorem of a unique solution of the adjoint couple equations (ADCEQS) associated with the state equations is studied. The Frcéhet derivative derivation of the "Hamiltonian" is obtained. Finally the necessary theorem (necessary conditions "NCs") and the sufficient theorem (sufficient conditions" SCs") for optimality of the stat
... Show More
